Skip to content
PlanIndex Get alerts
Menu

Planning application

25/02352/FUL

New House Farm Capel Gwilym Road Lisvane Cardiff CF14 9UB

Awaiting decision Cardiff Full Planning Permission

Proposal

Proposed new replacement outbuildings, alterations (including demolition and partial demolition) of existing structures and extensions and alterations to the farmhouse.

As published by the council, reference 25/02352/FUL

Timeline

Dates from the published record

  1. 13 Oct 2025

    Received by Cardiff

  2. 29 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Cardiff for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/02891/WTTPFP Granted

    111 Heol-y-cadno Thornhill Cardiff CF14 9EW

    Silver maple side of 111 Heol Y Cadno - tree pruning to clear buildings and reduce sail area/weight on non-tensile fork as per submitted James Pinder Treecare report.

    8 Dec 2025 265m away Trees
  • 25/02757/WTTPFP Granted

    56 Heol-y-cadno Thornhill Cardiff CF14 9DY

    Ash tree to be felled within 6 months, oak tree to be cut back. Full report attached from third party arborist

    25 Nov 2025 381m away Trees
  • 25/01783/WTTPP Awaiting decision

    52 Woodruff Way Thornhill Cardiff CF14 9FP

    T1 Cherry tree (located in front garden) - Crown lift to 2 metres above ground level over pavement area, prune to attain 1 metre clearance from neighbouring building, prune to remove single primary branch over lawn area

    29 Jul 2025 480m away Trees
  • 26/00659/WTTPFP Granted

    36 Woodruff Way Thornhill Cardiff CF14 9FP

    T2 Whitebeam in front garden crown lift to 2 metres above ground level

    31 Mar 2026 499m away Trees

In Cardiff

  • 26/01029/FUL Granted

    78 Cae Glas Road Rumney Cardiff CF3 3JW

    Single storey rear extensions and change of use to 2 independent dwellings.

    19 May 2026 Full applications
  • 26/00451/FUL Granted

    48 Longcross Street Adamsdown Cardiff CF24 0JW

    Retrospective change of use from class C3 dwellinghouse to C4 House in Multiple Occupation (HMO).

    6 Mar 2026 Full applications
  • 26/01224/FUL Granted

    Unit 10 Eastgate Business Park Wentloog Avenue Trowbridge Cardiff CF3 2EY

    Retrospective application for the installation of an air condenser unit and associated ductwork.

    12 Jun 2026 Full applications
  • 26/01010/FUL Refused

    136 Tewkesbury Street Cathays Cardiff CF24 4QS

    Conversion to class C4 HMO with ground floor rear/side extension.

    18 May 2026 Full applications
  • 26/00310/FUL Granted

    1A Egerton Street Canton Cardiff CF5 1RF

    Demolition of commercial retail warehouse and construction of 4no. dwellings (2no. semi-detached pairs).

    12 Feb 2026 Full applications