Planning application
2023/0395/P
Offices And Premises At 2nd Floor The Premier Suite 100 Hatton Garden London EC1N 8NX
Proposal
Installation of 4x air condenser units within the courtyard at second floor level, as a replacement for the existing units.
As published by the council, reference 2023/0395/P
Timeline
Dates from the published record
-
23 May 2023
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2026/0968/P Awaiting decision
Offices And Premises At 2nd Floor The Premier Suite 100 Hatton Garden London EC1N 8NX
Installation of one new external condenser
-
2023/2445/P Refused
100 Hatton Garden London EC1N 8NX
Retention of 2 x air condenser units within the internal courtyard and installation of new acoustic screens at ground floor level.
-
2025/4130/P Granted
100 Hatton Garden London EC1N 8NX
Installation 12 no. new air condensers with acoustic enclosure and associated works.
-
2010/0784/P Withdrawn
Footway adjacent to 100 Hatton Garden London EC1N 8NX
Details of the highway surface treatment pursuant to Condition 4 of permission dated 07/07/2009 (2009/2199/P) for installation on the footway of a cycle hire docking station including a registration/payment terminal and maximum of 31 docking points for bicycles, in connection with the Transport for London Cycle Hire Scheme.
-
2016/5538/P Granted
Flats 1-54 Jeygrove Court 101 Hatton Garden London EC1N 8LB
Replacement of single glazed aluminium horizontal sliding sash windows with double glazed polyester powder coated aluminium casement windows to residential block of flats.
-
2013/0748/P Granted
100A Hatton Garden London EC1N 8NX
Replacement of exisiting shopfront (Class A1).
Other full applications applications
In Camden
-
2026/0743/P Granted
34-42 Middlesex House Cleveland Street London W1T 4JE
Details pursuant to Condition 6 (Living Roof) of planning permission 2024/2020/P granted on 12/09/2024 "(Minor refurbishment and rooftop works including: upgraded entrance and reception area; new cycle storage and associated end of trip facilities; new/replaced rooftop plant and plant enclosures; creation of a rooftop amenity area with pavilion structure; hard and soft rooftop landscaping; and all associated and ancillary works)."
-
2026/3202/P Awaiting decision
Flat 1 94 Goldhurst Terrace London NW6 3HS
Erection of a single storey rear extension.
-
2026/0335/P Granted
216A West End Lane London NW6 1UX
Conversion of 1 x 7 bedroom flat (C3) and 1 x 2 bedroom flat (C3) to 1 x 7 bedroom House in Multiple Occupation (Sui-generis) and 1 x 1 bedroom flat (C3) and installation of four rooflights
-
2026/3229/P Awaiting decision
52 Neal Street London WC2H 9PA
Alterations to the shopfront and installation of awnings.
-
2026/2160/P Granted
120 College Place London NW1 0DJ
Erection of a rear roof extension, formation of a rear roof terrace and installation of 2x rooflights to front roof slope, and associated works.