Planning application
19 HADDON ROAD, ORPINGTON, BR5 4BU
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a two storey 2 bedroom 4 person dwellinghouse with associated bin and bicycle store, and removal of existing garage on the land rear of 19 Haddon Road, Orpington BR5 4BU.
As published by the council, reference 26/03085/FPA
Application record
- Reference
- 26/03085/FPA
- Type
- Full planning permission
- Status
- Valid
- Received
- 31 Jul 2026
- Validated
- 11 Aug 2026
- Ward
- St Mary Cray
- Decision by
- Delegated Decision
- Postcode
- BR5 4BU
Timeline
Dates from the published record
-
31 Jul 2026
Received by Bromley
-
11 Aug 2026
Validated
Checked as complete and ready for consideration.
-
16 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Bromley took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Bromley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
5 OKEMORE GARDENS, ORPINGTON, BR5 3PJ
Demolition of existing conservatory construction of a single storey wrap around extension
Granted Householder Extension Demolition 9 docsSmall domestic -
36 Burrfield Drive, Orpington, BR5 4BY
Erection of detached two storey 2 bedroom dwelling on land associated with 36 Burrfield Drive, with alterations to boundary fencing, new dropped kerbs and driveways
Refused Full applications 24 docsDomestic -
3 MANNING ROAD, ORPINGTON, BR5 4DD
Single storey rear extension, extending beyond the rear wall of the original house by 3.50m, for which the maximum height would be 3.25m, and for which the height of the eaves would be 2.95m (42 Day Notification for Householder Permitted Development Prior Approval)
Granted Prior approval Extension 11 docsSmall domestic -
Spring Lodge , Elizabeth Way, Orpington , BR5 4BH
Details submitted to comply with the requirements of the following conditions relating to planning permission 25/03289/FPA: Condition 7 - desk based archaeological assessment has been submitted to and approved.
Decided Conditions 4 docs -
SPRING LODGE, ELIZABETH WAY, ORPINGTON, BR5 4BH
80% historically approved · decision due ~12 Oct
Details submitted to comply with the requirements of the following conditions relating to planning permission 25/03289/FPA: Condition 3 - Construction and Environmental Management Plan Condition 4 - Site Accommodation Lighting Scheme Condition 6 - No construction shall take place within 5m of the water main.
Awaiting decision Conditions 8 docs -
SPRING LODGE , Elizabeth Way, Orpington , BR5 4BH
80% historically approved · decision due ~8 Sep
Details submitted to comply with the requirements of the following conditions relating to planning permission 25/03289/FPA: Condition 5 - Piling Impact Method Statement
Awaiting decision Conditions 2 docs
Other full applications applications
In Bromley
-
26/02774/FPA Granted
BABINGTON HOUSE SCHOOL, GRANGE DRIVE, CHISLEHURST, BR7 5ES
Demolition of canopy. Erection of canopy and associated tree works.
-
26/03420/FPA Awaiting decision
FLAT 2, GREAT ASH, LUBBOCK ROAD, CHISLEHURST, BR7 5JZ
Replacement of three windows and a french door to the rear elevations and replacement of one window to the front elevation, including the enlargement of one rear window opening.
-
26/02406/FPA Refused
THE CROFT, MOTTINGHAM LANE, MOTTINGHAM, LONDON, SE9 4RX
Demolition of the existing dwelling and construction of a four-storey detached 8-bedroom dwelling, including basement accommodation, integral garage, air source heat pump, photovoltaic panels, and associated hard and soft landscaping
-
26/01497/FPA Granted
GRAYLINS FARM, JACKASS LANE, KESTON, BR2 6AN
Demolition of existing 3 bedroom dwellinghouse (The Barn) established under Lawful Development Certificate ref. 25/00673/ELUD, removal of static caravan and caravan, formation of enlarged curtilage associated with proposed dwelling, with erection of replacement single storey dwellinghouse with covered car port, outside shed/logstore and associated boundary fencing and gates, with hard and soft landscaping and air source heat pumps. AMENDED/CORRECTED SITE PLAN
-
26/02692/FPA Granted
132 CROYDON ROAD, PENGE, LONDON, SE20 7YZ
Replacement of all existing old uPVC windows to all elevations and all flats with double glazed white coloured new uPVC windows of sliding sash styles to front elevation and top hung over top hung styles to rear and side elevations and replacement of old uPVC rear garden door with new uPVC double glazed garden door.