Skip to content
PlanIndex Get alerts
Menu

Planning application

2025/4130/P

100 Hatton Garden London EC1N 8NX

Granted Camden Full Planning Permission

Proposal

Installation 12 no. new air condensers with acoustic enclosure and associated works.

As published by the council, reference 2025/4130/P

Timeline

Dates from the published record

  1. 18 Sep 2025

    Received by Camden

  2. 1 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jun 2026

    Decision issued: Granted

  4. 24 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2026/0968/P Awaiting decision

    Offices And Premises At 2nd Floor The Premier Suite 100 Hatton Garden London EC1N 8NX

    Installation of one new external condenser

    12 Mar 2026 0m away Full applications
  • 2023/2445/P Refused

    100 Hatton Garden London EC1N 8NX

    Retention of 2 x air condenser units within the internal courtyard and installation of new acoustic screens at ground floor level.

    8 May 2024 0m away Full applications
  • 2023/0395/P Granted

    Offices And Premises At 2nd Floor The Premier Suite 100 Hatton Garden London EC1N 8NX

    Installation of 4x air condenser units within the courtyard at second floor level, as a replacement for the existing units.

    23 May 2023 0m away Full applications
  • 2010/0784/P Withdrawn

    Footway adjacent to 100 Hatton Garden London EC1N 8NX

    Details of the highway surface treatment pursuant to Condition 4 of permission dated 07/07/2009 (2009/2199/P) for installation on the footway of a cycle hire docking station including a registration/payment terminal and maximum of 31 docking points for bicycles, in connection with the Transport for London Cycle Hire Scheme.

    30 Mar 2010 10m away Full applications
  • 2016/5538/P Granted

    Flats 1-54 Jeygrove Court 101 Hatton Garden London EC1N 8LB

    Replacement of single glazed aluminium horizontal sliding sash windows with double glazed polyester powder coated aluminium casement windows to residential block of flats.

    12 Dec 2016 10m away Full applications
  • 2013/0748/P Granted

    100A Hatton Garden London EC1N 8NX

    Replacement of exisiting shopfront (Class A1).

    25 Apr 2013 10m away Full applications

In Camden

  • 2026/0743/P Granted

    34-42 Middlesex House Cleveland Street London W1T 4JE

    Details pursuant to Condition 6 (Living Roof) of planning permission 2024/2020/P granted on 12/09/2024 "(Minor refurbishment and rooftop works including: upgraded entrance and reception area; new cycle storage and associated end of trip facilities; new/replaced rooftop plant and plant enclosures; creation of a rooftop amenity area with pavilion structure; hard and soft rooftop landscaping; and all associated and ancillary works)."

    25 Feb 2026 Full applications
  • 2026/3202/P Awaiting decision

    Flat 1 94 Goldhurst Terrace London NW6 3HS

    Erection of a single storey rear extension.

    30 Jul 2026 Full applications
  • 2026/0335/P Granted

    216A West End Lane London NW6 1UX

    Conversion of 1 x 7 bedroom flat (C3) and 1 x 2 bedroom flat (C3) to 1 x 7 bedroom House in Multiple Occupation (Sui-generis) and 1 x 1 bedroom flat (C3) and installation of four rooflights

    28 Jan 2026 Full applications
  • 2026/3229/P Awaiting decision

    52 Neal Street London WC2H 9PA

    Alterations to the shopfront and installation of awnings.

    29 Jul 2026 Full applications
  • 2026/2160/P Granted

    120 College Place London NW1 0DJ

    Erection of a rear roof extension, formation of a rear roof terrace and installation of 2x rooflights to front roof slope, and associated works.

    28 May 2026 Full applications