Details of reserved matters (access, appearance, landscape, scale and layout) for Site H, Phase 2a of the Crystal Palace Park regeneration development, pursuant to Condition 1 of outline planning permission 20/00325/OUT, for the construction of a vehicular access ramp and installation of access gates at the Old Cople Lane entrance to Crystal Palace Park. (CONSULTATION BY SOUTHWARK COUNCIL)

As published by the council, reference 26/03066/ADJ

Timeline

Dates from the published record

  1. 23 Jul 2026

    Received by Bromley

  2. 2 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Bromley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 20/00325/CON13 Awaiting decision

    CRYSTAL PALACE PARK, THICKET ROAD, PENGE, LONDON, SE20 8DT

    Details submitted to comply with the requirements of the following condition relating to planning permission ref. 20/00325/OUT (as amended under 23/00325/AMD5 and 23/00325/AMD6): Condition 19 (part a)- Pedestrian and Cycle Strategy (related to the Rockhills and Sydenham Villas sites only) Condition 20 (part i)- Parking Design and Management Plan (related to the Rockhills and Sydenham Villas sites only) Condition 21 (part i-iii)- Landscape and Ecology Management Plan (related to the Rockhills and Sydenham Villas sites only) Condition 34 - St Johns Ambulance Accommodation and Ancillary Facilities

    17 Dec 2025 0m away Conditions
  • 20/00325/CON12 Awaiting decision

    CRYSTAL PALACE PARK, THICKET ROAD, PENGE, LONDON, SE20 8DT

    Details submitted to comply with the requirements of the following condition relating to planning permission ref. 20/00325/OUT (as amended under 23/00325/AMD5 and 23/00325/AMD6): Condition 6 (part a-c)- Ecology Surveys Condition 22 (part a)- Land Contamination Condition 23 (part i) - Written Scheme of Investigation Condition 28 - Updated Energy Statement Condition 29 (part a-c)- Flood Risk Assessment and SUDs Condition 37 - Circular Economy

    2 Dec 2025 0m away Conditions
  • 20/00325/CON11 Awaiting decision

    CRYSTAL PALACE PARK, THICKET ROAD, PENGE, LONDON, SE20 8DT

    Details submitted to comply with the requirements of the following condition relating to planning permission ref. 20/00325/OUT (as amended under 23/00325/AMD5 and 23/00325/AMD6): Condition 8 - Phasing Plan (Phases 2A (Rockhills) and 2B (Sydenham Villas)) Condition 11 - Affordable Housing Statement Condition 14 - Viability Statement Condition 35 - Employment and Training Condition 36 - Victorian Wall Dismantling/Rebuilding Method Condition 45 - Residential Travel Plan Condition 46 - Non-Residential Travel Plan

    1 Dec 2025 0m away Conditions
  • 24/00478/AMD1 Awaiting decision

    CRYSTAL PALACE PARK, THICKET ROAD, PENGE, LONDON, SE20 8DT

    Non-material amendment application under S96a of the Town and Country Planning Act 1990 in connection to planning reference 24/00478/DET dated 27.06.2024 to amend drainage

    22 May 2026 0m away Amendments
  • 20/00325/CON19 Awaiting decision

    CRYSTAL PALACE PARK, THICKET ROAD, PENGE, LONDON, SE20 8DT

    Details submitted to comply with the requirements of the following conditions relating to planning permission 20/00325/OUT: Condition 22 - Contaminated Land Assessment, Remedial Strategy and Timetable of works Condition 26 - Details of all Tree Protection Monitoring (Phase 1A only) Condition 57 - Postconstruction Monitoring Report Condition 59 - Whole Life Carbon - Post-Construction Assessment

    12 Jun 2026 0m away Conditions
  • 20/00325/CON18 Decided

    CRYSTAL PALACE PARK, THICKET ROAD, PENGE, LONDON, SE20 8DT

    Details submitted to comply with the requirements of the following conditions relating to planning permission 20/00325/OUT: Condition 54 - Delivery and Servicing Plan (Phase 1A only)

    20 May 2026 0m away Conditions

In Bromley

  • 26/02931/OUT Awaiting decision

    REAR OF 3, CHURCH ROAD, FARNBOROUGH, ORPINGTON, BR6 7DB

    Demolition of existing timber storage building and erection of Office Building (Class E) OUTLINE APPLICATION

    20 Jul 2026 Outline
  • 26/02508/EIA Decided

    CHARMWOOD FARM, CHARMWOOD LANE, ORPINGTON, BR6 7SA

    Screening Opinion pursuant to the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (the 'EIA Regulations') for a Data Centre

    19 Jun 2026 Outline
  • 26/02748/ADJ Granted

    Heights Stables Westerham Hill, Westerham, TN16 2ED

    Under reference 26/00327/CONVAR from Sevenoaks District Council for Variation of Condition 4 (Biodiversity Gain Plan and Biodiversity Management and Monitoring) of planning permission 24/01806/FUL for an amendment to remove pond and strategic site consolidation. (CONSULTATION BY SEVENOAKS DISTRICT COUNCIL)

    1 Jul 2026 Outline
  • 26/02796/PIP Awaiting decision

    SPINDRIFT, THE DRIFT, BROMLEY, BR2 8HL

    Permission in Principle for the for the construction of one dwelling (minimum) and two dwellings (maximum) and highway access under Part 2A of the Town and Country Planning (Permission in Principle) (Amendment) Order 2017.

    6 Jul 2026 Outline
  • 26/02296/ADJ Decided

    FOXGROVE GOLF CLUB BECKENHAM PLACE PARK, BECKENHAM, BR3 5DE

    The construction of a single storey outdoor structure at the side, together with the installation of replacement double glazed windows in all elevation, installation of a kitchen extractor and construction of a front patio and all associated works for use as a restaurant at Foxgrove Golf Club, Beckenham Place Park BR3. (CONSULTATION BY LONDON BOROUGH OF LEWISHAM)

    4 Jun 2026 Outline