Planning application
Hanover Court And Princess Court Bentinck Street Cambridge Cambridgeshire CB2 1JJ
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing buildings and erection of 165 new homes, landscaping, community room, parking and associated works
As published by the council, reference 25/04187/FUL
Application record
- Reference
- 25/04187/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 28 Oct 2025
- Validated
- 28 Oct 2025
- Ward
- Market
- Postcode
- CB2 1JJ
Timeline
Dates from the published record
-
28 Oct 2025
Received by Cambridge
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cambridge took a median of 53 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Carter Jonas LLP Agent
1,102 applications on PlanIndex · across 146 councils · 89% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
193 documents on file for this application
- COMMITTEE REPORT
- AGENT/APPLICANT PUBLIC SPEAKING LETTER
- TREE OFFICER COMMENTS
- LOCAL HIGHWAY AUTHORITY
- ARBORICULTURAL METHOD STATEMENT & TREE PROTECTION PLAN - DRAWINGS
- ARBORICULTURAL METHOD STATEMENT & TREE PROTECTION PLAN
- FOUL FLOW CALCULATIONS EXISTING VS PROPOSED
- LANDSCAPE MASTERPLAN
- QUINTIC ADVISORY- VIABILITY RESPONSE
- SAVILLS RESPONSE TO QUINTIC - MAY 2026
- PLANNING AGENT VIABILITY- COVERING LETTER
- BNE LANDSCAPE
- SAVILLS- VIABILITY REPORT ON BEHALF OF THE APPLICANTS
- QUINTIC ADVISORY- VIABILITY REVIEW ON BEHALF OF THE LPA
- QUINTIC ADVISORY- UPDATED APPRAISAL (INCLUDING DECANT COSTS)
- QUINTIC ADVISORY- VIABILITY REVIEW ON BEHALF OF THE LPA
- SAVILLS- FINANCIAL VIABILITY- APPLICANTS RESPONSE TO LPA
- SHARED WASTE SERVICE COMMENTS
- AMENDED TRAFFIC MANAGEMENT PLAN- REV C
- TREE PROTECTION PLANS- ALL PHASES OF DEVELOPMENT
- AMS AND TPP
- URBAN DESIGN COMMENTS
- EOT REQUEST
- ANGLIAN WATER
- BNE LANDSCAPE
- ECOLOGY
- TREES
- LOCAL HIGHWAY AUTHORITY
- SUSTAINABILITY
- HISTORIC ENGLAND
- CONSERVATION
- LLFA
- CADENTGAS
- CADENTGAS
- ENVIRONMENTAL QUALITY AND GROWTH
- FOOTPATH PLAN- RESPONSE TO CCC HIGHWAYS
- TRAFFIC MANAGEMENT PLAN DRAWING
- TRAFFIC MANAGEMENT PLAN -DEMOLITION WORKS ONLY
- AIRPORT SAFEGUARDING
- NATURAL ENGLAND
- ARCHAEOLOGICAL OFFICER
- MIXED TENURE SUBJECT TO FUNDING
- PRIVATE SALE ONLY
- FILE COPY OF AMENDMENT LETTER
- WASTE - SHARED SERVICE
- TRAVEL PLAN
- REVISED TRANSPORT ASSESSMENT
- COVERING LETTER REVISED SUBMISSION
- CCTV DRAINAGE SURVEY
- HEALTH IMPACT ASSESSMENT
- ENTRANCE DETAILS
- BALCONY DETAIL
- FACADE DETAILS
- SITE LOCATION PLAN
- ACCOMMODATION SCHEDULE- SUBJECT TO HE FUNDING
- ACCOMMODATION SCHEDULE- PRIVATE ONLY
- DETAILED ELEVATIONS SHEET 2
- DETAILED ELEVATIONS SHEET 1
- ELEVATIONS SHEET 4
- ELEVATIONS SHEET 3
- ELEVATIONS SHEET 2
- ELEVATIONS SHEET 1
- TYPICAL FLOOR PLAN
- PROPOSED SITE PLAN.
- EXISTING SITE PLAN.
- ROOF PLAN
- FIFTH FLOOR PLAN
- FOURTH FLOOR PLAN
- GROUND FLOOR PLAN.
- HIGHWAYS WORK PLAN.
- FIFTH FLOOR - BLOCK C AND D
- FIFTH FLOOR - BLOCK A, B AND E
- TYPICAL FLOOR - BLOCK C AND D
- TYPICAL FLOOR - BLOCK A, B AND E
- GROUND FLOOR - BLOCK C AND D
- GROUND FLOOR - BLOCK A, B AND E
- RESPONSE TO LANDSCAPE AND TREE OFFICER COMMENTS
- LEGEND- SOFTSCAPE & HARDSCAPE
- TREE PLAN
- PLANTING PLAN
- HARD LANDSCAPE PLAN
- MASTERPLAN
- LANDSCAPE DRAWING SCHEDULE
- SECTIONS 01
- VIABILITY REPORT
- COVERING LETTER- VIABILITY
- TRANSPORT ASSESSMENT TEAM
- ACCESS OFFICER COMMENTS
- ENVIRONMENT AGENCY COMMENTS
- SECTION 106 OFFICER
- TREES
- CAMBS FIRE
- ENVIRONMENTAL QUALITY AND GROWTH
- LANDSCAPE
- SUSTAINABILITY
- BNG METRIC
- URBAN DESIGN COMMENTS
- BNE - CONSERVATION
- LOCAL HIGHWAY AUTHORITY
- ECOLOGY
- HISTORIC ENGLAND
- COUNTY EDUCATION
- ANGLIAN WATER COMMENTS
- LOCAL LEAD FLOOD AUTHORITY
- CADENT GAS
- NATURAL ENGLAND
- DESIGNING OUT CRIME OFFICER
- CADENT GAS
- WASTE - SHARED SERVICE
- CAMBRIDGESHIRE & PETERBOROUGH INTEGRATED CARE SYSTEM
- AIRPORT SAFEGUARDING
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- SITE NOTICE
- APPLICATION FORM
- ARCHAOELOGY COMMENTS
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- FEE CALCULATION
- ATTACHMENT SUMMARY FROM PORTAL
- AIR QUALITY ASSESSMENT
- SUMMARY REPORT REMOVAL OF LONDON PLANE TREES
- ARCHAEOLOGICAL DBA
- BRE DAYLIGHT AND SUNLIGHT NEIGHBOURING STUDY
- BNG REPORT
- BUILT HERITAGE STATEMENT
- COVERING LETTER
- DEMOLITION ENVIRONMENTAL MANAGEMENT PLAN
- PART 1 OF 2 DESIGN AND ACCESS STATEMENT
- PART 2 OF 2 DESIGN AND ACCESS STATEMENT
- DUST AND DIRT MANAGEMENT PLAN
- BRE DAYLIGHT AND SUNLIGHT INTERNAL REPORT
- EXISTING BUILDINGS - PHOTO SCHEDULE LOCATION PLAN
- EXISTING BUILDINGS PHOTO SCHEDULE
- EMBODIED CARBON ASSESSMENT REPORT
- YOUTH ENGAGEMENT REPORT
- PLANNING STATEMENT
- SITE LOCATION PLAN
- FACADE DETAILS
- BALCONY DETAIL
- ENTRANCE DETAILS
- ELEVATIONS 1 OF 4
- ELEVATIONS 2 OF 4
- ELEVATIONS 3 OF 4
- ELEVATIONS 4 OF 4
- DETAILED ELEVATIONS 1 OF 2
- DETAILED ELEVATIONS 2 OF 2
- GROUND FLOOR PLAN
- FOURTH FLOOR PLAN
- FIFTH FLOOR PLAN
- ROOF PLAN
- EXISTING SITE PLAN
- PROPOSED SITE PLAN
- TYPICAL FLOOR PLAN
- GROUND FLOOR - BLOCK A B AND E
- GROUND FLOOR - BLOCK C AND D
- TYPICAL FLOOR - BLOCK A B AND E
- TYPICAL FLOOR - BLOCK C AND D
- FIFTH FLOOR - BLOCK A B AND E
- FIFTH FLOOR - BLOCK C AND D
- SECTIONS 01
- MASTERPLAN
- HARDSCAPE PLAN
- PLANTING PLAN
- TREE PLAN
- SECTION AA BB
- NOISE IMPACT ASSESSMENT
- PRE-DEMOLITION AUDIT
- PRELIMINARY ECOLOGICAL APPRAISAL
- STATEMENT OF COMMUNITY INVOLVEMENT
- ENERGY AND SUSTAINABILITY STATEMENT
- THERMAL COMFORT ASSESSMENT
- TOPO SURVEY
- TOWNSCAPE VISUAL IMPACT ASSESSMENT
- TRANSPORT ASSESSMENT
- TRAVEL PLAN
- TREE SURVEY AND AIA
- TREE SURVEY AND AIA DRAWING
- FRA AND DRAINAGE STRATEGY PAGE 1-49
- FRA AND DRAINAGE STRATEGY PAGE 50-99
- FRA AND DRAINAGE STRATEGY PAGE 100-149
- FRA AND DRAINAGE STRATEGY PAGE 150-199
- FRA AND DRAINAGE STRATEGY PAGE 200-245
- PRELIMINARY RISK ASSESSMENT REPORT - PHASE 1 PAGE 1-49
- PRELIMINARY RISK ASSESSMENT REPORT - PHASE 1 PAGE 50-99
- PRELIMINARY RISK ASSESSMENT REPORT - PHASE 1 PAGE 100-153
- SUBSTATION PLANS 1 OF 3
- SUBSTATION PLANS 2 OF 3
- SUBSTATION PLANS 3 OF 3
- TIER 2 GROUND CONDITIONS REPORT PAGE 1-49
- TIER 2 GROUND CONDITIONS REPORT PAGE 50-99
- TIER 2 GROUND CONDITIONS REPORT PAGE 100-174
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge decided full applications in a median of 74 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
12 Union Road Cambridge Cambridgeshire CB2 1EZ
Installation of 37 solar panels
Granted Prior approval 16 docs -
14-18 George IV Street And 20 - 22 Hills Road Cambridge Cambridgeshire CB2 1PF
EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for proposed development at 14-18 George Street and 20-22 Hills Road
Decided Outline 7 docs -
Cintra House 12 Hills Road Cambridge Cambridgeshire CB2 1PF
Rear extension and increase approved basement.
Granted Full applications Extension 69 docs -
Cintra House 12 Hills Road Cambridge Cambridgeshire CB2 1PF
Rear extension and increase approved basement.
Granted Heritage and listed buildings Extension 59 docs -
Cintra House 12 Hills Road Cambridge Cambridgeshire CB2 1JP
Demolition of the following: a) Upper floors beam and pot slabs to the rear of the longitudinal central concrete beam that runs along the front of the existing concrete lift core walls. b) Complete concrete core containing a single stair and double lift shaft. c) Rear portion of the flank wall along the boundary with No 10 Hills Road (North-West elevation). d) Rear portion of the flank wall along the boundary with No 20 Hills Road (South-East elevation).
Granted Heritage and listed buildings Demolition 29 docs -
Other full applications
In Cambridge
-
26/02377/FUL Granted
5 Davy Road Cambridge Cambridgeshire CB1 3QW
Two storey front extension, a single storey rear extension (following the removal of the existing side and single storey rear extensions). Conversion of existing roof space following the reconstruction with a raised ridge height, to create 1no 3bed dwelling adjacent to the existing house.
-
26/03042/FUL Granted
Botanical Gardens, Plant Growth Facility Department Of Plant Science Bateman Street Cambridge Cambridgeshire CB2 1LR
Installation of a new stand-by Generator and acoustic enclosure at the Sainsbury Laboratory to serve Building B in mains fail conditions.
-
26/03008/FUL Granted
24 Luard Road Cambridge Cambridgeshire CB2 8PJ
Demolition of existing dwelling and construction of new 2.5 storey dwelling and associated landscaping
-
26/03002/FUL Granted
The Pickerel Inn 30 Magdalene Street Cambridge Cambridgeshire CB3 0AF
Remove existing jumbrellas 2 no. and replace with a new Mirador Pergola to the rear courtyard
-
26/03729/FUL Awaiting decision
27-28 Bridge Street Cambridge Cambridgeshire CB2 1UJ
Installation of new shopfront and seating at the rear external court yard with proposed conservatory glass roof.