Skip to content
PlanIndex Get alerts
Menu

Planning application

2 Park Village East London NW1 7PX

Granted Camden 2023/2043/P Full applications

Works: Trees

Relates to 2022/5103/P

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details required by Condition 4 (Tree Protection) and Condition 5 (Hard and Soft Landscaping) granted under permission 2022/5103/P (dated 28/03/2023) for 'Installation of replacement timber gates to the boundary, replacement of granite setts with gravel to the parking area, removal of five trees and replanting, new hard and soft landscaping works including construction of new patio areas and retaining walls.'

As published by the council, reference 2023/2043/P

Application record

Reference
2023/2043/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
3 Aug 2023
Postcode
NW1 7PX

Site history

Applications at this address on the Camden register

This site has had 11 applications since 2018: 11 approved, 0 refused.

  • 2026/3399/T Granted

    2 Park Village East London NW1 7PX

    REAR GARDEN: 1 x Ash (T1) - Fell to ground level.

    Decided 22 Sep 2026 Trees
  • 2024/1381/T Granted

    2 Park Village East London NW1 7PX

    DD 5 Day Notice SIDE GARDEN: 1 x Sycamore (T1) - Fell in sections to ground level.

    Decided 19 Jun 2024 Trees
  • 2023/3340/T Granted

    2 Park Village East London NW1 7PX

    REAR GARDEN: 1 x Sycamore (T2) -. Lift to provide statutory clearance over footpath (3m) and road (6m). 1 x Ash (T3) - Fell to ground level. 1 x Ash (T4) - Fell to ground level. 1 x Ash (T5) - Lift to provide 3m clearance over footpath. Reduce remaining canopy by 3m height and spread.

    Decided 22 Sep 2023 Trees
  • 2023/3090/T Granted

    2 Park Village East London NW1 7PX

    DD 5 Day Notice FRONT GARDEN: 1 x Ash (T1) - Fell to ground level.

    Decided 25 Aug 2023 Trees
  • 2022/5103/P Granted

    2 Park Village East London NW1 7PX

    Installation of replacement timber gates to the boundary, replacement of granite setts with gravel to the parking area, removal of five trees and replanting, new hard and soft landscaping works including construction of new patio areas and retaining walls.

    Decided 28 Mar 2023 Full applications
  • 2022/5555/L Granted

    2 Park Village East London NW1 7PX

    Installation of replacement timber gates to the boundary, replacement of granite setts with gravel to the parking area and construction of new patio areas and retaining walls

    Decided 28 Mar 2023 Heritage and listed buildings
  • 2021/4239/L Granted

    2 Park Village East London NW1 7PX

    Installation of temporary internal secondary glazing to one window and three mechanical ventilation units, at first and second floor levels, for noise mitigation works during construction of the HS2 railway.

    Decided 26 Oct 2021 Heritage and listed buildings
  • 2021/0365/L Granted

    2 Park Village East London NW1 7PX

    Replace and repair where necessary rotten and damaged timber pillars on first floor balcony of western elevation of building.

    Decided 16 Jul 2021 Heritage and listed buildings
  • 2019/2289/L Granted

    2 Park Village East London NW1 7PX

    Installation of temporary internal secondary glazing to one window on front elevation & one window on site elevation for noise mitigation works during construction of the HS2 railway.

    Decided 26 Jul 2019 Heritage and listed buildings
  • 2018/3312/L Granted

    2 Park Village East London NW1 7PX

    Installation of temporary internal secondary glazing to fourteen windows to the front and side elevations for noise mitigation during construction of the HS2 railway.

    Decided 22 Oct 2018 Heritage and listed buildings

Timeline

Dates from the published record

  1. 3 Aug 2023

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2022/5103/P Granted

    2 Park Village East London NW1 7PX

    Installation of replacement timber gates to the boundary, replacement of granite setts with gravel to the parking area, removal of five trees and replanting, new hard and soft landscaping works including construction of new patio areas and retaining walls.

    Decided 28 Mar 2023 Full applications

What this grant of permission means

Camden granted permission on 3 August 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 2 Park Village East London NW1 7PX

    2021/4239/L 50 yards away

    Installation of temporary internal secondary glazing to one window and three mechanical ventilation units, at first and second floor levels, for noise mitigation works during construction of the HS2 railway.

    Granted Heritage and listed buildings Windows or glazing
  • Railway cutting adjacent to the existing Park Village East retaining wall and extending from Euston Scissor Box (open section) to Parkway Tunnel; Adjacent Approx to 1 - 100 Park Village East and 117 - 125 Parkway London NW1 7PS

    2021/0126/HS2 50 yards away

    Application for approval under Schedule 17 of High Speed Rail (London - West Midlands) Act 2017 of installation of Wall Berm and Upstand Support Strucure to structurally support the existing Park Village East retaining wall. The berm will be located in the railway cutting, adjacent to the existing Park Village East retaining wall and extending from Euston Scissor Box (open section) to Parkway Tunnel; and the installation of Euston Scissor Box (open section) - structurally supporting the portal between the Euston Tunnels and Scissor Cut, located within the railway cutting bound by Mornington Street and Granby terrace Bridge and forming part of the portal for the new HS2 tunnels.

    Granted
  • Park Village East NW1 2DU

    2024/1945/HS2 Submitted 17 May 2024 50 yards away

    Non-material amendment to Schedule 17 - Conditions of Deemed Planning Permission Approval 2023/4585/HS2 dated 19/12/2023 (which itself amended 2021/0126/HS2, dated 17/03/2021) for; installation of Wall Berm and Upstand Support Strucure to structurally support the existing Park Village East retaining wall. The berm will be located in the railway cutting, adjacent to the existing Park Village East retaining wall and extending from Euston Scissor Box (open section) to Parkway Tunnel; and the installation of Euston Scissor Box (open section) - structurally supporting the portal between the Euston Tunnels and Scissor Cut, located within the railway cutting bound by Mornington Street and Granby terrace Bridge and forming part of the portal for the new HS2 tunnels.

    Granted Conditions 8 docs
  • 2 Park Village East London NW1 7PX

    2023/3090/T 50 yards away

    DD 5 Day Notice FRONT GARDEN: 1 x Ash (T1) - Fell to ground level.

    Granted Trees
  • 2 Park Village East London NW1 7PX

    2023/3340/T 50 yards away

    REAR GARDEN: 1 x Sycamore (T2) -. Lift to provide statutory clearance over footpath (3m) and road (6m). 1 x Ash (T3) - Fell to ground level. 1 x Ash (T4) - Fell to ground level. 1 x Ash (T5) - Lift to provide 3m clearance over footpath. Reduce remaining canopy by 3m height and spread.

    Granted Trees
  • Footway on junction of Parkway and Park Village East London NW1 7PX

    2012/4078/P 50 yards away

    Installation of 12m high pole with 3 x antennas and associated equipment cabinets on the footway.

    Refused Full applications

In Camden

  • 2026/0990/P Refused

    1 Bleeding Heart Yard & 19 Greville Street London EC1N 8SJ

    Change of use from office space and restaurant use (Class E) and members club (Sui Generis) to affordable workspace and restaurant use (Class E) and 1 x residential unit on the third and fourth floors (Class C3). Erection of a two-storey roof extension across 19 Greville Street and 1 Bleeding Heart Yard, including alterations at second-floor level to the interior courtyard elevation, ground-floor fenestration changes, and a roof terrace for the associated residential unit.

    Received 26 Mar, published by the council 24 Jul 2026 Full applications
  • 2026/3044/P Granted

    London Irish Centre 50-52 Camden Square London NW1 9XB

    Details to discharge Condition 25 Part A (Air Quality Monitoring) of planning permission ref. 2020/1481/P dated 17/05/24 for 'Redevelopment of site to provide new and reconfigured community centre and ancillary residential accommodation (Class D1/ D2) involving alterations to retained buildings at No's. 50, 51 and 52 Camden Square including replacement of two storey 'link' building; demolition of Murray Street and Murray Mews buildings and replacement with part-three / part-four storey building (plus basement level) with second and third floor terraces and new entrance; associated landscaping and cycle parking'.

    Received 20 Jul, published by the council 2 Aug 2026 Full applications
  • 2026/4338/P Awaiting decision

    32 Willoughby Road London NW3 1RU

    Details to discharge condition 6 (tree protection methods) of planning permission 2025/4186/P granted 13/11/2025 for 'Demolition of existing two storey outrigger and replacement with part two-storey, part single storey rear extension, loft conversion with dormer and roof light to main roof at rear, new windows to flanking wall, replacement of existing windows and installation of a gate and fence to side'.

    Received 5 Oct, published by the council 9 Oct 2026 Full applications
  • 2026/4141/P Awaiting decision

    24 Endell Street London WC2H 9HQ

    Relocation of three air conditioning condenser units to first floor roof, construction of an acoustic enclosure and other associated works.

    Received 5 Oct, published by the council 9 Oct 2026 Full applications
  • 2026/3907/P Awaiting decision

    Flat 1 16 Lyndhurst Road London NW3 5NL

    External renovations to the front of the property, including works to the entry porch, steps, replacment front door, installation of metal railings to boundary wall and paving to front garden and erection of a glass roof to the side passage to create a bike shelter.

    Received 5 Oct, published by the council 9 Oct 2026 Full applications