Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Ekin Road Cambridge Cambridgeshire

Awaiting decision Cambridge 26/00039/FUL Full Application

Works: New dwelling Demolition Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing dwellings and redevelopment to provide 134 No. new dwellings, parking, open space, landscaping and associated works.

As published by the council, reference 26/00039/FUL

Application record

Reference
26/00039/FUL
Type
Full Application
Status
Awaiting decision
Received
7 Jan 2026
Validated
7 Jan 2026
Ward
Abbey

Timeline

Dates from the published record

  1. 7 Jan 2026

    Received by Cambridge

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 4 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cambridge took a median of 53 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Carter Jonas LLP Agent

1,104 applications on PlanIndex · across 146 councils · 89% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

298 documents on file for this application

  • WASTE TEAM COMMENTS Consultee Comments · 16 Sep 2026
  • WASTE TEAM- S106 CONTRIBUTIONS Consultee Comments · 16 Sep 2026
  • NHS COMMENTS Consultee Comments · 16 Sep 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 10 Sep 2026
  • NATURAL ENGLAND Consultee Comments · 07 Sep 2026
  • NATURAL ENGLAND Consultee Comments · 07 Sep 2026
  • FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 07 Sep 2026
  • AIR QUALITY Consultee Comments · 03 Sep 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 03 Sep 2026
  • TREES Consultee Comments · 02 Sep 2026
  • ECOLOGY Consultee Comments · 02 Sep 2026
  • LANDSCAPE Consultee Comments · 02 Sep 2026
  • LANDSCAPE Consultee Comments · 02 Sep 2026
  • PLANNING AGENT ADDITIONAL REBUTTAL NOTE Application Survey / Assessment / Statement · 01 Sep 2026
  • SWIFT SURVEY- MKA ECOLOGY Application Survey / Assessment / Statement · 01 Sep 2026
  • BAT EMERGENCE SURVEYS- MKA ECOLOGY Application Survey / Assessment / Statement · 01 Sep 2026
  • ENVIRONMENTAL QUALITY AND GROWTH Consultee Comments · 01 Sep 2026
  • LLFA Consultee Comments · 28 Aug 2026
  • SUSTAINABILITY Consultee Comments · 27 Aug 2026
  • AIRPORT SAFEGUARDING Consultee Comments · 25 Aug 2026
  • WASTE - SHARED SERVICE Consultee Comments · 21 Aug 2026
  • ARCHAEOLOGICAL OFFICER Consultee Comments · 21 Aug 2026
  • CCTV - DRAINAGE SURVEY Application Survey / Assessment / Statement · 20 Aug 2026
  • WATER EFFICIENCY NOTE Application Survey / Assessment / Statement · 20 Aug 2026
  • BBC- MEETING NOTE Application Survey / Assessment / Statement · 20 Aug 2026
  • MKA ECOLOGY- SSSI RECREATIONAL IMPACT ASSESSMENT Application Survey / Assessment / Statement · 20 Aug 2026
  • HIGHWAYS ADOPTION PLAN Drawings · 20 Aug 2026
  • HIGHWAYS STOPPING UP PLAN Drawings · 20 Aug 2026
  • HIGHWAYS DIMENSION PLAN Drawings · 20 Aug 2026
  • OPTIONS APPRAISAL- EKIN ROAD REDEVELOPMENT Application Survey / Assessment / Statement · 20 Aug 2026
  • SUSTAINABILITY STATEMENT Application Survey / Assessment / Statement · 20 Aug 2026
  • OVERHEATING ASSESSMENT Application Survey / Assessment / Statement · 20 Aug 2026
  • CONSTRUCTION MANAGEMENT PLAN Application Survey / Assessment / Statement · 20 Aug 2026
  • REVISED TRAFFIC MANAGEMENT PLAN Application Survey / Assessment / Statement · 20 Aug 2026
  • EKIN ROAD RESIDENTS CONSTRUCTION INFORMATION LETTER Application Survey / Assessment / Statement · 20 Aug 2026
  • PROPOSED SITE LAYOUT- TENURE PLAN Drawings · 20 Aug 2026
  • PLANNING AGENT- REVISED SUBMISSION COVER LETTER Application Survey / Assessment / Statement · 20 Aug 2026
  • SAVILLS RESPONSE TO QUINTIC ON BEHALF OF THE APPLICANTS (JULY 2026) Application Survey / Assessment / Statement · 20 Aug 2026
  • QUINTIC FINAL RESPONSE TO SAVILLS ON BEHALF OF THE LPA (JULY 2026) Application Survey / Assessment / Statement · 20 Aug 2026
  • SAVILLS- FINAL RESPONSE TO QUINTIC ON BEHALF OF THE APPLICANTS Application Survey / Assessment / Statement · 20 Aug 2026
  • FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 20 Aug 2026
  • SAVILLS- VIABILITY REPORT ON BEHALF OF THE APPLICANTS Application Survey / Assessment / Statement · 06 Jul 2026
  • QUINTIC ADVISORY- VIABILITY REVIEW ON BEHALF OF THE LPA Consultee Comments · 06 Jul 2026
  • URBAN DESIGN Consultee Comments · 06 Jul 2026
  • ANGLIAN WATER Consultee Comments · 29 Jun 2026
  • PUBLIC ART CONSULTEE Consultee Comments · 18 Jun 2026
  • PUBLIC ART COMMENTS Consultee Comments · 18 Jun 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 18 Jun 2026
  • PUBLIC ART Consultee Comments · 18 Jun 2026
  • SUSTAINABILITY Consultee Comments · 17 Jun 2026
  • ECOLOGY Consultee Comments · 15 Jun 2026
  • ENVIRONMENTAL QUALITY AND GROWTH Consultee Comments · 12 Jun 2026
  • LANDSCAPE Consultee Comments · 10 Jun 2026
  • AIR QUALITY Consultee Comments · 10 Jun 2026
  • LOCAL LEAD FLOOD AUTHORITY Consultee Comments · 10 Jun 2026
  • WASTE - SHARED SERVICE Consultee Comments · 02 Jun 2026
  • PLACE SERVICES - TREES Consultee Comments · 02 Jun 2026
  • LANDSCAPE Consultee Comments · 02 Jun 2026
  • CAMBRIDGE CITY AIRPORT Consultee Comments · 29 May 2026
  • 33 EKIN ROAD Third Party Comments · 29 May 2026
  • COUNTY ARCHAEOLOGY Consultee Comments · 28 May 2026
  • COUNTY ARCHAEOLOGY (ATTACHMENT) Consultee Comments · 28 May 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 27 May 2026
  • FLAT BLOCK 1 - ELEVATIONS A B AND C Drawings · 27 May 2026
  • FLAT BLOCK 1 - ELEVATIONS D E AND F Drawings · 27 May 2026
  • FLAT BLOCK 2 - ELEVATIONS A B AND C Drawings · 27 May 2026
  • FLAT BLOCK 2 - ELEVATIONS D E AND F Drawings · 27 May 2026
  • FLAT BLOCK 3 - ELEVATIONS A B AND C Drawings · 27 May 2026
  • FLAT BLOCK 3 - ELEVATIONS D E AND F Drawings · 27 May 2026
  • HT01 - ELEVATIONS Drawings · 27 May 2026
  • HT02 - ELEVATIONS Drawings · 27 May 2026
  • HT03A - ELEVATIONS Drawings · 27 May 2026
  • HT03B - ELEVATIONS Drawings · 27 May 2026
  • HT04A - ELEVATIONS Drawings · 27 May 2026
  • HT04B - ELEVATIONS Drawings · 27 May 2026
  • HT05A ELEVATIONS Drawings · 27 May 2026
  • HT05B ELEVATIONS Drawings · 27 May 2026
  • HT06 - ELEVATIONS Drawings · 27 May 2026
  • HT07 - ELEVATIONS Drawings · 27 May 2026
  • MAISONETTE BLOCK 01 - ELEVATIONS A B C AND D Drawings · 27 May 2026
  • MAISONETTE BLOCK 02 - ELEVATIONS Drawings · 27 May 2026
  • SITE LAYOUT - GROUND FLOOR LEVEL Drawings · 27 May 2026
  • SITE LAYOUT - CYCLE STRATEGY Drawings · 27 May 2026
  • SITE LAYOUT - REFUSE STRATEGY Drawings · 27 May 2026
  • STREET ELEVATIONS A1 A2 AND B1 Drawings · 27 May 2026
  • STREET ELEVATIONS K J I H Drawings · 27 May 2026
  • STREET ELEVATIONS G F E D A3 C 2B Drawings · 27 May 2026
  • UPDATED DRAWING LIST & SUMMARY OF CHANGES Application Information · 27 May 2026
  • LANDSCAPE MASTERPLAN Drawings · 27 May 2026
  • BOUNDARY TREATMENTS PLAN Drawings · 27 May 2026
  • PLANTING PLAN 1 OF 4 Drawings · 27 May 2026
  • PLANTING PLAN 2 OF 4 Drawings · 27 May 2026
  • PLANTING PLAN 3 OF 4 Drawings · 27 May 2026
  • PLANTING PLAN 4 OF 4 Drawings · 27 May 2026
  • HARDWORKS PLAN 1 OF 4 Drawings · 27 May 2026
  • HARDWORKS PLAN 2 OF 4 Drawings · 27 May 2026
  • HARDWORKS PLAN 3 OF 4 Drawings · 27 May 2026
  • HARDWORKS PLAN 4 OF 4 Drawings · 27 May 2026
  • FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 18 May 2026
  • TRAFFIC MANAGEMENT PLAN AND CONSTRUCTION MANAGEMENT PLAN Application Survey / Assessment / Statement · 14 May 2026
  • TRANSPORT ASSESSMENT TEAM Consultee Comments · 29 Apr 2026
  • SECTION 106 OFFICER Consultee Comments · 07 Apr 2026
  • SECTION 106 OFFICER Superseded Documents · 18 Mar 2026
  • ECOLOGY Consultee Comments · 05 Mar 2026
  • DESIGNING OUT CRIME OFFICER Consultee Comments · 24 Feb 2026
  • CADENT GAS Consultee Comments · 24 Feb 2026
  • CADENT GAS COMMENTS Consultee Comments · 24 Feb 2026
  • NATURAL ENGLAND Consultee Comments · 24 Feb 2026
  • URBAN DESIGN Consultee Comments · 11 Feb 2026
  • ANGLIAN WATER REPORT Consultee Comments · 06 Feb 2026
  • COUNTY S106 COMMENTS Consultee Comments · 06 Feb 2026
  • LANDSCAPE Consultee Comments · 06 Feb 2026
  • FIRE & RESCUE SERVICES Consultee Comments · 05 Feb 2026
  • ENVIRONMENTAL QUALITY AND GROWTH Consultee Comments · 04 Feb 2026
  • 33 EKIN ROAD Third Party Comments · 04 Feb 2026
  • LAMBERT SMITH HAMPTON Third Party Comments · 04 Feb 2026
  • TREES Consultee Comments · 03 Feb 2026
  • AIR QUALITY Consultee Comments · 29 Jan 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 29 Jan 2026
  • SITE NOTICES Photographs · 26 Jan 2026
  • SUSTAINABILITY Consultee Comments · 26 Jan 2026
  • UNEX GROUP Third Party Comments · 26 Jan 2026
  • DAYLIGHT AND SUNLIGHT REPORT Application Information · 22 Jan 2026
  • DESIGN AND ACCESS STATEMENT PART 1 Application Information · 22 Jan 2026
  • DESIGN AND ACCESS STATEMENT PART 2 Application Information · 22 Jan 2026
  • DESIGN AND ACCESS STATEMENT PART 3 Application Information · 22 Jan 2026
  • DESIGN AND ACCESS STATEMENT PART 4 Application Information · 22 Jan 2026
  • PHASE 1 DESK STUDY PART 1 Application Information · 22 Jan 2026
  • PHASE 1 DESK STUDY PART 2 Application Information · 22 Jan 2026
  • PHASE 1 DESK STUDY PART 3 Application Information · 22 Jan 2026
  • PHASE 1 DESK STUDY PART 4 Application Information · 22 Jan 2026
  • PHASE 1 DESK STUDY PART 5 Application Information · 22 Jan 2026
  • EKIN ROAD VIEW 1 Application Information · 22 Jan 2026
  • EKIN ROAD VIEW 2 Application Information · 22 Jan 2026
  • EKIN ROAD VIEW 3 Application Information · 22 Jan 2026
  • EKIN ROAD VIEW 4 Application Information · 22 Jan 2026
  • EKIN ROAD VIEW 5 Application Information · 22 Jan 2026
  • BIODIVERSITY NET GAIN CALCULATIONS Application Information · 22 Jan 2026
  • EAST OF ENGLAND AMBULANCE SERVICE Consultee Comments · 21 Jan 2026
  • LOCAL LEAD FLOOD AUTHORITY COMMENTS Consultee Comments · 21 Jan 2026
  • 31B EKIN ROAD Third Party Comments · 16 Jan 2026
  • DESIGN AND ACCESS STATEMENT- PART 2 Design and Access Statement · 12 Jan 2026
  • DESIGN AND ACCESS STATEMENT- PART 3 Design and Access Statement · 12 Jan 2026
  • DESIGN AND ACCESS STATEMENT- PART 4 Design and Access Statement · 12 Jan 2026
  • BRE- DAYLIGHT SUNLIGHT REPORT Application Survey / Assessment / Statement · 12 Jan 2026
  • ARCHAEOLOGY COMMENTS Consultee Comments · 12 Jan 2026
  • CAMBRIDGE CITY AIRPORT Consultee Comments · 12 Jan 2026
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 09 Jan 2026
  • MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 09 Jan 2026
  • SITE NOTICE Application Press/Site Notices · 09 Jan 2026
  • VIEW 1 Drawings · 08 Jan 2026
  • VIEW 2 Drawings · 08 Jan 2026
  • VIEW 3 Drawings · 08 Jan 2026
  • VIEW 4 Drawings · 08 Jan 2026
  • VIEW 5 Drawings · 08 Jan 2026
  • PHASE 1- DESK STUDY Application Survey / Assessment / Statement · 08 Jan 2026
  • PHASE 1 DESK STUDY (PAGE 1-50) Application Survey / Assessment / Statement · 08 Jan 2026
  • PHASE 1 DESK STUDY (PAGE 51-100) Application Survey / Assessment / Statement · 08 Jan 2026
  • PHASE 1 DESK STUDY (PAGE 101-150) Application Survey / Assessment / Statement · 08 Jan 2026
  • PHASE 1 DESK STUDY (PAGE 151-196) Application Survey / Assessment / Statement · 08 Jan 2026
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 07 Jan 2026
  • FEE CALCULATION Application Information · 07 Jan 2026
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 07 Jan 2026
  • ENERGY STRATEGY Application Information · 07 Jan 2026
  • SUSTAINABILITY STATEMENT Application Survey / Assessment / Statement · 07 Jan 2026
  • OVERHEATING ASSESSMENT Application Survey / Assessment / Statement · 07 Jan 2026
  • ARBORICULTURAL IMPACT ASSESSMENT Drawings · 07 Jan 2026
  • TRANSPORT ASSESSMENT Application Survey / Assessment / Statement · 07 Jan 2026
  • TRAVEL PLAN Application Information · 07 Jan 2026
  • ARBORICULTURAL IMPACT ASSESSMENT AND TREE SURVEY Application Information · 07 Jan 2026
  • COVERING LETTER Application Information · 07 Jan 2026
  • FOUL DRAINAGE AND UTILITIES STATEMENT Application Survey / Assessment / Statement · 07 Jan 2026
  • SUMMARY OF COMMUNITY FEEDBACK Application Information · 07 Jan 2026
  • FLAT BLOCK 1 GROUND FLOOR PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 1 ROOF PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 1 TYPICAL FLOOR PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 1 ELEVATIONS A, B AND C Drawings · 07 Jan 2026
  • FLAT BLOCK 1 ELEVATIONS D E AND F Drawings · 07 Jan 2026
  • FLAT BLOCK 1 SECTIONS Drawings · 07 Jan 2026
  • FLAT BLOCK 2 GROUND FLOOR PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 2 TYPICAL FLOOR PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 2 ELEVATIONS A B AND C Drawings · 07 Jan 2026
  • FLAT BLOCK 2 ROOF PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 2 SECTIONS Drawings · 07 Jan 2026
  • FLAT BLOCK 3 GROUND FLOOR PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 3 ROOF PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 3 TYPICAL FLOOR PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 3 ELEVATIONS A B AND C Drawings · 07 Jan 2026
  • FLAT BLOCK 3 ELEVATIONSD E AND F Drawings · 07 Jan 2026
  • FLAT BLOCK 3 SECTIONS Drawings · 07 Jan 2026
  • PROPOSED SUBSTAION PLAN, SECTION AND ELEVATION Drawings · 07 Jan 2026
  • GROUND FIRST FLOOR AND ROOF PLANS AND SECTIONS AA AND BB Drawings · 07 Jan 2026
  • FLAT BLOCK 3 ROOF PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 3 TYPICAL FLOOR PLAN Drawings · 07 Jan 2026
  • FLAT BLOCK 3 ELEVATIONS A B AND C Drawings · 07 Jan 2026
  • FLAT BLOCK 3 ELEVATIONSD E AND F Drawings · 07 Jan 2026
  • FLAT BLOCK 3 SECTIONS Drawings · 07 Jan 2026
  • PROPOSED SUBSTAION PLAN, SECTION AND ELEVATION Drawings · 07 Jan 2026
  • GROUND FIRST FLOOR AND ROOF PLANS AND SECTIONS AA AND BB Drawings · 07 Jan 2026
  • HT01 ELEVATIONS Drawings · 07 Jan 2026
  • PLOT 38 GROUND AN FIRST FLOOR PLANS AND SECTIONS AA AND BB Drawings · 07 Jan 2026
  • HT02 ELEVATIONS Drawings · 07 Jan 2026
  • PLOT 58 AND 63 GROUND AND FIRST FLOOR PLAN AND SECTIONS AA AND BB Drawings · 07 Jan 2026
  • PLOT 50 GROUND, FIRST AND SECOND FLOOR PLANS AND SECTION EE, FF Drawings · 07 Jan 2026
  • HT03A ELEVATIONS Drawings · 07 Jan 2026
  • HT03B ELEVATIONS Drawings · 07 Jan 2026
  • HT04A 3B6P PLANS AND SECTIONS Drawings · 07 Jan 2026
  • HT04B 3B6P PLANS AND SECTIONS Drawings · 07 Jan 2026
  • HT04A ELEVATIONS Drawings · 07 Jan 2026
  • HT04B ELEVATIONS Drawings · 07 Jan 2026
  • HT05A 3B6P PLANS AND SECTIONS Drawings · 07 Jan 2026
  • HT05B 4B6P PLANS AND SECTIONS Drawings · 07 Jan 2026
  • HTO5A ELEVATIONS Drawings · 07 Jan 2026
  • HT05B ELEVATIONS Drawings · 07 Jan 2026
  • FLAT BLOCK 2 ELEVATIONS D E AND F Drawings · 07 Jan 2026
  • HT06 ELEVATIONS Drawings · 07 Jan 2026
  • HT07A 2B4P PLANS AND SECTIONS Drawings · 07 Jan 2026
  • HT07B 2BAP PLANS AND SECTIONS Drawings · 07 Jan 2026
  • HT07 ELEVATIONS Drawings · 07 Jan 2026
  • HT06 5B8P PLANS AND SECTIONS Drawings · 07 Jan 2026
  • MAISONETTE BLOCK 01 GROUND AND FIRST FLOOR PLANS Drawings · 07 Jan 2026
  • MAISONETTER BLOCK 01 SECOND AND THIRD FLOOR PLANS Drawings · 07 Jan 2026
  • MAISONETTER BLOCK 01 ELEVATIONS A B C AND D Drawings · 07 Jan 2026
  • MAISONETTE BLOCK 01 SECTION Drawings · 07 Jan 2026
  • MAISONETTE BLOCK 02 GROUND AND FIRST FLOOR PLANS Drawings · 07 Jan 2026
  • MAISONETTER BLOCK 02 FIRST AND SECOND FLOOR PLANS Drawings · 07 Jan 2026
  • MAISONETTE BLOCK 02 MAISONETTE ROOF PLAN Drawings · 07 Jan 2026
  • MAISONETTER BLOCK 02 ELEVATIONS Drawings · 07 Jan 2026
  • MAISONETTER BLOCK 02 SECTIONS Drawings · 07 Jan 2026
  • SITE LAYOUT GROND FLOOR LEVEL Drawings · 07 Jan 2026
  • SITE ELEVATIONS KEY PLAN Drawings · 07 Jan 2026
  • SITE LAYOUT TENURE STRATEGY Drawings · 07 Jan 2026
  • SITE LAYOUT PARKING STRATEGY Drawings · 07 Jan 2026
  • SITE LAYOUT CYCLE STRATEGY Drawings · 07 Jan 2026
  • SITE LAYOUT REFUSE STRATEGY Drawings · 07 Jan 2026
  • SITE LAYOUT FIRST FLOOR LEVEL Drawings · 07 Jan 2026
  • SITE LAYOUT SECOND FLOOR LEVEL Drawings · 07 Jan 2026
  • SITE LAYOUT THIRD FLOOR LEVEL Drawings · 07 Jan 2026
  • LOCATION PLAN Drawings · 07 Jan 2026
  • SITE LAYOUT ROOF LEVEL Drawings · 07 Jan 2026
  • EXISTING SITE LAYOUT Drawings · 07 Jan 2026
  • DEMOLITION PLAN Drawings · 07 Jan 2026
  • STREET ELEVATIONS A1 A 2 B1 Drawings · 07 Jan 2026
  • STREET ELEVATIONS K J I H Drawings · 07 Jan 2026
  • STREET ELEVATIONS G F E D A3 C B2 Drawings · 07 Jan 2026
  • DESIGN AND ACCESS STATEMENT Design and Access Statement · 07 Jan 2026
  • OTHER STAKEHOLDER ENGAGEMENT Application Information · 07 Jan 2026
  • TREE STRATEGY Application Survey / Assessment / Statement · 07 Jan 2026
  • REFUSE STRATEGY Application Survey / Assessment / Statement · 07 Jan 2026
  • LANDSCAPE KEY PLAN Drawings · 07 Jan 2026
  • LANDSCAPE MASTERPLAN Drawings · 07 Jan 2026
  • BOUNDARY TREATMENTS PLAN Drawings · 07 Jan 2026
  • HARDWORKS PLAN (SHEET 01) Drawings · 07 Jan 2026
  • HARDWORKS PLAN (SHEET 02) Drawings · 07 Jan 2026
  • HARDWORKS PLAN (SHEET 03) Drawings · 07 Jan 2026
  • HARDWORKS PLAN (SHEET 04) Drawings · 07 Jan 2026
  • PLANTING PLAN (SHEET 01) Drawings · 07 Jan 2026
  • PLANTING PLAN (SHEET 02) Drawings · 07 Jan 2026
  • PLANTING PLAN (SHEET 03) Drawings · 07 Jan 2026
  • PLANTING PLAN (SHEET 04) Drawings · 07 Jan 2026
  • TREE PIT DETAILS (SHEET 1) Drawings · 07 Jan 2026
  • TREE PIT DETAILS (SHEET 2) Drawings · 07 Jan 2026
  • PLAY EQUIPMENT DETAILS Drawings · 07 Jan 2026
  • FURNITURE DETAILS Drawings · 07 Jan 2026
  • PLANTING SCHEDULE Drawings · 07 Jan 2026
  • MAISONETTER BLOCK 01 ROOF PLAN Drawings · 07 Jan 2026
  • ENVIRONMENTAL DNA SURVEY AND HABITAT SUITABILITY INDEX Application Survey / Assessment / Statement · 07 Jan 2026
  • BIODIVERSITY NET GAIN PLAN Application Information · 07 Jan 2026
  • PRELIMINARY ECOLOGCAL APPRAISAL Application Information · 07 Jan 2026
  • PLANNING STATEMENT Application Survey / Assessment / Statement · 07 Jan 2026
  • LIGHTING ASSESSMENT Application Survey / Assessment / Statement · 07 Jan 2026
  • NOISE IMPACT ASSESSMENT Application Survey / Assessment / Statement · 07 Jan 2026
  • WATER EFFICIENCY TECHNICAL NOTE Application Information · 07 Jan 2026
  • SITE LOCATION Drawings · 07 Jan 2026
  • SITE PHOTOGRAPHS Photographs · 07 Jan 2026
  • SITE PHOTOGRAPHS Photographs · 07 Jan 2026
  • SITE PHOTOGRAPHS Photographs · 07 Jan 2026
  • SITE PHOTOGRAPHS Photographs · 07 Jan 2026
  • SITE PHOTOGRAPHS Photographs · 07 Jan 2026
  • SITE PHOTORAPHS Photographs · 07 Jan 2026
  • SITE PHOTOGRAPHS Photographs · 07 Jan 2026
  • SITE PHOTOGRAPHS Photographs · 07 Jan 2026
  • SITE PHOTOGRAPHS Photographs · 07 Jan 2026
  • SITE PHOTOGRAPHS Photographs · 07 Jan 2026
  • TRANSPORT ASSESSMENT Application Survey / Assessment / Statement · 07 Jan 2026
  • HEALTH IMPACT ASSESSMENT DESKTOP ASSESSMENT PAGE 1-50 Application Survey / Assessment / Statement · 07 Jan 2026
  • HEALTH IMPACT ASSESSMENT DESKTOP ASSESSMENT PAGE 51-61 Application Survey / Assessment / Statement · 07 Jan 2026
  • PRELIMINARY ROOST ASSESSMENT PAGE 1-50 Application Survey / Assessment / Statement · 07 Jan 2026
  • PRELIMINARY ROOST ASSESSMENT PAGE 51-65 Application Survey / Assessment / Statement · 07 Jan 2026
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PAGE 1-50 Application Survey / Assessment / Statement · 07 Jan 2026
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PAGE 51-98 Application Survey / Assessment / Statement · 07 Jan 2026
  • STATUTORY BIODIVERSITY METRIC Application Information · 22 Dec 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge decided full applications in a median of 74 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Unit 7 Cambridge Technopark Newmarket Road Cambridge Cambridgeshire

    24/04169/S73 Submitted 6 Nov 2024 150 yards away

    S73 of the removal of condition 6 (erection of research and development building) attached to planning permission C/82/0507 to enable unrestricted use under Class E.

    Granted Amendments 16 docs
  • Cambridge Technopark, Units 6 To 7 Newmarket Road Cambridge Cambridgeshire CB5 8PB

    24/03914/CL2PD Submitted 18 Oct 2024 150 yards away

    Certificate of lawfulness under S192 for a proposed use of building for ophthalmology (Class E(e)).

    Withdrawn Lawful development 10 docs
  • Cambridge Technopark Newmarket Road Cambridge Cambridgeshire CB5 8PB

    26/0609/TTPO Submitted 15 Jun 2026 150 yards away

    T7 - Norway Maple - Reduce back to previous points by approximately 3m all round - Good Tree Management, now starting to get heavy. T19 - Norway Maple - Cut to clear buildings by 2m. T20 - Oak - Lift branches off bike shed by 1.5m to prevent damage.

    Withdrawn Trees 7 docs
    Small domestic
  • Cambridge Technopark Newmarket Road Cambridge Cambridgeshire CB5 8PB

    24/0912/TTPO Submitted 21 Aug 2024 150 yards away

    T1 - Prunus - Multiple fruiting bodies. Pruning wounds on stem appear to have become root pockets. Reduce tree to 50% to suitable growth points. T2 - Norway Maple - Tree appears in terminal decline. Large diameter deadwood throughout. High target area. Remove tree to ground level. T5 - Lime - Lift canopy to 3m all round. T7 - Norway Maple - Remove epicormic growth on trunk. Cut to clear building by 1.5m. Lift canopy to 3m all round. T10 - Oak species - Lift canopy to 3m. T12 - Oak species - Lift over car parking space to approx 3m. T16 - Oak species - Lift over path to 2.5m. Remove large dead limb over highway. T19 - Norway Maple - Reduce crown to clear adjacent building by approx 3m. T20 - Oak species - Lift branches off Bike Shed before damage is caused.

    Granted Trees 7 docs
    Small domestic
  • 14 Keynes Road Cambridge CB5 8PR

    20/03196/HFUL Submitted 23 Jul 2020 200 yards away

    Erection of conservatory to rear.

    Granted Householder Extension 14 docs
    Small domestic
  • 59 Keynes Road Cambridge Cambridgeshire CB5 8PP

    21/01651/HFUL Submitted 10 May 2021 200 yards away

    First floor side extension to house.

    Granted Householder Extension 8 docs
    Domestic

In Cambridge

  • 26/02377/FUL Granted

    5 Davy Road Cambridge Cambridgeshire CB1 3QW

    Two storey front extension, a single storey rear extension (following the removal of the existing side and single storey rear extensions). Conversion of existing roof space following the reconstruction with a raised ridge height, to create 1no 3bed dwelling adjacent to the existing house.

    Received 23 Jun, published by the council 23 Jul 2026 Full applications
  • 26/03042/FUL Granted

    Botanical Gardens, Plant Growth Facility Department Of Plant Science Bateman Street Cambridge Cambridgeshire CB2 1LR

    Installation of a new stand-by Generator and acoustic enclosure at the Sainsbury Laboratory to serve Building B in mains fail conditions.

    Received 11 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03008/FUL Granted

    24 Luard Road Cambridge Cambridgeshire CB2 8PJ

    Demolition of existing dwelling and construction of new 2.5 storey dwelling and associated landscaping

    Received 10 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03002/FUL Granted

    The Pickerel Inn 30 Magdalene Street Cambridge Cambridgeshire CB3 0AF

    Remove existing jumbrellas 2 no. and replace with a new Mirador Pergola to the rear courtyard

    Received 7 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03729/FUL Awaiting decision

    27-28 Bridge Street Cambridge Cambridgeshire CB2 1UJ

    Installation of new shopfront and seating at the rear external court yard with proposed conservatory glass roof.

    Received 2 Oct, published by the council 9 Oct 2026 Full applications