2026/2987/P

British Museum Great Russell Street London WC1E 7JW

Awaiting decision Camden Approval of Details

Proposal

Details of fenestration and vents required by Condition 6 of planning permission ref 2023/4648/P dated 16/10/2024 for Erection of new energy centre incorporating maintenance support accommodation to internal West Road, new substation off Montague Street, all together with associated internal and external works, service runs, erection of plant, landscaping, and temporary works associated with construction following demolition of existing Energy Centre to internal West Road and removal of temporary buildings to the south of the existing energy centre on the internal West Road and to the north and east of the White Wing facing Montague Street.

As published by the council, reference 2026/2987/P

Timeline

Dates from the published record

  1. 16 Jul 2026

    Received by Camden

  2. 24 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Camden for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2015/0219/L Granted

    British Museum Great Russell Street London WC1B 3DG

    Retention of the temporary floor in the Round Reading Room at the British Museum for a further 6 months.

    12 May 2015 0m away Heritage and listed buildings
  • 2023/4648/P Granted

    British Museum Great Russell Street London WC1E 7JW

    Erection of new energy centre incorporating maintenance support accommodation to internal West Road, new substation off Montague Street, all together with associated internal and external works, service runs, erection of plant, landscaping, and temporary works associated with construction following demolition of existing Energy Centre to internal West Road and removal of temporary buildings to the south of the existing energy centre on the internal West Road and to the north and east of the White Wing facing Montague Street.

    16 Oct 2024 0m away Full applications
  • 2015/1094/L Granted

    British Museum Great Russell Street London WC1B 3DG

    Extend the temporary listed building consent (references 2007/2934/L, 2008/1376/L, 2011/0605/P) for ticket desks on east & west sides of Great Court for 3 years.

    3 Jul 2015 0m away Heritage and listed buildings
  • 2020/1682/L Granted

    British Museum Great Russell Street London WC1B 3DG

    Installation of fire door between Gallery 60 and heavy goods lift, Level 6 North Range.

    19 May 2020 0m away Heritage and listed buildings
  • 2014/4411/L Granted

    British Museum Great Russell Street London WC1B 3DG

    Details of wall display cabinets (condition 2a); freestanding cabinets (2b); replacement window in south-east corner (2c); and replacement oak double doors (2d) as required by listed building consent (2013/4613/L) for various internal alterations and repair works to Middle Room.

    22 Aug 2014 0m away Heritage and listed buildings
  • 2018/1757/P Granted

    British Museum Great Russell Street London WC1B 3DG

    Installation of ventilation extract point and a louvre extract from existing WC.

    24 May 2018 0m away Full applications

In Camden

  • 2026/0743/P Granted

    34-42 Middlesex House Cleveland Street London W1T 4JE

    Details pursuant to Condition 6 (Living Roof) of planning permission 2024/2020/P granted on 12/09/2024 "(Minor refurbishment and rooftop works including: upgraded entrance and reception area; new cycle storage and associated end of trip facilities; new/replaced rooftop plant and plant enclosures; creation of a rooftop amenity area with pavilion structure; hard and soft rooftop landscaping; and all associated and ancillary works)."

    25 Feb 2026 Full applications
  • 2026/3202/P Awaiting decision

    Flat 1 94 Goldhurst Terrace London NW6 3HS

    Erection of a single storey rear extension.

    30 Jul 2026 Full applications
  • 2026/0335/P Granted

    216A West End Lane London NW6 1UX

    Conversion of 1 x 7 bedroom flat (C3) and 1 x 2 bedroom flat (C3) to 1 x 7 bedroom House in Multiple Occupation (Sui-generis) and 1 x 1 bedroom flat (C3) and installation of four rooflights

    28 Jan 2026 Full applications
  • 2026/3229/P Awaiting decision

    52 Neal Street London WC2H 9PA

    Alterations to the shopfront and installation of awnings.

    29 Jul 2026 Full applications
  • 2026/2160/P Granted

    120 College Place London NW1 0DJ

    Erection of a rear roof extension, formation of a rear roof terrace and installation of 2x rooflights to front roof slope, and associated works.

    28 May 2026 Full applications