Planning application
40 Pinewood Green Iver Heath Buckinghamshire SL0 0QG
Works: Extension Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Householder application for the construction of part single, part two storey rear extension
As published by the council, reference PL/26/08493/FA
Application record
- Reference
- PL/26/08493/FA
- Status
- Registered
- Validated
- 20 Oct 2026
- Postcode
- SL0 0QG
Site history
Applications at this address on the Buckinghamshire register
This site has had 4 applications since 2025: 2 approved, 1 refused.
-
PL/26/00327/PNE Granted
40 Pinewood Green Iver Heath Buckinghamshire SL0 0QG
Notification under The Town and Country Planning (General Permitted Development) Order 2015, Part 1 of Schedule 2 Class A for: single storey rear extension (depth extending from the original rear wall of 6.00 metres, maximum height 3.00 metres, eaves height 2.8 metres).
-
PL/25/5353/PNE Refused
40 Pinewood Green Iver Heath Buckinghamshire SL0 0QG
The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 6m for which the maximum height would be 3m and for which the height of the eaves would be maximum 2.80m
-
PL/25/5354/FA Granted
40 Pinewood Green Iver Heath Buckinghamshire SL0 0QG
Loft conversion into habitable accommodation incorporating three front rooflights and a rear dormer.
Timeline
Dates from the published record
-
20 Oct 2026
Validated
Checked as complete and ready for consideration.
-
30 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Buckinghamshire took a median of 60 days over the applications it decided in the last year.
What happens while it is decided
This application is with Buckinghamshire for determination, against a statutory target of eight weeks. Over the last year Buckinghamshire's median decision took 60 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Buckinghamshire's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
40 Pinewood Green Iver Heath Buckinghamshire SL0 0QG
Notification under The Town and Country Planning (General Permitted Development) Order 2015, Part 1 of Schedule 2 Class A for: single storey rear extension (depth extending from the original rear wall of 6.00 metres, maximum height 3.00 metres, eaves height 2.8 metres).
Granted Extension 7 docsSmall domestic -
40 Pinewood Green Iver Heath Buckinghamshire SL0 0QG
The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 6m for which the maximum height would be 3m and for which the height of the eaves would be maximum 2.80m
Refused Extension 6 docsSmall domestic -
40 Pinewood Green Iver Heath Buckinghamshire SL0 0QG
Loft conversion into habitable accommodation incorporating three front rooflights and a rear dormer.
Granted Full applications Loft or dormer 7 docs -
Karibu 22 Cedar Close Iver Heath Buckinghamshire SL0 0QX
T1 - Scots Pine - Fell. (TPO/SBDC/1989/05)
Granted Trees 4 docs -
70 Pinewood Green Iver Heath Buckinghamshire SL0 0QH
Part two storey / part single storey side/rear extension with gable end roof
Granted Full applications Extension 5 docsSmall domestic -
78 Pinewood Green Iver Heath Buckinghamshire SL0 0QH
Certificate of lawfulness for the proposed conversion of roof space to habitable use.
Granted Lawful development 4 docs