Planning application
Land Off Lee Road Quainton Buckinghamshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of 37 dwellings with associated works including access arrangements and landscaping
As published by the council, reference PL/25/4672/FA
Application record
- Reference
- PL/25/4672/FA
- Type
- Full Application
- Status
- Registered
- Received
- 16 Oct 2025
- Validated
- 16 Oct 2025
- Ward
- Quainton
- Parish
- Quainton
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
16 Oct 2025
Received by Buckinghamshire
-
10 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Buckinghamshire took a median of 58 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Milton Keynes
172 applications on PlanIndex · across 34 councils · 78% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
83 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Buckinghamshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
20 North End Road Quainton Buckinghamshire HP22 4BD
Householder application for replacement of existing conservatory with single storey side and rear extension with external steps. Removal of redundant modern brick chimney for oil boiler. Installation of solar panels on detached garage roof. Widening and re-laying of driveway. Retrospective approval for the addition of two rooflights to the south elevation.
Granted Full applications Extension Loft or dormer 18 docsSmall domestic -
20 North End Road Quainton Buckinghamshire HP22 4BD
Listed building application for replacement of existing conservatory with single storey side and rear extension. Internal alterations. Removal of redundant modern brick chimney for oil boiler. Installation of solar panels on detached garage roof. Retrospective approval for the addition of two rooflights to the south elevation.
Granted Heritage and listed buildings Extension Loft or dormer 17 docsSmall domestic -
High Trees House North End Road Quainton Buckinghamshire HP22 4BD
Conversion of garage to habitable space and introduction of new gate to site entrance
Granted Full applications 15 docs -
Townsend Farm Townsend Quainton Buckinghamshire HP22 4BB
82% historically approved · decision due ~14 Sep
Norwegian Maple - Prune - 2m will be taken off the tree which is 6m high.
Awaiting decision Trees 2 docs -
1 Lee Road Quainton Buckinghamshire HP22 4BH
Demolition of existing single storey side extension, construction of part single, part two storey side and rear extensions. Construction of front porch shelter and rear juliet balcony. Alterations to fenestrations.
Granted Full applications Extension Demolition 7 docsSmall domestic -
31 Cautley Close Quainton Buckinghamshire HP22 4BN
Demolition of existing garage and rear glazed extension and erection of single storey front and side extensions.
Granted Full applications Extension Demolition +1 5 docsSmall domestic
Other full applications applications
In Buckinghamshire
-
PL/26/06317/FA Awaiting decision
Valley View Barn Winchbottom Lane Little Marlow Buckinghamshire HP10 9QF
Erection of stables, fence and gate
-
PL/25/3476/FA Granted
The Dairy Glebe Farm Heath End Hawridge Buckinghamshire HP4 3UE
Change of use and conversion of attached stables and barn to residential use including partial demolition of existing barn together with the insertion of rooflights and associated fenestration alterations.
-
PL/26/01565/FA Granted
Redpitch Park Holtspur Lane Wooburn Green Buckinghamshire
Siting of an additional mobile home within an existing mobile home park
-
PL/26/01566/FA Granted
Manor Farm Town Lane Wooburn Green Buckinghamshire HP10 0DQ
Relocation of an existing mobile home plot
-
PL/25/3662/FA Refused
10, 11 and 13 Castle Place High Wycombe Buckinghamshire HP13 6RX
Alterations to existing building to form a 3-storey building together with accommodation in roofspace to facilitate the creation of 5 no. additional flats, comprising the construction of an additional storey, 3-storey rear extension, new roof with front, side and rear dormers and rooflights, fenestration alterations, additional first-floor flank windows and internal alterations to 2 no. existing flats and 3 no. existing commercial units and associated proposed bike and bin stores.