Planning application
Edon Park 1 Blind Lane Bourne End Buckinghamshire SL8 5LF
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of a 135.45 kWp ground-mounted solar photovoltaic array comprising 210 solar panels, together with associated inverter and 220 kWh battery energy storage equipment within an ancillary building and associated works (Part retrospective).
As published by the council, reference PL/26/07741/FA
Application record
- Reference
- PL/26/07741/FA
- Status
- Registered
- Validated
- 19 Oct 2026
- Postcode
- SL8 5LF
Timeline
Dates from the published record
-
19 Oct 2026
Validated
Checked as complete and ready for consideration.
-
19 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Buckinghamshire took a median of 60 days over the applications it decided in the last year.
What happens while it is decided
This application is with Buckinghamshire for determination, against a statutory target of eight weeks. Over the last year Buckinghamshire's median decision took 60 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Buckinghamshire's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Midhurst Blind Lane Bourne End Buckinghamshire SL8 5LF
89% historically approved · decision due ~13 Oct
Approval of condition 3 (materials) of planning permission 18/05606/FUL - Demolition of existing bungalow and erection of part single/part two storey 4-bed detached dwelling with erection of gates between existing piers and rendering to existing detached garage
Awaiting decision Conditions New dwelling Demolition 1 docDomestic -
Blind Lane Bourne End Buckinghamshire
Development under the town and country planning general development order 2015 schedule 2 part 15 class B (a) - installation of a new ground mounted transformer (substation)
Granted 7 docs -
Walpoles Blind Lane Bourne End Buckinghamshire SL8 5LF
Reduce back to the previous pruning points by approx 3m off height and width to let more light into the pool area x 3 Birch, x 5 Norway Maple, x 3 Austrian Pine, x 1 Scots Pine, x 2 Sycamore and x 1 Beech (G1), reduce by approx 2-3m in height and width to clear from the property x 1 Birch (T1) and fell due to dieback and high target area x 1 Ash (T2)
Granted Trees 3 docs -
April Lodge 4 Edgar Wallace Place Bourne End Buckinghamshire SL8 5LG
85% historically approved · decision due ~7 Sep
Maple (ID# T2) Prune - Reduce the height of the tree to previous points by around 6-7 metres. Beech (ID# T3) Prune - Reduce the height and spread on the garden side by 2.5-3.5 metres. Reduction is recommended to manage the trees size and shape for its location being close to the neighbouring property.
Decided Trees 2 docs -
13 Telston Close Bourne End Buckinghamshire SL8 5TY
Garage conversion with first floor extension above, internal alterations and fenestration changes.
Granted Full applications Extension Windows or glazing 13 docs -
Kershaw Northern Heights Bourne End Buckinghamshire SL8 5LE
Works in accordance with a submitted schedule for maintenance
Granted Trees 4 docs