Skip to content
PlanIndex Get alerts
Menu

Planning application

Hampstead Hill Mansions Downshire Hill London NW3 1NY

Awaiting decision Camden 2026/3441/P Full Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Provision of balustrade to the perimeter of the flat roof area to provide safe access for planned maintenance works

As published by the council, reference 2026/3441/P

Application record

Reference
2026/3441/P
Type
Full Planning Permission
Status
Registered
Received
12 Aug 2026
Validated
19 Aug 2026
Ward
Hampstead Town
Postcode
NW3 1NY

Timeline

Dates from the published record

  1. 12 Aug 2026

    Received by Camden

  2. 19 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Camden took a median of 42 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Camden for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 Downshire Hill London NW3 1NT

    2020/0025/L 0m away

    Erection of a single storey rear and side extension following demolition of conservatory; erection of replacement outbuilding; minor internal and external alterations; ground/ patio works including alterations to front garden steps; landscaping and incidental works.

    Granted Heritage and listed buildings Extension Demolition
    Small domestic
  • Hampstead Hill Mansions Downshire Hill London NW3 1NY

    2025/2828/T 0m away

    REAR GARDEN: 1 x Sycamore (T1) - Fell to ground level.

    Granted Trees
  • Hampstead Hill Mansions Downshire Hill London NW3 1NY

    2025/5507/T Submitted 4 Dec 2025 0m away

    REAR GARDEN: 1 x Cherry (T2) - Reduce this stem by 3m - 4m to suitable pruning points.

    Granted Trees 3 docs
  • Hampstead Hill Mansions Downshire Hill London NW3 1NY

    2022/1370/T 0m away

    REAR GARDEN: 1 x Ash (T1) - Reduce crown by 3m on all aspects. 1 x Sycamore (T2) - Reduce height by 2.5m, reduce branches over neighbour's garden by up to 3m, ensuring 2m clearance from building. 1 x Thuja (T4) - Reduce height by 2m. 1 x Mock Orange (T5) - Reduce down to previous cuts, (around 2.5m reduction). 1 x Cherry (T6) - Reduce two leaning stems over grass to 2m below previous, reduce remaining crown back to previous cuts, (1.5m reduction). 1 x Thuja (T7) - Reduce height by 1.5m. 1 x Norway Maple (T8) - Reduce crown back to most recent cuts, (2.5m reduction). 1 x Photinia (T9) - Reduce overlong branches by 2m. 1 x Cherry (T11) - Reduce crown back to previous cuts, (2m reduction). 1 x Apple (T12) - Reduce crown by 3m. 1 x Contorted Willow (T13) - Reduce crown back to previous cuts, (1.5m reduction). 1 x Juniper (T14) - Fell to ground level. 1 x Elder (T15) - Reduce down to 2m. 1 x Sycamore (T16) - Reduce crown by 3m on all aspects.

    Granted Trees
  • Hampstead Hill Mansions Downshire Hill London NW3 1NY

    2024/3849/T 0m away

    REAR SIDE GARDEN: 2 x Sycamores (T1 & T2) - Lift crown by approx. 4m on garage (Annex) axis reducing major lower limbs that extend over boundary, thin and shape top crown.

    Granted Trees
  • Hampstead Hill Mansions Downshire Hill London NW3 1NY

    2026/3668/T Submitted 26 Aug 2026 0m away

    99% historically approved · decision due ~21 Oct

    REAR GARDEN: 1 x Cherry (T2) - Reduce dead stem by approx. 5m to suitable growth points. Reduce remaining stem down to approx5m to suitable growth points to balance crown and reduce wind loading on remaining stem. 1 x Willow (T4) - Reduce back old, historically damaged limb by 1m - 2m back from lawn. Overextended limb running along fence line reduce back by approx. 2m to reduce loading.

    Awaiting decision Trees 2 docs
    Small domestic

In Camden

  • 2026/2516/P Withdrawn

    31 Loveridge Road London Camden NW6 2DU

    Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.

    16 Jun 2026 Full applications
  • 2026/3830/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    4 Sep 2026 Full applications
  • 2026/3282/P Granted

    5 Berkley Road London NW1 8XX

    Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)

    31 Jul 2026 Full applications
  • 2026/0483/P Granted

    100 Avenue Road London NW3 3HF

    Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”

    9 Feb 2026 Full applications
  • 2026/2697/P Awaiting decision

    Flat 1, 73 Eton Avenue London NW3 3EU

    Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.

    3 Sep 2026 Full applications