Planning application
12 Park Village East London NW1 7PX
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of temporary internal secondary glazing to three windows to the front elevation for noise mitigation during construction of the HS2 railway.
As published by the council, reference 2018/3147/L
Application record
- Reference
- 2018/3147/L
- Type
- Listed Building Consent
- Status
- Granted As published: FINAL DECISION
- Decision
- Granted
- Received
- 4 Jul 2018
- Validated
- 24 Jul 2018
- Decided
- 22 Oct 2018
- Ward
- Regents Park (Pre May 2022)
- Decision by
- Delegated
- Postcode
- NW1 7PX
Site history
Applications at this address on the Camden register
This site has had 3 applications since 2018: 3 approved, 0 refused.
-
2025/0992/T Granted
12 Park Village East London NW1 7PX
REAR GARDEN: 1 x Magnolia (T3) - Reduce all aspects of crown by approx. 1.5m - 2m to create a tight and tidy shape.
-
2025/0478/HS2 Granted
12 Park Village East London NW1 7PX
Heritage Agreement Method Statement for installation of equipment for monitoring and conservation management of ground movements due to below ground construction of HS2 railway north of Euston.
Timeline
Dates from the published record
-
4 Jul 2018
Received by Camden
-
24 Jul 2018
Validated
Checked as complete and ready for consideration.
-
22 Oct 2018
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
-
30 Sep 2026
Status changed to FINAL DECISION
Previously Final Decision.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Camden granted permission on 22 October 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
12 Park Village East London NW1 7PX
Heritage Agreement Method Statement for installation of equipment for monitoring and conservation management of ground movements due to below ground construction of HS2 railway north of Euston.
Granted -
12 Park Village East London NW1 7PX
REAR GARDEN: 1 x Magnolia (T3) - Reduce all aspects of crown by approx. 1.5m - 2m to create a tight and tidy shape.
Granted Trees -
-
10 Park Village East London NW1 7PX
Installation of one temporary mechanical ventilation unit to the front of the building at first floor level for noise mitigation works during construction of the HS2 railway.
Granted Heritage and listed buildings -
10 Park Village East London NW1 7PX
Schedule 18 Heritage Agreement Method Statement for Monitoring and Conservation Management of Ground Movements due to Below-Ground Construction at 10 Park Village East.
Granted -
10 Park Village East London Camden NW1 7PX
88% historically approved · decision due ~7 Sep
Demolition and reconstruction of existing lower ground floor side/rear extension and the addition of three rooflights
Awaiting decision Householder Extension Loft or dormer +1 16 docsDomestic
Other heritage and listed building applications
In Camden
-
2026/1141/L Granted
25 John Street London WC1N 2BS
Internal and external alterations to partition layout at basement, supporting structures and external ground level, and alterations to design of conservatory, windows and doors granted under listed building consent 2024/0338/L dated 06/08/2024.
-
2025/1781/L Granted
Frognal Rise House Lower Terrace London NW3 6RE
Demolition of existing garage and interlinking gallery and replacement with new garage and garden room with link, new basement floor below garden, alterations to main house including replacement windows including reinstated oriel window and new French doors to entrance elevation, new roofing to side wing, new portico and replacement door to front elevation, enlargement of existing lightwell, replacement gates and canopy over entrance gate, restorations of boundary treatments, associated internal alterations including partial underpinning works and other minor alterations.
-
2026/4129/L Awaiting decision
6 Leverton Street London NW5 2PJ
Strip out kitchen including floor tiles and replace; replace plumbing and flooring in rear ensuite; replace plumbing in front ensuite and WC; replace internal doors; replace garden wall with metal railing; replace 3 rear windows, 3 rear elevation side windows, 1 rear door and 1 rear elevation side door with double-glazed crittal windows and doors; remove 2 rear windows; render rear elevation brickwork; and associated works.
-
2026/1686/L Granted
Flat Ground and 1st Floor and Flat 2nd and 3rd Floor 14 Downshire Hill London NW3 1NR
External and internal alterations in connection with conversion of two self-contained flats into a single-family dwellinghouse, including new doors at rear ground and second floor level, replacement windows at rear second and third floors level, removal of internal partitions, extending the stair handrail, and replacement internal doors, parquet flooring, skirting, architraves, cornicing, and fittings.
-
2026/2202/L Refused
4 Hampstead Square London NW3 1AB
Erection of conservatory to front elevation.