Skip to content
PlanIndex Get alerts
Menu

Planning application

2 Dew Crescent Caerau Cardiff CF5 5PB

Awaiting decision Cardiff 24/02172/FUL Full Planning Permission

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed new build house to side of existing property.

As published by the council, reference 24/02172/FUL

Application record

Reference
24/02172/FUL
Type
Full Planning Permission
Status
Registered
Received
11 Sep 2024
Validated
13 Sep 2024
Ward
CAERAU
Postcode
CF5 5PB

Timeline

Dates from the published record

  1. 11 Sep 2024

    Received by Cardiff

  2. 13 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 8 November 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cardiff took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Dinas Powys

30 applications on PlanIndex · across 3 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Cardiff for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Cardiff

  • 26/00351/FUL Granted

    202 Cathedral Road Pontcanna Cardiff CF11 9JF

    Side dormer roof extension, erection of railings and gate over front boundary walls, replacement of windows in existing openings at the front elevation, further external alterations to other elevations, new canopy alongside elevation, removal of rear & side boundary wall and erection of gate to rear alleyway. Demolition of existing garage and rear lean-to extension.

    19 Feb 2026 Full applications
  • 26/00649/FUL Granted

    434 Cowbridge Road East Canton Cardiff CF5 1JN

    Rear extensions, side dormer loft conversion, and additional two residential units with other associated works.

    30 Mar 2026 Full applications
  • 26/01673/FUL Granted

    4 Mackintosh Place Roath Cardiff CF24 4RQ

    Alterations to existing shopfront with associated external alterations

    5 Aug 2026 Full applications
  • 26/01831/FUL Awaiting decision

    Unit 23B Ely Distribution Centre Argyle Way Caerau Cardiff CF5 5NP

    CHANGE OF USE OF EXISTING INDUSTRIAL UNIT TO MOT TESTING STATION AND MOTOR VEHICLE REPAIR WORKSHOP

    28 Aug 2026 Full applications
  • 26/01704/FUL Withdrawn

    Ysgol Gynradd Groes-wen Primary School Rhodfa Plasdwr St Fagans Cardiff Cardiff CF5 2FG

    Development of a green corridor, including childrens play area and kick about area with associated hard and soft landscaping, drainage, engineering and infrastructure works.

    11 Aug 2026 Full applications