Planning application
Gateway Holiday Park, Bynea, Llanelli, SA14 9SN
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Use of land for the siting of static caravans (Fiji field)(24 units)(Part retrospective) (Resubmission of PL/08225)
As published by the council, reference PL/10740
Application record
- Reference
- PL/10740
- Type
- Full planning permission
- Status
- Awaiting Decision
- Received
- 2 Apr 2026
- Validated
- 23 Apr 2026
- Ward
- Bynea
- Parish
- Llanelli Rural (Historic)
- Postcode
- SA14 9SN
Site history
Applications at this address on the Carmarthenshire register
This site has had 3 applications since 2026.
-
PL/11150 Awaiting decision
Gateway Holiday Park, Bynea, Llanelli, SA14 9SN
Use of land for the siting of glamping pods (40 units) [part retrospective] and communal amenity area (resubmission of PL/08224 refused on 16.07.25)
-
PL/10741 Awaiting decision
Gateway Holiday Park, Bynea, Llanelli, SA14 9SN
Use of land for the siting of touring caravans (Springboks Field)(104 units) (Retrospective) (Resubmission of PL/08226)
Timeline
Dates from the published record
-
2 Apr 2026
Received by Carmarthenshire
-
23 Apr 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
14 Aug 2026
Status changed to Consultation Period
Previously Awaiting Decision.
-
2 Sep 2026
Status changed to Awaiting Decision
Previously Consultation Period.
-
Decision
Awaiting decision
Decision expected by 18 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Carmarthenshire took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Carmarthenshire for determination, against a statutory target of eight weeks. Over the last year Carmarthenshire decided full applications in a median of 79 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Gateway Holiday Park, Bynea, Llanelli, SA14 9SN
77% historically approved · decision due ~18 Jun
Use of land for the siting of touring caravans (Springboks Field)(104 units) (Retrospective) (Resubmission of PL/08226)
Awaiting decision Full applications 26 docsMajor scheme -
Gateway Holiday Park, Bynea, Llanelli, SA14 9SN
77% historically approved · decision due ~10 Sep
Use of land for the siting of glamping pods (40 units) [part retrospective] and communal amenity area (resubmission of PL/08224 refused on 16.07.25)
Awaiting decision Full applications 22 docsMajor scheme -
-
BRYN CARNAFON, DYFFRYN ROAD, BYNEA, LLANELLI, SA14 9SN
DEMOLITION OF EXISTING GARAGE AND CONSTRUCTION OF NEW GARAGE WITH INTEGRAL ELECTRICAL MAINS ROOM
Granted Full applications Demolition 10 docs -
GATEWAY HOLIDAY PARK, DYFFRYN ROAD, BYNEA, LLANELLI, SA14 9SN
CONSTRUCTION OF 2NO 3M X 3M ENTRANCE PORCHES AND 1NO CANOPY OVER EXTERNAL DOOR
Granted Full applications 9 docs -
GATEWAY HOLIDAY PARK, DYFFRYN ROAD, BYNEA, LLANELLI, SA14 9SN
RETROSPECTIVE APPLICATION FOR PART DEMOLITION OF REDUNDANT FARM BUILDING, RECONSTRUCTION OF ROOF AND NEW WALLS AND INSTALLATION OF NEW BIOMASS EQUIPMENT
Granted Full applications Demolition 9 docs
Other full applications
In Carmarthenshire
-
PL/11180 Refused
Land at Waunhwyad Farm, Glanamman, Ammanford, SA18 2YH
Retention of Workshop
-
PL/10883 Granted
Car Park to the north of Building 14 Parc Dewi Sant, Carmarthen, SA31 3BJ
The proposed development of 6 no. electric vehicle charging point upstands and associated charging infrastructure, electrical cabinet and all associated works
-
PL/10614 Granted
Castle Motors, Station Road, Newcastle Emlyn, SA38 9BX
Proposed erection of a portal frame building adjoining the existing workshop and van sales offices building to form separate storage and distribution units for rental purposes and all associated works
-
PL/11389 Awaiting decision
Ysgubor Mair, Meinciau, Kidwelly, SA17 5LH
Groundworks to form new menage
-
PL/10975 Granted
To the front of Nationwide, 47 Stepney Street, Llanelli, SA15 3QQ
Installation of stand alone frame with defibrillator and bleed kit cabinets for community use, in the vicinity a Nationwide Building Society branch