Skip to content
PlanIndex Get alerts
Menu

Planning application

St Johns College St Johns Street Cambridge CB2 1TP

Granted Cambridge 20/03217/CONDA Condition request

Relates to 20/03217/FUL

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conditions 3 (Dust), 4 (Noise and Vibration), 19 (Bird and Bat boxes) and 20 (Ecologically Sensitive Lighting Scheme) of planning permission 20/03217/FUL

As published by the council, reference 20/03217/CONDA

Application record

Reference
20/03217/CONDA
Type
Condition request
Status
Decided
Decision
Granted As published: Discharge Condition in Full
Received
7 May 2021
Validated
7 May 2021
Decided
24 Jun 2021
Ward
Newnham
Decision by
Delegated (Condition)
Postcode
CB2 1TP

Site history

Applications at this address on the Cambridge register

This site has had 5 applications since 2020: 5 approved, 0 refused.

  • 20/04887/CONDA Granted

    St Johns College St Johns Street Cambridge CB2 1TP

    Submission of details required by condition 5 (Protection of Bin Brook Bridge) of planning permission 20/04887/LBC

    Decided 19 Jul 2021 Conditions
  • 21/0019/TTCA Granted

    St Johns College St Johns Street Cambridge CB2 1TP

    T1 WILLOW LEANING HEAVILY OVER RIVER ~ reduce limb growing towards Cripps building back to natural upright secondary branch (see photos 2 and 3), being an approximate reduction of 3.5ms to lessen extent of lean ~ pls note reduction of this limb will still retain a natural curved outer canopy line; lift canopy over river by 2ms and thin remaining crown by 15 to 20%.

    Decided 8 Feb 2021 Trees
  • 20/03217/FUL Granted

    St Johns College St Johns Street Cambridge CB2 1TP

    Demolition of existing buttery dining room and construction of new extension for dining facilities; ii) dismantling and rebuilding of Grade I gate piers to Kitchen Lane; iii) re-grading of existing terrace in Kitchen Lane to provide new external seating; and iv) installation of associated plant.

    Decided 5 Nov 2020 Full applications
  • 20/03218/LBC Granted

    St Johns College St Johns Street Cambridge CB2 1TP

    Demolition of existing buttery dining room and construction of new extension for dining facilities, ii) dismantle and rebuild Grade I Eagle Gate Piers in revised location, iii) creation of new openings in southern elevation of Second Court to provide level access between the new extension and Second Court, iv) internal fabric improvements to floors, walls and ceiling of south western corner of Second Court, v) replacement glazing to existing window casements in the south west corner of Second Court at ground floor serving existing bar and Junior Combination Room, vi) installation of associated plant and service risers, vii) internal reconfiguration at ground floor only to the existing Junior Combination Room (JCR), TV Room, (back of) F1 and F2 sets associated with toilet provision, and viii) the removal of the lobby at I access and installation of new external doors (to I and K).

    Decided 5 Nov 2020 Heritage and listed buildings

Timeline

Dates from the published record

  1. 7 May 2021

    Received by Cambridge

  2. 24 Jun 2021

    Decision issued: Discharge Condition in Full

  3. 1 Oct 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 20/03217/FUL Granted

    St Johns College St Johns Street Cambridge CB2 1TP

    Demolition of existing buttery dining room and construction of new extension for dining facilities; ii) dismantling and rebuilding of Grade I gate piers to Kitchen Lane; iii) re-grading of existing terrace in Kitchen Lane to provide new external seating; and iv) installation of associated plant.

    Decided 5 Nov 2020 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

  • DECISION NOTICE Application Decision Notice · 24 Jun 2021
  • NATURE CONSERVATION PROJECTS OFFICER Consultee Comments · 08 Jun 2021
  • ENVIRONMENTAL HEALTH Consultee Comments · 07 Jun 2021
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 01 Jun 2021
  • FEE CALCULATION Application Information · 07 May 2021
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 07 May 2021
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 07 May 2021
  • CONDITION 19 - WAGTAIL NEST BOX Application Information · 07 May 2021
  • CONDITION 19 - ECO SMALL BIRD BOX 25 MM AND 32 MM Application Information · 07 May 2021
  • CONDITION 19 - BAT BOX Application Information · 07 May 2021
  • CONDITION 19 - BIRD AND BAT BOX LOCATIONS Drawings · 07 May 2021
  • CONDITION 20 - EXTERNAL LIGHTING LAYOUT Drawings · 07 May 2021
  • CONDITION 20 - EXTERNAL LIGHTING CALCULATIONS Application Information · 07 May 2021
  • CONDITION 20 - PROJECT LUMINAIRE SCHEDULE Application Information · 07 May 2021
  • CONDITION 3 - DUST REPORT Application Survey / Assessment / Statement · 07 May 2021
  • CONDITION 4 - CONSTRUCTION NOISE AND VIBRATION REPORT Application Survey / Assessment / Statement · 07 May 2021
  • COVERING LETTER Application Information · 07 May 2021

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cambridge granted permission on 24 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • St Johns College St Johns Street Cambridge Cambridgeshire CB2 1TP

    20/03218/CONDD Submitted 7 Dec 2022 50 yards away

    Submission of details required by condition 3 (partial discharge) (Window details) of listed building consent 20/03218/LBC

    Granted Conditions Windows or glazing 9 docs
  • St Johns College St Johns Street Cambridge CB2 1TP

    20/03217/FUL Submitted 24 Jul 2020 50 yards away

    Demolition of existing buttery dining room and construction of new extension for dining facilities; ii) dismantling and rebuilding of Grade I gate piers to Kitchen Lane; iii) re-grading of existing terrace in Kitchen Lane to provide new external seating; and iv) installation of associated plant.

    Granted Full applications Extension Demolition 118 docs
  • St Johns College St Johns Street Cambridge CB2 1TP

    20/03218/LBC Submitted 24 Jul 2020 50 yards away

    Demolition of existing buttery dining room and construction of new extension for dining facilities, ii) dismantle and rebuild Grade I Eagle Gate Piers in revised location, iii) creation of new openings in southern elevation of Second Court to provide level access between the new extension and Second Court, iv) internal fabric improvements to floors, walls and ceiling of south western corner of Second Court, v) replacement glazing to existing window casements in the south west corner of Second Court at ground floor serving existing bar and Junior Combination Room, vi) installation of associated plant and service risers, vii) internal reconfiguration at ground floor only to the existing Junior Combination Room (JCR), TV Room, (back of) F1 and F2 sets associated with toilet provision, and viii) the removal of the lobby at I access and installation of new external doors (to I and K).

    Granted Heritage and listed buildings Extension Demolition +1 107 docs
  • St Johns College St Johns Street Cambridge Cambridgeshire CB2 1TP

    22/00224/CONDB Submitted 10 Jan 2023 50 yards away

    Submission of details required by partial discharge of condition 16 (BREEAM - Design Stage Certification) of planning permission 22/00224/S73

    Granted Conditions 8 docs
  • St Johns College St Johns Street Cambridge CB2 1TP

    20/04887/CONDA Submitted 21 May 2021 50 yards away

    Submission of details required by condition 5 (Protection of Bin Brook Bridge) of planning permission 20/04887/LBC

    Granted Conditions 9 docs
  • Merton Court St Johns College St Johns Street Cambridge Cambridgeshire

    24/02345/FUL Submitted 18 Jun 2024 100 yards away

    Installation of a footbridge over Bin Brook. Removal of concrete revetments and re-profiling of the banks. Installation and upgrading of existing pathways and associated landscaping to the brook and the areas on either side.

    Granted Full applications 67 docs

In Cambridge

  • 26/00567/CONDC Granted

    Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT

    Submission of details required by condition 30 (Lighting Scheme) of planning permission 26/00567/S73

    Received 9 Sep, published by the council 12 Sep 2026 Conditions
  • 26/00567/CONDD Granted

    Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT

    Submission of details required by condition 31 (EV Vehicle Charging Point Details) of planning permission 26/00567/S73

    Received 9 Sep, published by the council 12 Sep 2026 Conditions
  • 24/01330/CONDA Split decision

    The Emperor 21 Hills Road Cambridge Cambridgeshire CB2 1NW

    Submission of details required by condition 3 (Trees), 4 (Surface water during construction), 5 (Traffic Management Plan), 6 (demolition/construction noise and vibration impact assessment), 7 (Dust mitigation) and 10 (method statement) of planning permission 24/01330/FUL

    Received 17 Aug, published by the council 27 Aug 2026 Conditions
  • 23/04687/COND70 Awaiting decision

    Barnwell Local Centre Barnwell Road Cambridge Cambridgeshire CB5 8RG

    Submission of details required by condition 70 (Car and Cycle Parking Management Plan) of planning permission 23/04687/FUL - Site 1 only

    Received 6 Oct, published by the council 9 Oct 2026 Conditions
  • 24/01373/CONDA Awaiting decision

    The White House 72 Fen Road Cambridge Cambridgeshire CB4 1UN

    Submission of details required by conditions 3 (Piling), 4 (Bin and Cycle Storage) and 5 (Ecological Lighting Scheme) of planning permission 24/01373/FUL

    Received 6 Oct, published by the council 9 Oct 2026 Conditions