Skip to content
PlanIndex Get alerts
Menu

Planning application

42 OAKWOOD AVENUE, BECKENHAM, BR3 6PJ

Awaiting decision Bromley 26/03435/HPA Householder planning permission

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing conservatory. Construction of a single storey rear extension with 2x light lanterns. Conversion of existing garage into habitable space with elevational alterations.

As published by the council, reference 26/03435/HPA

Application record

Reference
26/03435/HPA
Type
Householder planning permission
Status
Valid
Received
1 Sep 2026
Validated
1 Sep 2026
Ward
Beckenham Town & Copers Cope
Decision by
Delegated Decision
Postcode
BR3 6PJ

Comment by 23 September 2026

The council is taking comments on this application until then. Comments go to Bromley through their own planning portal.

Timeline

Dates from the published record

  1. 1 Sep 2026

    Received by Bromley

  2. 4 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bromley took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Bromley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About householder applications

How this application type works

Householder applications cover work to an existing house and its garden: extensions, loft and garage conversions, porches, outbuildings and similar alterations within the boundary of the home. They cannot be used to create a separate dwelling or change what the building is used for. Councils aim to decide them within eight weeks, and immediate neighbours are usually notified and given a chance to comment.

More on householder applications in our guide

Nearby applications

Within 500 metres

  • 34 OAKWOOD AVENUE, BECKENHAM, BR3 6PJ

    26/02531/TPO Submitted 22 Jun 2026 0m away

    94% historically approved · decision due ~17 Aug

    Silver Birch tree - Remove. SUBJECT TO TPO 1330 (25.11.1996)

    Awaiting decision Trees 1 doc
  • 19 OAKWOOD AVENUE, BECKENHAM, BR3 6PT

    25/05750/LDC Submitted 16 Dec 2025 72m away

    Removal of rear garden sheds. Proposed single storey out building to rear of garden for ancillary use of main house. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)

    Decided Lawful development 5 docs
    Small domestic
  • 71 OAKWOOD AVENUE, BECKENHAM, BR3 6PT

    26/02383/TPO Submitted 12 Jun 2026 72m away

    94% historically approved · decision due ~7 Aug

    Ground works and associated fibrous root pruning of T3 (Oak) to install a root barrier 25m in length and 3.5m in depth. SUBJECT TO TPO 2897 (14.9.2023)

    Awaiting decision Trees 6 docs
  • 73 OAKWOOD AVENUE, BECKENHAM, BR3 6PT

    26/02772/TPO Submitted 8 Jul 2026 72m away

    94% historically approved · decision due ~9 Sep

    T1 Oak - Reduce the north-west side of the canopy by 2-3m. Reduce the west side of the canopy by 2m and bring in over extended lateral branches where necessary to balance the crown. Remove significant dead wood and reduce the declining central leader back to live wood. SUBJECT TO TPO 2897 (14.9.2023)

    Awaiting decision Trees 7 docs
  • 73 OAKWOOD AVENUE, BECKENHAM, BR3 6PT

    25/05361/TPO Submitted 18 Nov 2025 72m away

    T3 Oak - Fell and treat stump with eco-plugs. SUBJECT TO TPO 2897 (14.9.2023)

    Refused Trees 11 docs
  • 19 OAKWOOD AVENUE, BECKENHAM, BR3 6PT

    26/02200/HPA Submitted 2 Jun 2026 72m away

    Two-storey front, side and rear extensions; single-storey front and rear extensions; roof uplift and loft conversion including front gable, side and rear dormers; together with internal and elevational alterations.

    Granted Householder Extension Loft or dormer 10 docs
    Small domestic

In Bromley

  • 26/02192/HPA Granted

    Foxwood House, Norsted Lane, Pratts Bottom, Orpington, BR6 7PQ

    Erection of a single-storey outbuilding to rear garden for incidental use as a home gym, with associated hardstanding, landscaping and drainage works.

    1 Jun 2026 Householder
  • 26/02752/HPA Granted

    5 EMBER CLOSE, PETTS WOOD, ORPINGTON, BR5 1AP

    Part one/two storey side and rear extension incorporating garage/store and elevational alterations

    8 Jul 2026 Householder
  • 26/02702/HPA Granted

    16 OAKFIELD GARDENS, BECKENHAM, BR3 3AZ

    Retention of a Hip to Gable rear roof dormer extension with the addition of two roof lights to the front roof slope.

    3 Jul 2026 Householder
  • 26/02663/HPA Granted

    72 SUNDRIDGE AVENUE, BROMLEY, CHISLEHURST, BR7 5LU

    Raised decking area with planters, steps and single storey garden room at rear

    2 Jul 2026 Householder
  • 26/02482/HPA Granted

    CHESTNUTS, 15B SANDY RIDGE, CHISLEHURST, BR7 5DP

    Loft conversion comprising front and rear dormers and rooflights to front.

    19 Jun 2026 Householder