Planning application
The application site is located on lands to the north of A37, to the west of the existing Dunbeg Wind Farm and lands to the south of A37 adjacent to a disused quarry, in the townlands of Dunbeg and Dunmore, 6.2km north east of Limavady
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed Dunbeg South Extension Wind Farm comprising 4no. three bladed wind turbines, each up to 149.9m maximum tip height; associated electricity transformers; underground cabling; access tracks; turning heads; site entrances; crane hardstandings; control building and substation compound and off-site areas of widening to the public road and all ancillary works. During construction and commissioning there would be a number of temporary works including a construction compound with car parking; temporary parts of crane hardstandings and welfare facilities.
As published by the council, reference LA01/2024/1221/F
Application record
- Reference
- LA01/2024/1221/F
- Type
- Full
- Status
- Consultation Open
- Received
- 1 Nov 2024
- Validated
- 1 Nov 2024
- Ward
- Magilligan
Timeline
Dates from the published record
-
1 Nov 2024
Received by Causeway Coast and Glens
-
27 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 December 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Causeway Coast and Glens took a median of 95 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
53 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Causeway Coast and Glens for determination, against a statutory target of eight weeks. Over the last year Causeway Coast and Glens decided full applications in a median of 120 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Causeway Coast and Glens
-
LA01/2026/1075/F Awaiting decision
13 Cappagh Grove, Portstewart
Addition of single storey flat roof extension to rear of property.
-
LA01/2026/0501/F Granted
250m South West of No. 8 Straid Road, Ballycastle
Retrospective Farm Diversification Scheme for a Camp Site & Alpaca Walking Tours and Occasional Open Farm Days (maximum 6 per annum) and associated facilities and amenities, Toilet Block, Reception Hut, Craft Barn, Children's Play Area & Parking.
-
LA01/2026/1012/F Granted
27 Main Street, Limavady
Change of use of the first-floor premises to provide 4no. self-contained residential apartments, comprising of 2no. 1 bedroom apartments to the front (within the existing residential accommodation) and 2no. 2 bedroom apartments to the rear (within the existing storage accommodation serving to the ground floor shop), including alterations to the roof, fenestration and internal layout.
-
LA01/2026/1063/F Awaiting decision
Public footpath approximately 64 metres East of 10 Moyle Road, Ballycastle
Proposed installation of telephone kiosk on public footpath
-
LA01/2026/1055/F Awaiting decision
182 Agivey Road, Aghadowey, Coleraine
Replacment Dwelling (Existing Dwelling to remain as Outhouse/Store)