Planning application
Test
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Test for constraint
As published by the council, reference 2025/2604/P
Application record
- Reference
- 2025/2604/P
- Category
- Full applications
- Status
- Registered
Timeline
Dates from the published record
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
Camden took a median of 42 days over the applications it decided in the last year.
What happens while it is decided
This application is with Camden for determination, against a statutory target of eight weeks. Over the last year Camden decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Abbey Estate Abbey Road London NW6
Erection of handrails at first floor roof level to eight blocks of flats (Class C3).
Granted Full applications New dwelling -
Block B Rowley Way/ Langtry Walk Ainsworth Estate No: 5,6,8,9,10,12,13,15,16,17,19,21,22,24,25, 27,28,29,31,32,34,35,36,38,39,41,42,43,45, 46,48,50,52,53,55,56,57,59,60,62,63,64,66,67, 69,70,71,73,74,76,78,80,81,83,84,85, 87,88,90,91,92,94,95,97,98,99,101,102,104 London NW8
Replacement of existing gas pipework with steel pipework (5 to 104 Rowley Way).
Withdrawn Heritage and listed buildings -
Block B Rowley Way/ Langtry Walk Ainsworth Estate No: 5,6,8,9,10,12,13,15,16,17,19,21,22,24,25, 27,28,29,31,32,34,35,36,38,39,41,42,43,45, 46,48,50,52,53,55,56,57,59,60,62,63,64,66,67, 69,70,71,73,74,76,78,80,81,83,84,85, 87,88,90,91,92,94,95,97,98,99,101,102,104 London NW8
Replacement of existing gas pipework with steel pipework (5 to 104 Rowley Way).
Withdrawn Full applications -
8A Rowley Way London NW8 0SF
Interior refurbishment works including refitting of kitchen & bathroom.
Granted Heritage and listed buildings 10 docs -
Alexandra & Ainsworth Estate Rowley Way LONDON NW8 0SF
Replacement of existing electrical services inc. new metal enclosures, new distribution boards, new cabling inside 36 of the collumns at the rear of Block A. Installatio of bollards on either side of the riser to residential estate (Class C3).
Granted Heritage and listed buildings -
Various Addresses Rowley Way Estate Rowley Way London NW8 0SJ
Details pursuant to condition 3(a) (pipework erected on site), 3(b) (internal pipe run drawings/photographs) and 3(c) (method statement) of listed building consent dated 14/06/12 (Ref 2012/1718/L) for alterations involving the installation and replacement of gas supply pipe-work and routing on rear elevations of residential properties (Class C3).
Granted Heritage and listed buildings
Other full applications
In Camden
-
2025/2002/P Granted
11 Doughty Street London WC1N 2PL
Change of use from office (Class E) to residential to form a single-family dwelling (Class C3); associated internal and external alterations
-
2026/3146/P Granted
Flat A, 1 Evangelist Road London NW5 1UA
Erection of a single storey side infill extension and a bay window to rear elevation at lower ground floor.
-
2026/3898/P Awaiting decision
98 Marchmont Street London WC1N 1AG
Installation of a new kitchen extraction and ventilation system to the rear of the premises, including associated external ductwork, extraction plant and ancillary equipment.
-
2026/2709/P Awaiting decision
166A Camden Street London NW1 9PT
Change of use from Use Class E to C3 Residential, demolition of existing store and office space, and erection of a three-bedroom dwellinghouse.
-
2025/3861/P Granted
273 Eversholt Street London NW1 1BA
Excavation of rear lightwell at basement level, erection of ground floor rear extension, erection of outbuilding to rear, enlargement of openings on front and rear elevations at basement and ground floor levels, and ancillary landscaping and drainage works associated with the creation of a residential unit (Class C3) across basement and part ground floor levels.