Skip to content
PlanIndex Get alerts
Menu

Planning application

Gables Jordans Way Jordans Buckinghamshire HP9 2SP

Awaiting decision Buckinghamshire PL/26/06299/FA

Works: New dwelling Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing dwelling and erection of replacement detached dwelling

As published by the council, reference PL/26/06299/FA

Application record

Reference
PL/26/06299/FA
Status
Registered
Validated
5 Aug 2026
Postcode
HP9 2SP

Timeline

Dates from the published record

  1. 5 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  2. 19 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Buckinghamshire took a median of 58 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Buckinghamshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Buckinghamshire is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • Fieldgate Jordans Way Jordans Buckinghamshire HP9 2SP

    PL/26/06303/FA Submitted 6 Aug 2026 100m away

    81% historically approved · decision due ~1 Oct

    Demolition of existing dwelling and erection of replacement detached self-build dwelling.

    Awaiting decision Full applications New dwelling Demolition 19 docs
    Domestic
  • Glenthorne 2 Jordans Way Jordans Buckinghamshire HP9 2SP

    PL/26/05598/FA Submitted 23 Jul 2026 183m away

    81% historically approved · decision due ~17 Sep

    Construction of a single-storey outbuilding within the rear curtilage of 2 Jordans Way

    Awaiting decision Full applications
    Small domestic
  • Churston House 12 Long Wood Drive Jordans Buckinghamshire HP9 2SS

    PL/25/5573/EU Submitted 7 Jan 2026 218m away

    Certificate of lawfulness for existing single storey rear extension of approximately 6.8 sqm to enlarge existing utility room.

    Granted Lawful development Extension 8 docs
    Small domestic
  • Woodside House Jordans Lane Jordans Buckinghamshire HP9 2SW

    PL/25/2383/FA Submitted 24 Jul 2025 300m away

    Proposed single storey flat roof rear extension incorporating roof lantern and external flue.

    Granted Full applications Extension Windows or glazing 15 docs
    Small domestic
  • Pippins Crutches Lane Jordans Buckinghamshire HP9 2TG

    PL/25/6603/FA Submitted 19 Dec 2025 397m away

    Two-storey side extension, single-storey rear extensions, porch extension, reconfiguration works and changes to external fenestration.

    Granted Full applications Extension Windows or glazing 17 docs
    Small domestic
  • Linden Cottage 1 Green East Road Jordans Buckinghamshire HP9 2SU

    PL/25/5281/KA Submitted 5 Nov 2025 440m away

    T1 Oak - Crown Reduction - Reducing the height and spread of the tree by up to 2 metres. G2 Eucalyptus x - Fell to ground level and grind out stumps. T3 Olive - Crown Reduction - Reducing the height and spread of the tree by up to 400mm. (Jordans Conservation Area)

    Decided Trees 6 docs