Planning application
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of two new Air Source Heat Pumps with associated service equipment within existing plant room, junction box within stable yard and cable runs along Castle walls . Introduction of French Drain and permeable pea gravel to ground surface of courtyard with reinstatement of existing flagstones for pedestrian walkway.
As published by the council, reference 25/02850/FUL
Application record
- Reference
- 25/02850/FUL
- Type
- Full Planning Permission
- Status
- Awaiting decision
- Received
- 2 Dec 2025
- Validated
- 27 Dec 2025
- Ward
- PENTYRCH AND ST FAGANS
Site history
Applications at this address on the Cardiff register
This site has had 10 applications since 2024: 5 approved, 0 refused.
-
26/01804/LBC Awaiting decision
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Repair and partial rebuilding of a chimney and repair to window to one of the Castle`s rear outbuildings
-
26/01789/DOC Granted
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Discharge of condition 9 (repair of cast iron heating pipes) of 24/02913/LBC
-
26/01553/DOC Awaiting decision
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Partial discharge of Condition 9 (Render), Condition 12 (Lead gutters), Condition 20 (Timber) of 24/01553/LBC.
-
26/01320/NMA Granted
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Proposed Non-Material Amendment to Planning Permission 24/02912/FUL Changes to the proposed location of the ASHPS enclosure
-
26/01226/DOC Awaiting decision
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Partial discharge of Conditions 3 (Scaffolding), 4 (Masonry Cleaning), 7 (Mock-up of ridge ventilation), 10 (Materials Samples), 13 (Slates method statement), 14 (Coping stones method statement), 15 (Lifting floor boards method statement), 16 (Schedule of structural repairs) and 17 (Bat Access) of 24/01553/LBC.
-
26/00784/DOC Granted
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Discharge of Condition 7 (Masonry Specification and Method Statement) of 24/02913/LBC
-
26/00321/DOC Granted
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Re-discharge of Condition 3 (Scaffold Securing) of 24/01553/LBC.
-
25/02851/LBC Awaiting decision
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Installation of two new Air Source Heat Pumps with associated service equipment within existing plant room, junction box within stable yard and cable runs along Castle walls . Introduction of French Drain and permeable pea gravel to ground surface of courtyard with reinstatement of existing flagstones for pedestrian walkway.
-
24/01553/LBC Granted
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Full re-roofing of main range with 'like-for-like' repairs to structural roof members of St Fagans Castle building.
Timeline
Dates from the published record
-
2 Dec 2025
Received by Cardiff
-
27 Dec 2025
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
29 Aug 2026
Status changed to Awaiting decision
Previously Registered.
-
Decision
Awaiting decision
Decision expected by 21 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cardiff took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DB3 Architecture (Aberystwyth Office) Agent, an architecture practice
3 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
29 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Cardiff for determination, against a statutory target of eight weeks. Over the last year Cardiff decided full applications in a median of 85 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
97% historically approved · decision due ~21 Feb
Installation of two new Air Source Heat Pumps with associated service equipment within existing plant room, junction box within stable yard and cable runs along Castle walls . Introduction of French Drain and permeable pea gravel to ground surface of courtyard with reinstatement of existing flagstones for pedestrian walkway.
Awaiting decision Heritage and listed buildings 32 docs -
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
100% historically approved · decision due ~21 Sep
Partial discharge of Condition 9 (Render), Condition 12 (Lead gutters), Condition 20 (Timber) of 24/01553/LBC.
Awaiting decision Conditions 19 docs -
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Full re-roofing of main range with 'like-for-like' repairs to structural roof members of St Fagans Castle building.
Granted Heritage and listed buildings 35 docs -
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
Re-discharge of Condition 3 (Scaffold Securing) of 24/01553/LBC.
Granted Conditions 28 docs -
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
97% historically approved · decision due ~19 Oct
Repair and partial rebuilding of a chimney and repair to window to one of the Castle`s rear outbuildings
Awaiting decision Heritage and listed buildings Windows or glazing 7 docs -
St Fagans Castle Crofft-y-genau Road St Fagans Cardiff
100% historically approved · decision due ~21 Aug
Partial discharge of Conditions 3 (Scaffolding), 4 (Masonry Cleaning), 7 (Mock-up of ridge ventilation), 10 (Materials Samples), 13 (Slates method statement), 14 (Coping stones method statement), 15 (Lifting floor boards method statement), 16 (Schedule of structural repairs) and 17 (Bat Access) of 24/01553/LBC.
Awaiting decision Conditions 15 docs
Other full applications
In Cardiff
-
26/01337/FUL Granted
37 Wyeverne Road Cathays Cardiff CF24 4BG
Extensions and alterations and change of use from dwelling (C3) to House in Multiple Occupation (C4) (HMO).
-
26/01728/FUL Granted
Unit 7b Cardiff Industrial Park Pennine Close Llanishen Cardiff CF14 5DN
Installation of 5 no. external air source heat pump units
-
26/01729/FUL Granted
Unit 7b Cardiff Industrial Park Pennine Close Llanishen Cardiff CF14 5DN
Replacement roller shutter.
-
26/01216/FUL Granted
4 Callaghan Square Butetown Cardiff CF10 5BT
Internal and external alterations to an existing office building at ground floor and part first floor
-
26/02099/FUL Awaiting decision
20 Janet Street Splott Cardiff CF24 2BD
Proposed conversion of dwelling to form two flats