Skip to content
PlanIndex Get alerts
Menu

Planning application

The Manor House Churchquarter, Rathlin Island, Ballycastle, BT54 6RT

Granted Causeway Coast and Glens LA01/2023/0875/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retention of installed solar pv panels and electric vehicle charging point

As published by the council, reference LA01/2023/0875/LBC

Application record

Reference
LA01/2023/0875/LBC
Type
Listed Building Consent
Status
Determined
Decision
Granted
Received
14 Aug 2023
Validated
29 Aug 2023
Decided
19 Dec 2024
Ward
Torr Head and Rathlin
Postcode
BT54 6RT

Site history

Applications at this address on the Causeway Coast and Glens register

This site has had 2 applications since 2023: 2 approved, 0 refused.

  • The Manor House Churchquarter, Rathlin Island, Ballycastle, BT54 6RT

    Retention of installed solar pv panels and electric vehicle charging point

    Decided 19 Dec 2024 Full applications

Timeline

Dates from the published record

  1. 14 Aug 2023

    Received by Causeway Coast and Glens

  2. 29 Aug 2023

    Validated

    Checked as complete and ready for consideration.

  3. 19 Dec 2024

    Decision issued: Granted

  4. 28 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

17 applications on PlanIndex · across 5 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

38 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Causeway Coast and Glens granted permission on 19 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Causeway Coast and Glens

  • Roe Valley Resort, 10 Lisnakilly Road, Limavady

    Internal alterations to five first floor bedrooms - four bedrooms will have new openings created and new additions; one bedroom will have new additions

    22 Apr 2026 Heritage and listed buildings
  • LA01/2026/0887/LBC Awaiting decision

    St Marys Chapel, 99 Grove Road, Swatragh, Maghera

    Repairs carried out to flat roof on the tower and re point parts off the existing tower

    20 Aug 2026 Heritage and listed buildings
  • LA01/2026/0868/LBC Awaiting decision

    Rear of No. 14 Ann Street, Ballycastle

    Proposed Change of Use from storage to two units of accommodation for short-term letting.

    19 Aug 2026 Heritage and listed buildings
  • Roe Valley Resort 10 Lisnakilly Road, Limavady

    External alterations to include the installation of new hardwood external door with ironmongery, and erection of low-level curved walls and pillars to front entrance. Internal alterations to include the removal of stairwell, creation of two new openings to the left and right of entrance hall, reinstatement of fireplace and glazing to first floor balcony arches.

    31 Mar 2026 Heritage and listed buildings
  • 140 Main Street, Garvagh

    Proposed window and external door repair works and replacement.

    4 Feb 2026 Heritage and listed buildings