Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Stables Court Marlow Buckinghamshire SL7 2JD

Awaiting decision Buckinghamshire PL/26/06779/TP

Works: Trees

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

T1 Oak - Reduce the tree by 2-2.5m from branch tips to bring the tree back into scale, mitigate against limb loss and improve light ingress. This will leave a canopy spread of approximately 17-18m. Also remove trunk epicormic up to crown break. T2 Oak - reduced 3 over-extended limbs by 1.5 - 2m to mitigate the tip loading and the risk of failure either at the branch union or on the stems where the woodpecker holes are and reduce the side away from the house by 2-2.5m to balance the crown and mitigate against further branch loss onto the footpath. To leave a canopy spread of approximately 10-12m. T3 Beech- Reduce sections closest to the house to give approximately 2.5m clearance from the roof to mitigate against abrasion and squirrel ingress and egress. The actual spread of the canopy will be unaltered because the nature of the pruning. No pruning cuts to be larger than 75mm in diameter.

As published by the council, reference PL/26/06779/TP

Application record

Reference
PL/26/06779/TP
Status
Registered
Validated
21 Aug 2026
Postcode
SL7 2JD

Timeline

Dates from the published record

  1. 21 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  2. 5 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Buckinghamshire took a median of 58 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Buckinghamshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Buckinghamshire is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • The Walled Garden 1 Nursery Walk Marlow Buckinghamshire SL7 2LL

    PL/25/4485/TP Submitted 17 Nov 2025 83m away

    Full canopy reduction by 2 metres and a 20% thin as tree has also become very crowded and to allow light into the canopy x 1 Norway Maple (T12)

    Decided Trees 3 docs
  • 16 Spinfield Mount Marlow Buckinghamshire SL7 2JU

    PL/26/05880/FA Submitted 22 Jul 2026 132m away

    80% historically approved · decision due ~16 Sep

    Construction of ground and first floor front extensions, the demolition of an existing conservatory and the construction of a replacement ground floor rear extension, timber boarding to the front dormers and gable ends, alterations to the fenestration and a detached outbuilding.

    Awaiting decision Extension Loft or dormer +2
  • 23 Spinfield Lane Marlow Buckinghamshire SL7 2JT

    25/06660/CLP Submitted 15 Jul 2025 230m away

    Certificate of lawfulness for proposed construction of a pre-fabricated timber garden room building on a hard standing base in the rear garden

    Granted Lawful development 7 docs
  • 10 Spinfield Park Marlow Buckinghamshire SL7 2DD

    PL/25/4658/FA Submitted 16 Oct 2025 238m away

    Demolition of existing rear conservatory and erection of single storey rear extensions.

    Decided Full applications Extension Demolition 11 docs
    Small domestic
  • 13 Spinfield Park Marlow Buckinghamshire SL7 2DD

    PL/26/06139/TP Submitted 25 Aug 2026 246m away

    80% historically approved · decision due ~20 Oct

    Reduction of sycamore by 3.8m to provide more light and in line with good arboricultural practice.

    Awaiting decision 6 docs
  • 1 Spinfield Park Marlow Buckinghamshire SL7 2DD

    PL/26/05383/FA Submitted 3 Jul 2026 246m away

    80% historically approved · decision due ~28 Aug

    Two storey front extension, single storey rear extension, rear first floor extension, enlargement of front and rear dormers

    Awaiting decision Extension Loft or dormer
    Small domestic