Skip to content
PlanIndex Get alerts
Menu

Planning application

The Oak Building Kingfisher Way Cambridge Cambridgeshire CB2 8DA

Awaiting decision Cambridge 26/03640/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of timber cladding.

As published by the council, reference 26/03640/FUL

Application record

Reference
26/03640/FUL
Type
Full Application
Status
Awaiting decision
Received
24 Sep 2026
Validated
24 Sep 2026
Ward
Petersfield
Postcode
CB2 8DA

Comment by 28 October 2026

The council is taking comments on this application until then. Have your say on Cambridge's portal.

Timeline

Dates from the published record

  1. 24 Sep 2026

    Received by Cambridge

  2. 1 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 19 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cambridge took a median of 53 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Ingleton Wood LLP Agent, registered in London

Active · incorporated 2004 · London

324 applications on PlanIndex · across 42 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge decided full applications in a median of 74 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 9 Aberdeen Square Cambridge CB2 8BZ

    21/0435/TTCA Submitted 29 Mar 2021 150 yards away

    Silver birch - remove

    Granted Trees 8 docs
  • The Copper Building Kingfisher Way Cambridge Cambridgeshire CB2 8BL

    26/00153/CONDA Submitted 23 Jun 2026 150 yards away

    Submission of details required by condition 3 (external materials) of planning permission 26/00153/FUL

    Granted Conditions 9 docs
  • 28 Newton Road Cambridge Cambridgeshire CB2 8AL

    26/0348/TTPO Submitted 2 Apr 2026 200 yards away

    T1 - Holm Oak - Reduce to clear the building by approx 2-3m. T2 - Holm Oak - Reduce to clear the building by approx 2-3m. T3 - Holm Oak - Reduce to clear the building by approx 2-3m. Reason - This has been done before to maintain tree clearance from the building.

    Granted Trees 7 docs
  • 25 Newton Road Cambridge CB2 8AL

    20/01777/CL2PD Submitted 19 Mar 2020 250 yards away

    Certificate of Lawfulness under Section 192 for a single storey side extension with new lantern roof light, a single storey infill rear extension and 5no new skylights on the rear elevation.

    Granted Lawful development Extension Loft or dormer 20 docs
    Small domestic
  • Applecourt Newton Road Cambridge Cambridgeshire CB2 8AN

    26/03161/LBC Submitted 20 Aug 2026 250 yards away

    97% historically approved · decision due ~20 Oct

    Replacement of the electrical building network and consolidation of the existing conduits within communal hall.

    Awaiting decision Heritage and listed buildings 16 docs
  • Cambridge University Press Shaftesbury Road Cambridge CB2 8BS

    20/03147/CLUED Submitted 20 Jul 2020 250 yards away

    Certificate of Lawfulness under S191 for the existing installation of solar panels to two roof areas (Printing House and Cass Centre), as agreed with Cambridge City Council and undertaken as Permitted Development.

    Granted Lawful development 17 docs

In Cambridge

  • 26/02377/FUL Granted

    5 Davy Road Cambridge Cambridgeshire CB1 3QW

    Two storey front extension, a single storey rear extension (following the removal of the existing side and single storey rear extensions). Conversion of existing roof space following the reconstruction with a raised ridge height, to create 1no 3bed dwelling adjacent to the existing house.

    Received 23 Jun, published by the council 23 Jul 2026 Full applications
  • 26/03042/FUL Granted

    Botanical Gardens, Plant Growth Facility Department Of Plant Science Bateman Street Cambridge Cambridgeshire CB2 1LR

    Installation of a new stand-by Generator and acoustic enclosure at the Sainsbury Laboratory to serve Building B in mains fail conditions.

    Received 11 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03008/FUL Granted

    24 Luard Road Cambridge Cambridgeshire CB2 8PJ

    Demolition of existing dwelling and construction of new 2.5 storey dwelling and associated landscaping

    Received 10 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03002/FUL Granted

    The Pickerel Inn 30 Magdalene Street Cambridge Cambridgeshire CB3 0AF

    Remove existing jumbrellas 2 no. and replace with a new Mirador Pergola to the rear courtyard

    Received 7 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03729/FUL Awaiting decision

    27-28 Bridge Street Cambridge Cambridgeshire CB2 1UJ

    Installation of new shopfront and seating at the rear external court yard with proposed conservatory glass roof.

    Received 2 Oct, published by the council 9 Oct 2026 Full applications