Planning application
10 Park Village East London NW1 7PX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Schedule 18 Heritage Agreement Method Statement for Monitoring and Conservation Management of Ground Movements due to Below-Ground Construction at 10 Park Village East.
As published by the council, reference 2024/1905/HS2
Application record
- Reference
- 2024/1905/HS2
- Status
- Final Decision
- Decision
- Granted As published: Approval
- Decided
- 24 Jun 2024
- Postcode
- NW1 7PX
Site history
Applications at this address on the Camden register
This site has had 6 applications since 2018: 5 approved, 0 refused.
-
2023/2118/T Granted
10 Park Village East London NW1 7PX
REAR GARDEN: 1 x Ash (T3) - Fell to ground level.
-
2023/1844/T Withdrawn
10 Park Village East London NW1 7PX
REAR GARDEN: 1 x Ash (T3) - Fell to ground level.
-
2021/5022/L Granted
10 Park Village East London NW1 7PX
Installation of one temporary mechanical ventilation unit to the front of the building at first floor level for noise mitigation works during construction of the HS2 railway.
-
2021/1156/L Granted
10 Park Village East London NW1 7PX
Installation of temporary internal secondary glazing to one window and two mechanical ventilation units for noise mitigation works during construction of the HS2 railway.
-
2018/4479/L Granted
10 Park Village East London NW1 7PX
Installation of temporary internal secondary glazing to three windows in the front elevation for noise mitigation during construction of the HS2 railway.
Timeline
Dates from the published record
-
24 Jun 2024
Decision issued: Approval
-
22 Jul 2026
Added to PlanIndex
What this grant of permission means
Camden granted permission on 24 June 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Camden's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
-
10 Park Village East London NW1 7PX
Installation of one temporary mechanical ventilation unit to the front of the building at first floor level for noise mitigation works during construction of the HS2 railway.
Granted Heritage and listed buildings -
10 Park Village East London Camden NW1 7PX
88% historically approved · decision due ~7 Sep
Demolition and reconstruction of existing lower ground floor side/rear extension and the addition of three rooflights
Awaiting decision Householder Extension Loft or dormer +1 16 docsDomestic -
10 Park Village East London NW1 7PX
Installation of temporary internal secondary glazing to one window and two mechanical ventilation units for noise mitigation works during construction of the HS2 railway.
Granted Heritage and listed buildings Windows or glazing -
10 Park Village East London Camden NW1 7PX
96% historically approved · decision due ~7 Sep
Demolition and reconstruction of existing lower ground floor side/rear extension and the addition of three rooflights
Awaiting decision Heritage and listed buildings Extension Loft or dormer +1 1 doc -
10 Park Village West London NW1 4AE
FRONT GARDEN: 1 x Robinia (T2) - Reduce and reshape by approx. 3m.
Granted Trees