Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0358/FULL

Land At And Adjacent To The Former Kautex And Delyn Buildings 3 Alder Avenue Dyffryn Business Park Ystrad Mynach Hengoed CF82 7TW

Awaiting decision Caerphilly Full Application

Proposal

Demolish existing Kautex building and external ancillary structures and redevelop for construction of a municipal transfer station for recyclable waste including office space, refill bays, glass storage, plant and machinery and associated works, refurbish existing Delyn building to provide a vehicle fleet work shop, storage facility and depot including retention of existing office space, reconfiguration of the building, plant and machinery and associated works and construct a car park to support proposed uses and associated works

As published by the council, reference 26/0358/FULL

Timeline

Dates from the published record

  1. 21 May 2026

    Received by Caerphilly

  2. 29 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Caerphilly for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/0204/COND Decided

    Pink Self Storage Ystrad Mynach Unit 11 Coopers Court Caerphilly Road Ystrad Mynach

    Discharge condition 04 (Waste) of planning consent 25/0513/RET (Retain the use as a self-storage facility (Use Class B8 Storage and Distribution))

    23 Mar 2026 465m away Conditions

In Caerphilly

  • 26/0487/COU Awaiting decision

    Newbridge Surgery Ashfield Road Newbridge Newport NP11 4RA

    Change the use from surgery into C2 supported adults/children residential care unit

    23 Jul 2026 Full applications
  • 26/0332/FULL Refused

    Land At Former Royal British Legion Heol Uchaf Rhymney Tredegar NP22 5DN

    Erect 2 No. detached dwellings

    8 May 2026 Full applications
  • 26/0485/FULL Awaiting decision

    Rudry Parish Hall Garth Place To Rhydri Primary School Rudry Caerphilly CF83 3DF

    Erect a pre built timber sauna, timber storage shed and raised composite decking with associated low-impact ground screw foundations, landscaping works and ancillary outdoor wellbeing facilities

    21 Jul 2026 Full applications
  • 26/0482/FULL Awaiting decision

    Oakleaf Recycling Ltd Unit 23 Nine Mile Point Industrial Estate Cwmfelinfach Newport NP11 7HZ

    Increase the operational capacity of the existing Solid Recovered Fuel (SRF) / Refuse Derived Fuel (RDF) production facility from 100,000 tonnes per annum to a maximum of 150,000 tonnes per annum

    20 Jul 2026 Full applications
  • 26/0356/COU Granted

    LB Supplies Ltd Unit G1 Croespenmaen Industrial Estate Croespenmaen Newport NP11 3AG

    Change the use to include D1 (Non-Residential Institutions) and minor adjustments to site and building layout for the provision of nursery services, to include a children's soft play venue

    21 May 2026 Full applications