Skip to content
PlanIndex Get alerts
Menu

Planning application

St Pancras Yacht Basin Camley Street London N1C 4PN

Awaiting decision Camden 2026/3839/P Variation or Removal of Condition(s)

Relates to 2014/4871/P, 2022/1743/P

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of conditions 2 (approved drawings), and 4 (solar PV panels and water heaters) of planning permission ref. 2022/1743/P dated 25/01/2023 for 'Variation of conditions 2 (approved drawings), 4 (solar water heaters) and 6 (soft and hard landscaping) of planning permission ref no 2014/4871/P dated 09/10/2014 (for Erection of single storey clubhouse, boundary fencing and associated visiting boaters' namely to omit the solar thermal panel from the roof of the clubhouse, relocate the approved solar PV array from the dry dock building to the roof of the clubhouse, and amend condition 4 to require the installation and retention of the solar PV panels in accordance with the approved details.

As published by the council, reference 2026/3839/P

Application record

Reference
2026/3839/P
Type
Variation or Removal of Condition(s)
Status
Registered
Received
7 Sep 2026
Validated
15 Sep 2026
Ward
St Pancras and Somers Town
Postcode
N1C 4PN

Timeline

Dates from the published record

  1. 7 Sep 2026

    Received by Camden

  2. 15 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 17 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 10 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Camden took a median of 42 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 2014/4871/P Granted

    St. Pancras Cruising Club St. Pancras Yacht Basin Camley Street London N1C 4PN

    Erection of single storey clubhouse, boundary fencing and associated visiting boaters' facilities following demolition of existing clubhouse.

    Decided 9 Oct 2014 Full applications
  • 2022/1743/P Granted

    St Pancras Yacht Basin, St Pancras Cruising Club Camley Street London N1C 4PN

    Variation of conditions 2 (approved drawings), 4 (solar water heaters) and 6 (soft and hard landscaping) of planning permission ref no 2014/4871/P dated 09/10/2014 (for Erection of single storey clubhouse, boundary fencing and associated visiting boaters' facilities following demolition of existing clubhouse), namely to allow changes to cladding and openings, new solar PV panels, alterations to ramp and planters.

    Decided 25 Jan 2023 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Camden for determination, against a statutory target of eight weeks. Over the last year Camden decided amendment applications in a median of 49 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Camden

  • 2026/1982/P Granted

    29 Healey Street London NW1 8SR

    Variation of conditions 2 (approved plans) of planning permission 2025/1250/P granted 13/05/2025 (for: 'Erection of part one and part two storey rear extension and roof terrace at second floor; erection of a mansard roof extension.') namely to amend the materiality of the proposed rear elevation joinery.

    Received 18 May, published by the council 24 Jul 2026 Amendments
  • 2026/4008/P Awaiting decision

    6 Murray Street London NW1 9RE

    Non-material amendment to planning permission ref. 2023/3483/P (dated 25/10/2023) for 'Erection of mansard roof extension and replacement shopfront', NAMELY for changes to the rear dormers.

    Received 16 Sep, published by the council 17 Sep 2026 Amendments
  • 2026/3390/P Granted

    The British Museum Great Russell Street London WC1B 3DG

    Amendments to planning permission ref. 2025/0038/P dated 03/03/2025, as amended by ref. 2026/2945/P dated 24/07/2026 for the continued use of single storey structures at the south and north entrances to provide an external search facility to the museum for a temporary period, NAMELY to vary Condition 1 (temporary structure) to allow the continued use of the single storey security structure at the north entrance for a further temporary period.

    Received 7 Aug, published by the council 15 Aug 2026 Amendments
  • 2025/4829/P Granted

    Former Hampstead Police Station 26 Rosslyn Hill London NW3 1PD

    Variation of condition 2 (Approved drawings) of application 2024/1078/P dated 24/07/2025 for 'Change of use from former police station (sui generis) to provide 5 residential units(Use Class C3) and commercial floorspace (Use Class E), space for a private healthcare use (Use Class E(e)). three storey and four storey rear extensions, replacement of windows, external alterations, landscaping, cycle and refuse storage, rooftop plant and associated ancillary works.' changes include replacement of 1970's extension, location of proposed plant, removal and addition of windows on rear elevation, landscaping alterations.

    Received 27 Oct, published by the council 24 Jul 2026 Amendments
  • 2026/1189/P Granted

    Flat 2 47 Compayne Gardens London NW6 3DB

    Variation of condition 2 (approved drawings) of planning permission 2023/3067/P dated 21/06/2024 for 'Extension of existing basement and creation of terrace with bi fold doors and garden access stairs above, new lightwell to the side with metal grille cover, proposed side windows and landscaping to the side and rear' changes include changing location of the lightwell from side to front (Retrospective)

    Received 12 May, published by the council 24 Jul 2026 Amendments