Planning application
LA01/2026/0593/LBC
Coleraine Town Hall, The Diamond, Coleraine
Proposal
Proposed replacement window at Coleraine Town Hall
As published by the council, reference LA01/2026/0593/LBC
Timeline
Dates from the published record
-
3 Jun 2026
Received by Causeway Coast and Glens
-
9 Jun 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Causeway Coast and Glens for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About heritage and listed buildings applications
How this application type works
Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.
More on heritage and listed buildings applications in our guide
Nearby applications
Within 500 metres
-
LA01/2026/0708/F Awaiting decision
9 Queen Street, Coleraine
Change of use from existing retail premises (Class A1) to a community and educational facility (Class D1), providing a dedicated hub for postnatal and maternity support.
-
LA01/2026/0323/F Withdrawn
Danske Bank, 33 The Diamond, Coleraine
Proposal to construct an external ramped access to the right hand gable elevation to form accessible access into the bank. The existing Automated Principal Entrance Doors and internal Platform Lift are to be retained.
-
LA01/2026/0074/F Granted
Outside Post Office, New Row, Coleraine
Erection of a freestanding Street Hub, comprising two digital 75-inch LCD display screens each side of the unit, to replace an existing BT payphone kiosk.
-
LA01/2026/0075/A Granted
Outside Post Office, New Row, Coleraine
Proposed 2no. digital 75-inch LCD display screens on each side of Digital Street Hub (illuminated)
-
LA01/2026/0272/F Granted
1st Floor, 13-15 Church Street, Coleraine
Retrospective Application for a Change of Use from Retail to be a Darts/Pool Hall
-
LA01/2025/1090/DC Decided
Land South of and opposite 2-14 Circular Road, Coleraine and north of The Mall car park, Coleraine
Discharge of Condition 5 of LA01/2023/0954/F
Other heritage and listed buildings applications
In Causeway Coast and Glens
-
LA01/2026/0164/LBC Granted
140 Main Street, Garvagh
Proposed window and external door repair works and replacement.
-
LA01/2026/0095/LBC Refused
The Bilberry Cafe, 61 Main Street, Bushmills
Retrospective application for consent to display 10x advertisement signs on a Listed Building
-
LA01/2026/0692/DCA Granted
41 Quay Road, Ballycastle
Demolition of existing dwelling and section of front wall at entrance
-
LA01/2026/0677/LBC Granted
77 Aghanloo Road, Limavady
Single storey extension to existing porch of listed building. Change of decorated colour of listed building external walls, window sills and mouldings back to original colours. Replacement of existing outbuilding with new garden room building of similar scale and materials. Removal of existing timber pergola and modular temporary shed. Alteration to alignment and extent of existing low level retaining walls. Alterations to hard landscaping. Install new french drains to perimeter of listed building.
-
LA01/2026/0425/LBC Granted
Unit 7, 25 Mill Street, Cushendall, Ballymena
The installation of Solar PV Panels to the building situated in the courtyard to the rear of The Old Schoolhouse and the material change of detail, refurbishment and thermal upgrade of the existing windows of the Old Schoolhouse.