Planning application
NIAB Darwin Green 1 Development Huntingdon Road Cambridge Cambridgeshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of 240 co-living residential units (Use Class Sui Generis) and associated facilities along with access, car and cycle parking, landscaping and infrastructure works forming part of a wider masterplan for the site.
As published by the council, reference 26/02607/FUL
Application record
- Reference
- 26/02607/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 9 Jul 2026
- Validated
- 20 Jul 2026
- Ward
- Castle
Site history
Applications at this address on the Cambridge register
This site has had 2 applications since 2026.
-
26/02606/FUL Awaiting decision
NIAB Darwin Green 1 Development Huntingdon Road Cambridge Cambridgeshire
Demolition of all buildings and structures, and erection of Build to Rent residential units (Use Class C3) including affordable housing, commercial floor space (Use Class E), and associated facilities along with access, car and cycle parking, landscaping, and infrastructure works forming part of a wider masterplan for the site.
Timeline
Dates from the published record
-
9 Jul 2026
Received by Cambridge
-
20 Jul 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cambridge took a median of 52 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 26/02606/FUL (Awaiting decision)
Who's behind it
Company information only, from the register and Companies House
Carter Jonas LLP Agent
883 applications on PlanIndex · across 132 councils · 88% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
115 documents on file for this application
- CONSULTEE COMMENT SUBMITTED ONLINE
- ANGLIAN WATER
- COUNTY COUNCIL
- TREES
- LANDSCAPE
- SUSTAINABILITY
- CAMCYCLE
- THE COMMITTEE OF WINDSOR ROAD RESIDENTS ASSOCIATION
- THE COMMITTEE OF WINDSOR ROAD RESIDENTS? ASSOCIATION
- CAMBRIDGESHIRE CONSTABULARY
- LOCAL HIGHWAY AUTHORITY
- LOCAL HIGHWAY AUTHORITY
- ECOLOGY
- ENVIRONMENTAL QUALITY AND GROWTH
- LLFA
- RESIDENTS OF HOWES PLACE
- RESIDENTS OF HOWES PLACE
- PUBLIC ART
- WASTE - SHARED SERVICE
- ENVIRONMENT AGENCY
- DRAWING ISSUE SHEET
- LANDSCAPE MASTER PLAN
- LANDSCAPE HARDWORKS PLANS 1 OF 2
- LANDSCAPE HARDWORKS PLANS 2 OF 2
- LANDSCAPE SOFTWORKS PLANS 1 OF 2
- LANDSCAPE SOFTWORKS PLANS 2 OF 2
- LANDSCAPE SUDS PLANS 1 OF 2
- LANDSCAPE SUDS PLANS 2 OF 2
- LANDSCAPE LEVELS PLANS 1 OF 2
- LANDSCAPE LEVELS PLANS 1 OF 2
- FURNITURE AND LIGHTING PLANS 1 OF 2
- FURNITURE AND LIGHTING PLANS 2 OF 2
- LANDSCAPE LEGEND SHEET
- LANDSCAPE AMENITY PLAN
- HARDWORKS DETAILS
- LANDSCAPE TREE PLANTING PLAN 2 OF 2
- SOFTWORKS DETAILS - SHEET 1 OF 2
- SOFTWORKS DETAILS - SHEET 2 OF 2
- UGF CALCULATION PLAN
- LANDSCAPE ROOF PLAN
- LANDSCAPE TREE PLANTING PLAN 1 OF 2
- NIAB FINAL HOUSING REPORT - JULY 2026
- PLANNING STATEMENT JUNE 2026
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- STATUTORY METRIC
- APPLICATION FORM - NO PERSONAL INFO
- FEE CALCULATION
- ATTACHMENT SUMMARY FROM PORTAL
- BUILDING D SITE LOCATION PLAN
- DESIGN AND ACCESS STATEMENT PART 1
- BUILDING D EXISTING SITE PLAN
- BUILDING D PROPOSED SITE PLAN
- DESIGN AND ACCESS STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 5
- DESIGN AND ACCESS STATEMENT PART 6
- DESIGN AND ACCESS STATEMENT PART7
- PROPOSED ANCILLARY STRUCTURES REFUSE STORE AND SUBSTATION
- DESIGN AND ACCESS STATEMENT PART 9
- DESIGN AND ACCESS STATEMENT PART4
- DESIGN AND ACCESS STATEMENT PART 3
- DESIGN AND ACCESS STATEMENT PART 8
- FRAMEWORK TRAVEL PLAN
- HERITAGE STATEMENT
- FLOOD RISK ASSESSMENT AND SUSTAINABLE DRAINAGE STRATEGY
- FLOOD RISK ASSESSMENT AND SUSTAINABLE DRAINAGE STRATEGY 2 OF 6
- FLOOD RISK ASSESSMENT AND SUSTAINABLE DRAINAGE STRATEGY 3 OF 6
- FLOOD RISK ASSESSMENT AND SUSTAINABLE DRAINAGE STRATEGY 4 OF 6
- FLOOD RISK ASSESSMENT AND SUSTAIBLE DRAINAGE STRATEGY 5 OF 6
- FLOOD RISK ASSESSMENT AND SUSTAINABILITY DRAINAGE STRATETY 6 OF 6
- AIR QUALITY ASSESSMENT
- UTILITIES STATEMENT
- STATUATORY BIODIVERSITY METRIC CALCULATIONS
- PRELIMINARY ECOLOGICAL APPRAISAL
- UTILITIES STATEMENT PART 2
- ARBORICULTURAL IMPACT ASSESSMENT
- TRANSPORT ASSESSMENT
- MANAGEMENT PLAN
- FEEDBACK REPORT 2
- TOWNSCAPE AND VISUAL IMPACT APPRAISAL PART 1
- TOWNSCAPE AND VISUAL IMPACT APPRAISAL PART 2
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- NOISE ASSESSMENT
- SUSTAINABILITY STATEMENT PART 1 OF 13
- SUSTAINABILITY STATEMENT PART 10 OF 13
- SUSTAINABILITY STATEMENT PART 11 OF 13
- SUSTAINABILITY STATEMENT PART 12 OF 13
- SUSTAINABILITY STATEMENT PART 13 OF 13
- SUSTAINABILITY STATEMENT PART 2 OF 13
- SUSTAINABILITY STATEMENT PART 3 OF 13
- SUSTAINABILITY STATEMENT PART 4 OF 13
- SUSTAINABILITY STATEMENT PART 5 OF 13
- SUSTAINABILITY STATEMENT PART 6 OF 13
- SUSTAINABILITY STATEMENT PART 7 OF 13
- SUSTAINABILITY STATEMENT PART 8 OF 13
- SUSTAINABILITY STATEMENT PART 9 OF 13
- BUILDINGS D LEVEL 01 FLOOR PLAN
- BUILDINGS D LEVEL 00 FLOOR PLAN
- BUILDINGS D LEVEL 01 FLOOR PLAN
- BUILDINGS D LEVEL 02 03 FLOOR PLAN
- BUILDINGS D LEVEL 04 FLOOR PLAN
- BUILDINGS D LEVEL 05 FLOOR PLAN
- BUILDINGS D ROOF PLAN
- BUILDING D LEVEL 01 FLOOR PLAN
- BUILDING D LEVEL 00 FLOOR PLAN
- BUILDING D LEVEL 01 03 FLOOR PLAN
- BUILDING D LEVEL 04 FLOOR PLAN
- BUILDING D LEVEL 05 FLOOR PLAN
- BUILDING D ROOF PLAN
- BUILDING D PROPOSED SECTIONS
- BUILDING D PROPOSED ELEVATIONS
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge decided full applications in a median of 70 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
NIAB Darwin Green 1 Development Huntingdon Road Cambridge Cambridgeshire
91% historically approved · decision due ~15 Sep
Demolition of all buildings and structures, and erection of Build to Rent residential units (Use Class C3) including affordable housing, commercial floor space (Use Class E), and associated facilities along with access, car and cycle parking, landscaping, and infrastructure works forming part of a wider masterplan for the site.
Awaiting decision Full applications Demolition 134 docs -
National Institute Of Agricultural Botany Huntingdon Road Cambridge Cambridgeshire CB3 0LE
Condition 3 - Traffic Management plan
Granted Conditions 8 docs -
Darwin Green One Cambridge CB3 0LE
Submission of details required by condition 5(Plant Noise Impact Assessment) of planning permission 25/02738/S73
Granted Conditions 9 docs -
Darwin Green One Cambridge CB3 0LE
Submission of details required by condition 6 (Sound insulation) of planning permission 25/02738/S73.
Granted Conditions 8 docs -
6A And 6B Howes Place Cambridge Cambridgeshire CB3 0LD
Non material amendment on application 25/01013/FUL for new ground floor window in rear wall (dining room/study) of original main building, in the location of a previously bricked-up opening/doorway.
Granted Amendments Windows or glazing 10 docs -
Land Between Huntingdon Road And Histon Road Cambridge Cambridgeshire CB3 0LE
98% historically approved · decision due ~28 Oct
Submission of details required by condition 13 (Extraction and Filtration) of outline planning permission 07/0003/OUT
Awaiting decision Conditions 10 docs
Other full applications
In Cambridge
-
26/02687/FUL Granted
Brookfields Health Centre Seymour Street Cambridge Cambridgeshire CB1 3DQ
Retrospective retention of existing modular building for a period of 5 years
-
26/02187/FUL Granted
43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR
Retrospective change of use of land to residential curtilage and installation of gravel area.
-
26/02187/HFUL Granted
43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR
Retrospective change of use of land to residential curtilage and installation of gravel area.
-
26/02716/FUL Granted
8 Lion Estates, Unit 1 Coldhams Road Cambridge Cambridgeshire CB1 3EW
Change of use from Class B8 warehouse with ancillary offices to a mixed use as Class E(g)(i) offices and Class F1(f) place of worship, or Class E(g)(i) and B8 in the alternative
-
26/02485/FUL Granted
Institute Of Astronomy, Observatory Building And Library Madingley Road Cambridge Cambridgeshire CB3 0HA
Alterations to provide improved disabled access, alongside general maintenance works. The scheme comprises the following: new external ramp to the eastern side of the central portico, new external ramp to service the exterior door in the western facade of the building, with interior mat well removed, regrading of external site levels to service the exterior door in the eastern facade of the building, with interior mat well removed, mechanisation of exterior doors and rearrangement of toilet block within eastern wing to provide disabled wc facility.