Planning application
24 Heol Isaf Nelson Treharris CF46 6NS
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Obtain Certificate of Lawful Proposed Development for proposed rear single storey extension
As published by the council, reference 26/0301/CLPU
Application record
- Reference
- 26/0301/CLPU
- Type
- Certificate Lawful Proposed Use/Dev
- Status
- Decided
- Decision
- Granted
- Received
- 22 Apr 2026
- Validated
- 11 May 2026
- Decided
- 2 Jul 2026
- Ward
- Nelson
- Decision by
- Delegated
- Postcode
- CF46 6NS
Timeline
Dates from the published record
-
22 Apr 2026
Received by Caerphilly
-
11 May 2026
Validated
Checked as complete and ready for consideration.
-
2 Jul 2026
Decision issued: Granted
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
- DELEGATED REPORT
- DECISION
- DECISION PLAN
- GREEN INFRASTRUCTURE
- EXISTING PLANS
- PROPOSED PLANS
- SITE LOCATION PLAN
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Caerphilly granted permission on 2 July 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
21 Heol Isaf Nelson Treharris CF46 6NS
Demolish existing rear conservatory and detached garage and construct new single storey rear extension
Granted Householder Extension Demolition 9 docsSmall domestic -
25 Heol Isaf Nelson Treharris CF46 6NS
Erect conservatory to the rear of property
Granted Full applications Extension 8 docs -
11 Heol Isaf Nelson Treharris CF46 6NS
Erect rear extension and new side garage
Granted Householder Extension 6 docsDomestic -
6 Heol Isaf Nelson Treharris CF46 6NS
Erect rear roof extension, raise the ridge and rear dormer
Granted Householder Extension Loft or dormer +1 10 docsDomestic -
21 Beech Tree Way Nelson Treharris CF46 6NU
Carry out various tree works (Tree Preservation Order 48/82/RVDC)
Granted Trees 5 docs -
1 Mountain Way Nelson Treharris CF46 6NY
Remove dead wood from tree overhanging from T4 (Tree Preservation Order 48/82/RVDC)
Granted Trees 7 docs
Other lawful development applications
In Caerphilly
-
26/0548/CLEU Granted
9 St David's Park New Tredegar NP24 6BJ
Obtain a Lawful Development Certificate for existing use of the land as garden area associated with No. 9 St Davids Park
-
26/0635/CLEU Awaiting decision
Ambulance Hall Tredegar Terrace Risca Newport NP11 6BY
Obtain a Lawful Development Certificate for existing use of the whole premises as a non-residential hall for community, meeting, educational and training purposes, falling within Class D1
-
26/0517/CLPU Refused
26 Heolddu Crescent Bargoed CF81 8UQ
Obtain a Lawful Development Certificate for the proposed use of one of the existing ground floor rooms as a small-scale home-based tattoo business
-
26/0611/CLPU Awaiting decision
24 Heol Cwarrel Clark Caerphilly CF83 2NE
Obtain a Lawful Development Certificate for conversion of the existing integral garage into habitable accommodation, replacement of the garage door with a window, associated internal alterations and installation of a compact through-floor lift
-
26/0598/CLPU Awaiting decision
PHS Group Ltd Block B Western Industrial Estate Caerphilly CF83 1XH
Obtain a Lawful Development Certificate for installation of 140 No. roof-mounted photovoltaic solar panels on the east-, south- and west-facing pitched roof slopes of the existing commercial building, providing a total installed generating capacity of approximately 85.4 kWp, together with associated inverter, mounting system and ancillary electrical infrastructure