26/00635/FUL

1 Journey Campus Castle Park Cambridge Cambridgeshire CB3 0AT

Granted Cambridge Full Application

Proposal

Installation of a substation

As published by the council, reference 26/00635/FUL

Timeline

Dates from the published record

  1. 18 Feb 2026

    Received by Cambridge

  2. 24 Jun 2026

    Decision issued: Granted Permission

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/01618/FUL Granted

    4 Journey Campus Castle Park Cambridge Cambridgeshire CB3 0AN

    New cycle store and enclosure of existing cycle store to provide for new centralised waste storage

    28 Apr 2026 27m away Full applications
  • 26/0705/TTPO Awaiting decision

    2 Journey Campus Castle Park Cambridge Cambridgeshire CB3 0AT

    T1 (London plane) - Prune back 3 branches creating pollard heads, to facilitate installation of scaffolding between the tree and the building. Tertiary branches to also be pruned back to the scaffold line where required, but only up to the height of the adjacent building Prune tertiary branch tips that are overhanging the building to have up to 1.5m clearance with top of building structure.

    10 Jul 2026 30m away Trees
  • 23/04037/CONDG Awaiting decision

    Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT

    Submission of details required by condition 18 (design stage BREEAM assessment) of planning permission 23/04037/FUL

    3 Jul 2026 77m away Conditions
  • 26/00567/CONDA Awaiting decision

    Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT

    Submission of details required by condition 15 (Biodiverse Roof) of planning permission 26/00567/S73 Green blue biosolar roofs (1JC-RHP-01-XX-T-A-001737_CO1_Q37). Naturescape N10 Woodland Meadow Mixture. Typical Roof Build-ups (1JC-RHP-01-ZZ-D-A-002602-CO1), and EGR Shade Tolerant Solar Nature Mix.

    30 Jul 2026 77m away Conditions
  • 23/04037/CONDF Decided

    Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT

    Submission of details required by condition 4 (sample panel) of planning permission 23/04037/FUL

    25 Feb 2026 77m away Conditions
  • 26/00567/CONDB Awaiting decision

    Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT

    Submission of details required by condition 18 (Design Stage BREEAM Assessment) of planning permission 26/00567/S73

    30 Jul 2026 77m away Conditions

In Cambridge

  • 26/02897/FUL Awaiting decision

    Friends Meeting House 12 Jesus Lane Cambridge Cambridgeshire CB5 8BA

    Retrofit and refurbishment of Jesus Lane Quaker Meeting House, including alterations to fenestration and openings, alternations to external material, extending parapet, new roof top mechanical equiptment for heating, mvhr and solar pv, new lift core, new single storey rear courtyard extension and amendments to public realm, part change of use from residential class C3 to place of Worship class F1

    30 Jul 2026 Full applications
  • 26/02885/FUL Awaiting decision

    7A Cambridge Leisure Park Clifton Way Cambridge Cambridgeshire CB1 7DY

    New Shopfront and addition of external Seating Area and the installation of 1 No. internally illuminated fascia sign and 1 No. internally illuminated projecting sign.

    30 Jul 2026 Full applications
  • 26/01569/FUL Granted

    1 New Square Cambridge Cambridgeshire CB1 1EY

    Re-building of rear external wall and internal alterations together with Decarbonisation strategy including installation of air source heat pump, window glazing upgrade and associated energy efficiency building works.

    24 Apr 2026 Full applications
  • 25/04039/FUL Granted

    Kett House Station Road Cambridge Cambridgeshire

    Demolition of the existing building and structures, erection of an office building (Class E) to include ground floor flexible units (Class E, F1, F2) and a single basement for car parking and plant, hard and soft landscaping to create a new public realm, stopping up of the existing vehicular access on Hills Road and the provision of vehicular access on Station Road, provision of cycle access/parking, and related infrastructure and servicing.

    17 Oct 2025 Full applications
  • 26/00696/FUL Withdrawn

    27-28 Bridge Street Cambridge Cambridgeshire CB2 1UJ

    Installation of new shopfront and seating at the rear external court yard with conservatory glass roof.

    23 Feb 2026 Full applications