Skip to content
PlanIndex Get alerts
Menu

Planning application

PUMP HOUSE CLOSE, BECKENHAM, BR2 0LA

Awaiting decision Bromley 26/02676/FPA Full planning permission

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposal to change windows and doors to timber effect PVCu to units 7-17 Pump House

As published by the council, reference 26/02676/FPA

Application record

Reference
26/02676/FPA
Type
Full planning permission
Status
Valid
Received
2 Jul 2026
Validated
3 Aug 2026
Ward
Shortlands & Park Langley
Decision by
Delegated Decision
Postcode
BR2 0LA

Timeline

Dates from the published record

  1. 2 Jul 2026

    Received by Bromley

  2. 3 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bromley took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Bromley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • PUMP HOUSE CLOSE, BECKENHAM, BR2 0LA

    26/02719/LBC Submitted 2 Jul 2026 0m away

    80% historically approved · decision due ~28 Sep

    PROPOSAL TO CHANGE WINDOWS AND DOORS TO TIMBER EFFECT PVCu TO UNITS 7-17 ON NEW BUILD ELEMENT OF DEVEVELOPMENT

    Awaiting decision Heritage and listed buildings New dwelling Windows or glazing 16 docs
  • Pantiles, Kingswood Road, Shortlands, Bromley, BR2 0HG

    21/02695/FULL6 Submitted 27 May 2021 166m away

    Loft conversion incorporating hip to gable extension to the rear, dormer to the side and rooflights to side roofslopes.

    Granted Householder Extension Loft or dormer 15 docs
    Domestic
  • 17 MARTINS ROAD, BROMLEY, BR2 0EE

    26/02235/HPA Submitted 3 Jun 2026 196m away

    Removal of rear decking and alteration to existing rear extension roof, erection of single storey rear extension, loft conversion with rear L-shaped dormer, Juliet balcony and front rooflights.

    Refused Householder Extension Loft or dormer 11 docs
    Small domestic
  • 7 Valley Road, Shortlands, Bromley, BR2 0HB

    24/03572/FULL6 Submitted 24 Sep 2024 204m away

    Two storey side and part one/two storey rear extension to incorporate enlargement of roof space with side dormers, Juliet balcony to rear, rooflights and elevational alterations.

    Refused Householder Extension Loft or dormer 27 docs
    Domestic
  • 41 VALLEY ROAD, SHORTLANDS, BROMLEY, BR2 0HB

    25/05561/HPA Submitted 2 Dec 2025 204m away

    Construction of front boundary wall/trellis and gate.

    Refused Householder 18 docs
    Small domestic
  • 15 QUEENS MEAD ROAD, BROMLEY, BR2 0ER

    25/04565/TCA Submitted 29 Sep 2025 209m away

    T1 Copper Leaf Beech tree in rear garden (Fagus sylvatica) - Crown reduce by approximately 2-3m to create a healthier all-round shape. Remove all waste leaving the site clean and tidy.

    Granted Trees 4 docs

In Bromley

  • 26/02774/FPA Granted

    BABINGTON HOUSE SCHOOL, GRANGE DRIVE, CHISLEHURST, BR7 5ES

    Demolition of canopy. Erection of canopy and associated tree works.

    8 Jul 2026 Full applications
  • 26/03420/FPA Awaiting decision

    FLAT 2, GREAT ASH, LUBBOCK ROAD, CHISLEHURST, BR7 5JZ

    Replacement of three windows and a french door to the rear elevations and replacement of one window to the front elevation, including the enlargement of one rear window opening.

    1 Sep 2026 Full applications
  • 26/02406/FPA Refused

    THE CROFT, MOTTINGHAM LANE, MOTTINGHAM, LONDON, SE9 4RX

    Demolition of the existing dwelling and construction of a four-storey detached 8-bedroom dwelling, including basement accommodation, integral garage, air source heat pump, photovoltaic panels, and associated hard and soft landscaping

    15 Jun 2026 Full applications
  • 26/01497/FPA Granted

    GRAYLINS FARM, JACKASS LANE, KESTON, BR2 6AN

    Demolition of existing 3 bedroom dwellinghouse (The Barn) established under Lawful Development Certificate ref. 25/00673/ELUD, removal of static caravan and caravan, formation of enlarged curtilage associated with proposed dwelling, with erection of replacement single storey dwellinghouse with covered car port, outside shed/logstore and associated boundary fencing and gates, with hard and soft landscaping and air source heat pumps. AMENDED/CORRECTED SITE PLAN

    16 Apr 2026 Full applications
  • 26/02692/FPA Granted

    132 CROYDON ROAD, PENGE, LONDON, SE20 7YZ

    Replacement of all existing old uPVC windows to all elevations and all flats with double glazed white coloured new uPVC windows of sliding sash styles to front elevation and top hung over top hung styles to rear and side elevations and replacement of old uPVC rear garden door with new uPVC double glazed garden door.

    3 Jul 2026 Full applications