Planning application
Merton Court St Johns College St Johns Street Cambridge Cambridgeshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of a footbridge over Bin Brook. Removal of concrete revetments and re-profiling of the banks. Installation and upgrading of existing pathways and associated landscaping to the brook and the areas on either side.
As published by the council, reference 24/02345/FUL
Application record
- Reference
- 24/02345/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Granted Permission
- Received
- 18 Jun 2024
- Validated
- 25 Jun 2024
- Decided
- 15 Oct 2024
- Ward
- Newnham
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
18 Jun 2024
Received by Cambridge
-
25 Jun 2024
Validated
Checked as complete and ready for consideration.
-
15 Oct 2024
Decision issued: Granted Permission
-
9 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
67 documents on file for this application
- OFFICER DELEGATION REPORT
- DECISION NOTICE
- LANDSCAPE ADDENDUM
- REVISED LOCATION PLAN
- BIODIVERSITY NET GAIN METRIC
- ECOLOGY
- EOT REQUEST
- NATURE CONSERVATION
- THE GARDENS TRUST
- BNE LANDSCAPE
- ENVIRONMENTAL QUALITY AND GROWTH
- STREETS AND OPEN SPACES
- LOCAL HIGHWAY AUTHORITY
- BNE - CONSERVATION
- HISTORIC ENGLAND COMMENTS
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- SITE NOTICE
- INVALID LETTER
- PLANVIEW
- PLANVIEW
- 5R-2754D-102
- OPTION D - CROSS SECTION 7
- PROPOSED PLANVIEW
- PROPOSED SECTION
- PLAN VIEW COMBINED
- PROPOSED SECTION 7
- PROPOSED SECTION 6
- PROPOSED SECTION 589
- FEE CALCULATION
- APPLICATION FORM - NO PERSONAL INFO
- ATTACHMENT SUMMARY FROM PORTAL
- APP B1 RECORDED FLOOD OUTLINES
- APP C1 NODE LOCATIONS FULL MODEL
- APPC2 NODE LOCATIONS SITE ONLY
- LANDSCAPE STATEMENT
- CROSS SECTIONS 5,8,9
- CROSS SECTION 6
- BIN BROOK/DELTA SIMONS LETTER_24-06-09_REDACTED
- FIGURE E1 MAX DEPTH BASELINE 1 IN 2 YEAR
- FIGURE E6 DIFFERENCE IN MAX WATER LEVEL PROPOSED - BASELINE 1 IN 2 YEAR
- MAX IN CHANNEL FLOWS AND DIFFERENCES
- MAX WATER LEVELS AND DIFFERENCES
- ARBORICULTURAL IMPACT ASSESSMENT
- BIN BROOK BRIDGE GENERAL ARRANGEMENT
- BIN BROOK BRIDGE SITE OVERVIEW
- HERITAGE STATEMENT
- PLANNING STATEMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- BAT ACTIVITY SURVEY
- PRELIMINARY ECOLOGICAL APPRAISAL
- WATER VOLE AND OTTER SURVEY
- FLOOD RISK MODELLING AND ASSESSMENT
- STAGE1 - HYDRAULIC ASSESSMENT
- BIN BROOK LOCATION PLAN
- BIN BROOK EXISTING CONDITIONS
- BIN BROOK GENERAL ARRANGEMENT
- BIN BROOK EXISTING AND PROPOSED LEVELS
- BIN BROOK GENERAL ARRANGEMENT PHASE 2
- BIN BROOK GENERAL ARRANGEMENT PHASE 3 ONLY
- BIN BROOK HARDSCAPE PLAN
- BIN BROOK BRIDGE SECTION EXISTING AND PROPOSED
- GRAVEL BEACH SECTION EXISTING AND PROPOSED
- BIN BROOK INDICATIVE SHRUB_PERENNIAL PLAN
- BIN BROOK TREE PLAN
- ARCHAEOLOGICAL DESK BASED ASSESSMENT (PAGE 1-50)
- ARCHAEOLOGICAL DESK BASED ASSESSMENT (PAGE 51-70)
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Cambridge granted permission on 15 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Merton Hall Cottage Northampton Street Cambridge Cambridgeshire CB3 0AD
91% historically approved · decision due ~19 Oct
Erection of student accommodation comprising 48 bedrooms, refurbishment and improvement works to Merton House and Merton Cottage and erection of an Energy Centre including the provision of cycle,bin stores and landscaping.
Awaiting decision Full applications 149 docs -
Merton Hall Cottage Northampton Street Cambridge Cambridgeshire CB3 0AD
97% historically approved · decision due ~16 Oct
Refurbishment, repair and alteration works to Merton House and Merton Cottage, including thermal performance upgrades, repair and replacement of roof coverings, associated roof structures, installation of internal wall, floor and roof insulation, repair, refurbishment and selective replacement of windows including secondary and vacuum glazing, replacement of rainwater goods, internal reconfiguration and upgrading of accommodation, damp remediation, structural repairs and underpinning works. Removal of later additions and alterations, demolition and reconstruction of the coach house, stores and associated boundary wall using salvaged materials, demolition of various outbuildings, reconfiguration of access arrangements including formation of an accessible entrance to Merton House, rebuilding and reskinning of the 1960s extension at Merton House, installation of air source heat pump enclosure at Merton Cottage, associated repair, conservation and ancillary works, and works within the registered park and garden.
Awaiting decision Heritage and listed buildings Extension Demolition +1 106 docsSmall domestic -
St Johns College St Johns Street Cambridge CB2 1TP
Submission of details required by condition 5 (Protection of Bin Brook Bridge) of planning permission 20/04887/LBC
Granted Conditions 9 docs -
St Johns College St Johns Street Cambridge Cambridgeshire CB2 1TP
Submission of details required by condition 3 (partial discharge) (Window details) of listed building consent 20/03218/LBC
Granted Conditions Windows or glazing 9 docs -
St Johns College St Johns Street Cambridge CB2 1TP
Conditions 3 (Dust), 4 (Noise and Vibration), 19 (Bird and Bat boxes) and 20 (Ecologically Sensitive Lighting Scheme) of planning permission 20/03217/FUL
Granted Conditions 17 docs -
St Johns College St Johns Street Cambridge CB2 1TP
Demolition of existing buttery dining room and construction of new extension for dining facilities; ii) dismantling and rebuilding of Grade I gate piers to Kitchen Lane; iii) re-grading of existing terrace in Kitchen Lane to provide new external seating; and iv) installation of associated plant.
Granted Full applications Extension Demolition 118 docs
Other full applications
In Cambridge
-
26/02377/FUL Granted
5 Davy Road Cambridge Cambridgeshire CB1 3QW
Two storey front extension, a single storey rear extension (following the removal of the existing side and single storey rear extensions). Conversion of existing roof space following the reconstruction with a raised ridge height, to create 1no 3bed dwelling adjacent to the existing house.
-
26/03042/FUL Granted
Botanical Gardens, Plant Growth Facility Department Of Plant Science Bateman Street Cambridge Cambridgeshire CB2 1LR
Installation of a new stand-by Generator and acoustic enclosure at the Sainsbury Laboratory to serve Building B in mains fail conditions.
-
26/03008/FUL Granted
24 Luard Road Cambridge Cambridgeshire CB2 8PJ
Demolition of existing dwelling and construction of new 2.5 storey dwelling and associated landscaping
-
26/03002/FUL Granted
The Pickerel Inn 30 Magdalene Street Cambridge Cambridgeshire CB3 0AF
Remove existing jumbrellas 2 no. and replace with a new Mirador Pergola to the rear courtyard
-
26/03729/FUL Awaiting decision
27-28 Bridge Street Cambridge Cambridgeshire CB2 1UJ
Installation of new shopfront and seating at the rear external court yard with proposed conservatory glass roof.