Skip to content
PlanIndex Get alerts
Menu

Planning application

PHS Group Ltd Block B Western Industrial Estate Caerphilly CF83 1XH

Awaiting decision Caerphilly 26/0598/CLPU Certificate Lawful Proposed Use/Dev

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Obtain a Lawful Development Certificate for installation of 140 No. roof-mounted photovoltaic solar panels on the east-, south- and west-facing pitched roof slopes of the existing commercial building, providing a total installed generating capacity of approximately 85.4 kWp, together with associated inverter, mounting system and ancillary electrical infrastructure.

As published by the council, reference 26/0598/CLPU

Application record

Reference
26/0598/CLPU
Type
Certificate Lawful Proposed Use/Dev
Status
Awaiting decision
Received
8 Sep 2026
Validated
8 Sep 2026
Ward
St Martins
Decision by
Delegated
Postcode
CF83 1XH

Timeline

Dates from the published record

  1. 8 Sep 2026

    Received by Caerphilly

  2. 12 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 3 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Caerphilly took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Airis Energy Solutions Ltd Agent, registered in Thornton Cleveleys

Active · incorporated 2017 · Thornton Cleveleys

2 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Caerphilly for determination, against a statutory target of eight weeks. Over the last year Caerphilly decided lawful development applications in a median of 50 days. More in our guide to how long planning decisions take.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Caerphilly

  • 26/0583/CLEU Awaiting decision

    Gavel Holdings Limited Gelligroes Mill Road Pontllanfraith Blackwood NP12 2HY

    Obtain a Certificate of Lawfulness for existing use of Classes B1 (Business), B2 (General Industrial) and B8 (Storage or Distribution).

    3 Sep 2026 Lawful development
  • 26/0582/CLPU Awaiting decision

    41 Blacksmith Close Oakdale Blackwood NP12 0BG

    Obtain a Lawful Development Certificate to erect single-storey rear extension to the existing dwellinghouse

    2 Sep 2026 Lawful development
  • 26/0579/CLPU Awaiting decision

    The Barn Pen Y Caeau Farm Abercarn Mountain Road Hafodyrynys Newport NP11 5AY

    Erect single-storey timber stable block within the existing residential curtilage of the dwelling,

    2 Sep 2026 Lawful development
  • 26/0518/CLPU Granted

    2 Rhyd Y Gwern Lane Draethen Newport NP10 8GH

    Obtain a Lawful Development Certificate to erect a timber boundary fence 2m high to east elevation to include 2m vehicular gates to private right of way, and 2m timber boundary fence to west elevation (reduced to 1m in height 2m set back from highway)

    4 Aug 2026 Lawful development
  • 26/0449/CLEU Granted

    32 Mountain Way Nelson Treharris CF46 6NY

    Obtain a Lawful Development Certificate to establish that the side extension was substantially completed more than 4 years prior to the submission of this application

    2 Jul 2026 Lawful development