Planning application
Land At Ekin Road Cambridge Cambridgeshire
Works: New dwelling Demolition Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing dwellings and redevelopment to provide 134 No. new dwellings, parking, open space, landscaping and associated works.
As published by the council, reference 26/00039/FUL
Application record
- Reference
- 26/00039/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 7 Jan 2026
- Validated
- 7 Jan 2026
- Ward
- Abbey
Comment by 21 September 2026
The council is taking comments on this application until then. Have your say on Cambridge's portal.
Timeline
Dates from the published record
-
7 Jan 2026
Received by Cambridge
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cambridge took a median of 52 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Carter Jonas LLP Agent
883 applications on PlanIndex · across 132 councils · 88% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
292 documents on file for this application
- WASTE TEAM COMMENTS
- WASTE TEAM- S106 CONTRIBUTIONS
- NHS COMMENTS
- LOCAL HIGHWAY AUTHORITY
- NATURAL ENGLAND
- NATURAL ENGLAND
- FILE COPY OF AMENDMENT LETTER
- AIR QUALITY
- LOCAL HIGHWAY AUTHORITY
- TREES
- ECOLOGY
- LANDSCAPE
- LANDSCAPE
- PLANNING AGENT ADDITIONAL REBUTTAL NOTE
- SWIFT SURVEY- MKA ECOLOGY
- BAT EMERGENCE SURVEYS- MKA ECOLOGY
- ENVIRONMENTAL QUALITY AND GROWTH
- LLFA
- SUSTAINABILITY
- AIRPORT SAFEGUARDING
- WASTE - SHARED SERVICE
- ARCHAEOLOGICAL OFFICER
- CCTV - DRAINAGE SURVEY
- WATER EFFICIENCY NOTE
- BBC- MEETING NOTE
- MKA ECOLOGY- SSSI RECREATIONAL IMPACT ASSESSMENT
- HIGHWAYS ADOPTION PLAN
- HIGHWAYS STOPPING UP PLAN
- HIGHWAYS DIMENSION PLAN
- OPTIONS APPRAISAL- EKIN ROAD REDEVELOPMENT
- SUSTAINABILITY STATEMENT
- OVERHEATING ASSESSMENT
- CONSTRUCTION MANAGEMENT PLAN
- REVISED TRAFFIC MANAGEMENT PLAN
- EKIN ROAD RESIDENTS CONSTRUCTION INFORMATION LETTER
- PROPOSED SITE LAYOUT- TENURE PLAN
- PLANNING AGENT- REVISED SUBMISSION COVER LETTER
- SAVILLS RESPONSE TO QUINTIC ON BEHALF OF THE APPLICANTS (JULY 2026)
- QUINTIC FINAL RESPONSE TO SAVILLS ON BEHALF OF THE LPA (JULY 2026)
- SAVILLS- FINAL RESPONSE TO QUINTIC ON BEHALF OF THE APPLICANTS
- FILE COPY OF AMENDMENT LETTER
- SAVILLS- VIABILITY REPORT ON BEHALF OF THE APPLICANTS
- QUINTIC ADVISORY- VIABILITY REVIEW ON BEHALF OF THE LPA
- URBAN DESIGN
- ANGLIAN WATER
- PUBLIC ART CONSULTEE
- PUBLIC ART COMMENTS
- LOCAL HIGHWAY AUTHORITY
- PUBLIC ART
- SUSTAINABILITY
- ECOLOGY
- ENVIRONMENTAL QUALITY AND GROWTH
- LANDSCAPE
- AIR QUALITY
- LOCAL LEAD FLOOD AUTHORITY
- WASTE - SHARED SERVICE
- PLACE SERVICES - TREES
- LANDSCAPE
- CAMBRIDGE CITY AIRPORT
- 33 EKIN ROAD
- COUNTY ARCHAEOLOGY
- COUNTY ARCHAEOLOGY (ATTACHMENT)
- LOCAL HIGHWAY AUTHORITY
- FLAT BLOCK 1 - ELEVATIONS A B AND C
- FLAT BLOCK 1 - ELEVATIONS D E AND F
- FLAT BLOCK 2 - ELEVATIONS A B AND C
- FLAT BLOCK 2 - ELEVATIONS D E AND F
- FLAT BLOCK 3 - ELEVATIONS A B AND C
- FLAT BLOCK 3 - ELEVATIONS D E AND F
- HT01 - ELEVATIONS
- HT02 - ELEVATIONS
- HT03A - ELEVATIONS
- HT03B - ELEVATIONS
- HT04A - ELEVATIONS
- HT04B - ELEVATIONS
- HT05A ELEVATIONS
- HT05B ELEVATIONS
- HT06 - ELEVATIONS
- HT07 - ELEVATIONS
- MAISONETTE BLOCK 01 - ELEVATIONS A B C AND D
- MAISONETTE BLOCK 02 - ELEVATIONS
- SITE LAYOUT - GROUND FLOOR LEVEL
- SITE LAYOUT - CYCLE STRATEGY
- SITE LAYOUT - REFUSE STRATEGY
- STREET ELEVATIONS A1 A2 AND B1
- STREET ELEVATIONS K J I H
- STREET ELEVATIONS G F E D A3 C 2B
- UPDATED DRAWING LIST & SUMMARY OF CHANGES
- LANDSCAPE MASTERPLAN
- BOUNDARY TREATMENTS PLAN
- PLANTING PLAN 1 OF 4
- PLANTING PLAN 2 OF 4
- PLANTING PLAN 3 OF 4
- PLANTING PLAN 4 OF 4
- HARDWORKS PLAN 1 OF 4
- HARDWORKS PLAN 2 OF 4
- HARDWORKS PLAN 3 OF 4
- HARDWORKS PLAN 4 OF 4
- FILE COPY OF AMENDMENT LETTER
- TRAFFIC MANAGEMENT PLAN AND CONSTRUCTION MANAGEMENT PLAN
- TRANSPORT ASSESSMENT TEAM
- SECTION 106 OFFICER
- SECTION 106 OFFICER
- ECOLOGY
- DESIGNING OUT CRIME OFFICER
- CADENT GAS
- CADENT GAS COMMENTS
- NATURAL ENGLAND
- URBAN DESIGN
- ANGLIAN WATER REPORT
- COUNTY S106 COMMENTS
- LANDSCAPE
- FIRE & RESCUE SERVICES
- ENVIRONMENTAL QUALITY AND GROWTH
- 33 EKIN ROAD
- LAMBERT SMITH HAMPTON
- TREES
- AIR QUALITY
- LOCAL HIGHWAY AUTHORITY
- SITE NOTICES
- SUSTAINABILITY
- UNEX GROUP
- DAYLIGHT AND SUNLIGHT REPORT
- DESIGN AND ACCESS STATEMENT PART 1
- DESIGN AND ACCESS STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 3
- DESIGN AND ACCESS STATEMENT PART 4
- PHASE 1 DESK STUDY PART 1
- PHASE 1 DESK STUDY PART 2
- PHASE 1 DESK STUDY PART 3
- PHASE 1 DESK STUDY PART 4
- PHASE 1 DESK STUDY PART 5
- EKIN ROAD VIEW 1
- EKIN ROAD VIEW 2
- EKIN ROAD VIEW 3
- EKIN ROAD VIEW 4
- EKIN ROAD VIEW 5
- BIODIVERSITY NET GAIN CALCULATIONS
- EAST OF ENGLAND AMBULANCE SERVICE
- LOCAL LEAD FLOOD AUTHORITY COMMENTS
- 31B EKIN ROAD
- DESIGN AND ACCESS STATEMENT- PART 2
- DESIGN AND ACCESS STATEMENT- PART 3
- DESIGN AND ACCESS STATEMENT- PART 4
- BRE- DAYLIGHT SUNLIGHT REPORT
- ARCHAEOLOGY COMMENTS
- CAMBRIDGE CITY AIRPORT
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- SITE NOTICE
- VIEW 1
- VIEW 2
- VIEW 3
- VIEW 4
- VIEW 5
- PHASE 1- DESK STUDY
- PHASE 1 DESK STUDY (PAGE 1-50)
- PHASE 1 DESK STUDY (PAGE 51-100)
- PHASE 1 DESK STUDY (PAGE 101-150)
- PHASE 1 DESK STUDY (PAGE 151-196)
- APPLICATION FORM - NO PERSONAL INFO
- FEE CALCULATION
- ATTACHMENT SUMMARY FROM PORTAL
- ENERGY STRATEGY
- SUSTAINABILITY STATEMENT
- OVERHEATING ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- TRANSPORT ASSESSMENT
- TRAVEL PLAN
- ARBORICULTURAL IMPACT ASSESSMENT AND TREE SURVEY
- COVERING LETTER
- FOUL DRAINAGE AND UTILITIES STATEMENT
- SUMMARY OF COMMUNITY FEEDBACK
- FLAT BLOCK 1 GROUND FLOOR PLAN
- FLAT BLOCK 1 ROOF PLAN
- FLAT BLOCK 1 TYPICAL FLOOR PLAN
- FLAT BLOCK 1 ELEVATIONS A, B AND C
- FLAT BLOCK 1 ELEVATIONS D E AND F
- FLAT BLOCK 1 SECTIONS
- FLAT BLOCK 2 GROUND FLOOR PLAN
- FLAT BLOCK 2 TYPICAL FLOOR PLAN
- FLAT BLOCK 2 ELEVATIONS A B AND C
- FLAT BLOCK 2 ROOF PLAN
- FLAT BLOCK 2 SECTIONS
- FLAT BLOCK 3 GROUND FLOOR PLAN
- FLAT BLOCK 3 ROOF PLAN
- FLAT BLOCK 3 TYPICAL FLOOR PLAN
- FLAT BLOCK 3 ELEVATIONS A B AND C
- FLAT BLOCK 3 ELEVATIONSD E AND F
- FLAT BLOCK 3 SECTIONS
- PROPOSED SUBSTAION PLAN, SECTION AND ELEVATION
- GROUND FIRST FLOOR AND ROOF PLANS AND SECTIONS AA AND BB
- FLAT BLOCK 3 ROOF PLAN
- FLAT BLOCK 3 TYPICAL FLOOR PLAN
- FLAT BLOCK 3 ELEVATIONS A B AND C
- FLAT BLOCK 3 ELEVATIONSD E AND F
- FLAT BLOCK 3 SECTIONS
- PROPOSED SUBSTAION PLAN, SECTION AND ELEVATION
- GROUND FIRST FLOOR AND ROOF PLANS AND SECTIONS AA AND BB
- HT01 ELEVATIONS
- PLOT 38 GROUND AN FIRST FLOOR PLANS AND SECTIONS AA AND BB
- HT02 ELEVATIONS
- PLOT 58 AND 63 GROUND AND FIRST FLOOR PLAN AND SECTIONS AA AND BB
- PLOT 50 GROUND, FIRST AND SECOND FLOOR PLANS AND SECTION EE, FF
- HT03A ELEVATIONS
- HT03B ELEVATIONS
- HT04A 3B6P PLANS AND SECTIONS
- HT04B 3B6P PLANS AND SECTIONS
- HT04A ELEVATIONS
- HT04B ELEVATIONS
- HT05A 3B6P PLANS AND SECTIONS
- HT05B 4B6P PLANS AND SECTIONS
- HTO5A ELEVATIONS
- HT05B ELEVATIONS
- FLAT BLOCK 2 ELEVATIONS D E AND F
- HT06 ELEVATIONS
- HT07A 2B4P PLANS AND SECTIONS
- HT07B 2BAP PLANS AND SECTIONS
- HT07 ELEVATIONS
- HT06 5B8P PLANS AND SECTIONS
- MAISONETTE BLOCK 01 GROUND AND FIRST FLOOR PLANS
- MAISONETTER BLOCK 01 SECOND AND THIRD FLOOR PLANS
- MAISONETTER BLOCK 01 ELEVATIONS A B C AND D
- MAISONETTE BLOCK 01 SECTION
- MAISONETTE BLOCK 02 GROUND AND FIRST FLOOR PLANS
- MAISONETTER BLOCK 02 FIRST AND SECOND FLOOR PLANS
- MAISONETTE BLOCK 02 MAISONETTE ROOF PLAN
- MAISONETTER BLOCK 02 ELEVATIONS
- MAISONETTER BLOCK 02 SECTIONS
- SITE LAYOUT GROND FLOOR LEVEL
- SITE ELEVATIONS KEY PLAN
- SITE LAYOUT TENURE STRATEGY
- SITE LAYOUT PARKING STRATEGY
- SITE LAYOUT CYCLE STRATEGY
- SITE LAYOUT REFUSE STRATEGY
- SITE LAYOUT FIRST FLOOR LEVEL
- SITE LAYOUT SECOND FLOOR LEVEL
- SITE LAYOUT THIRD FLOOR LEVEL
- LOCATION PLAN
- SITE LAYOUT ROOF LEVEL
- EXISTING SITE LAYOUT
- DEMOLITION PLAN
- STREET ELEVATIONS A1 A 2 B1
- STREET ELEVATIONS K J I H
- STREET ELEVATIONS G F E D A3 C B2
- DESIGN AND ACCESS STATEMENT
- OTHER STAKEHOLDER ENGAGEMENT
- TREE STRATEGY
- REFUSE STRATEGY
- LANDSCAPE KEY PLAN
- LANDSCAPE MASTERPLAN
- BOUNDARY TREATMENTS PLAN
- HARDWORKS PLAN (SHEET 01)
- HARDWORKS PLAN (SHEET 02)
- HARDWORKS PLAN (SHEET 03)
- HARDWORKS PLAN (SHEET 04)
- PLANTING PLAN (SHEET 01)
- PLANTING PLAN (SHEET 02)
- PLANTING PLAN (SHEET 03)
- PLANTING PLAN (SHEET 04)
- TREE PIT DETAILS (SHEET 1)
- TREE PIT DETAILS (SHEET 2)
- PLAY EQUIPMENT DETAILS
- FURNITURE DETAILS
- PLANTING SCHEDULE
- MAISONETTER BLOCK 01 ROOF PLAN
- ENVIRONMENTAL DNA SURVEY AND HABITAT SUITABILITY INDEX
- BIODIVERSITY NET GAIN PLAN
- PRELIMINARY ECOLOGCAL APPRAISAL
- PLANNING STATEMENT
- LIGHTING ASSESSMENT
- NOISE IMPACT ASSESSMENT
- WATER EFFICIENCY TECHNICAL NOTE
- SITE LOCATION
- SITE PHOTOGRAPHS
- SITE PHOTOGRAPHS
- SITE PHOTOGRAPHS
- SITE PHOTOGRAPHS
- SITE PHOTOGRAPHS
- SITE PHOTORAPHS
- SITE PHOTOGRAPHS
- SITE PHOTOGRAPHS
- SITE PHOTOGRAPHS
- SITE PHOTOGRAPHS
- TRANSPORT ASSESSMENT
- HEALTH IMPACT ASSESSMENT DESKTOP ASSESSMENT PAGE 1-50
- HEALTH IMPACT ASSESSMENT DESKTOP ASSESSMENT PAGE 51-61
- PRELIMINARY ROOST ASSESSMENT PAGE 1-50
- PRELIMINARY ROOST ASSESSMENT PAGE 51-65
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PAGE 1-50
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PAGE 51-98
- STATUTORY BIODIVERSITY METRIC
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge decided full applications in a median of 70 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Cambridge Technopark, Units 6 To 7 Newmarket Road Cambridge Cambridgeshire CB5 8PB
Certificate of lawfulness under S192 for a proposed use of building for ophthalmology (Class E(e)).
Withdrawn Lawful development -
Cambridge Technopark Newmarket Road Cambridge Cambridgeshire CB5 8PB
T7 - Norway Maple - Reduce back to previous points by approximately 3m all round - Good Tree Management, now starting to get heavy. T19 - Norway Maple - Cut to clear buildings by 2m. T20 - Oak - Lift branches off bike shed by 1.5m to prevent damage.
Withdrawn Trees 7 docsSmall domestic -
Cambridge Technopark Newmarket Road Cambridge Cambridgeshire CB5 8PB
T1 - Prunus - Multiple fruiting bodies. Pruning wounds on stem appear to have become root pockets. Reduce tree to 50% to suitable growth points. T2 - Norway Maple - Tree appears in terminal decline. Large diameter deadwood throughout. High target area. Remove tree to ground level. T5 - Lime - Lift canopy to 3m all round. T7 - Norway Maple - Remove epicormic growth on trunk. Cut to clear building by 1.5m. Lift canopy to 3m all round. T10 - Oak species - Lift canopy to 3m. T12 - Oak species - Lift over car parking space to approx 3m. T16 - Oak species - Lift over path to 2.5m. Remove large dead limb over highway. T19 - Norway Maple - Reduce crown to clear adjacent building by approx 3m. T20 - Oak species - Lift branches off Bike Shed before damage is caused.
Granted Trees 7 docsSmall domestic -
14 Keynes Road Cambridge CB5 8PR
Erection of conservatory to rear.
Granted Householder Extension 14 docsSmall domestic -
639 Newmarket Road Cambridge Cambridgeshire CB5 8WL
98% historically approved · decision due ~13 Oct
Submission of details required by condition 3 (arboricultural method statement (AMS) and tree protection plan (TPP)) of planning permission 26/00442/FUL
Awaiting decision Conditions Trees 6 docs -
639 Newmarket Road Cambridge Cambridgeshire CB5 8WL
Reconfiguration of existing and replacement HVAC equipment on the roof with associated ductwork.
Granted Full applications 19 docs
Other full applications
In Cambridge
-
26/02687/FUL Granted
Brookfields Health Centre Seymour Street Cambridge Cambridgeshire CB1 3DQ
Retrospective retention of existing modular building for a period of 5 years
-
26/02187/FUL Granted
43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR
Retrospective change of use of land to residential curtilage and installation of gravel area.
-
26/02187/HFUL Granted
43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR
Retrospective change of use of land to residential curtilage and installation of gravel area.
-
26/02716/FUL Granted
8 Lion Estates, Unit 1 Coldhams Road Cambridge Cambridgeshire CB1 3EW
Change of use from Class B8 warehouse with ancillary offices to a mixed use as Class E(g)(i) offices and Class F1(f) place of worship, or Class E(g)(i) and B8 in the alternative
-
26/02485/FUL Granted
Institute Of Astronomy, Observatory Building And Library Madingley Road Cambridge Cambridgeshire CB3 0HA
Alterations to provide improved disabled access, alongside general maintenance works. The scheme comprises the following: new external ramp to the eastern side of the central portico, new external ramp to service the exterior door in the western facade of the building, with interior mat well removed, regrading of external site levels to service the exterior door in the eastern facade of the building, with interior mat well removed, mechanisation of exterior doors and rearrangement of toilet block within eastern wing to provide disabled wc facility.