Skip to content
PlanIndex Get alerts
Menu

Planning application

26/02492/FPA

25 PARK END, BROMLEY, BR1 4AN

Awaiting decision Bromley Full planning permission

Proposal

Demolition of existing garage and single storey side extension, erection of part one/two storey rear extension, roof and elevational alterations, construction of new adjoining 2 storey 2-bed dwellinghouse with associated bin and cycle storage. Installation of PV solar panels on both roofs.

As published by the council, reference 26/02492/FPA

Timeline

Dates from the published record

  1. 19 Jun 2026

    Received by Bromley

  2. 16 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Bromley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/02589/LDC Awaiting decision

    59 PARK END, BROMLEY, BR1 4AN

    Loft conversion comprising rear dormer and rooflights to front. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)

    26 Jun 2026 0m away Lawful development
  • 26/02449/TPO Awaiting decision

    TRINITY COURT, 17 HIGHLAND ROAD, BROMLEY, BR1 4AA

    T1 Oak - Reduce the overall size of crown by approximately 2.5m and crown lift to 5m. SUBJECT TO TPO BB9 1960

    17 Jun 2026 114m away Trees
  • 21/01240/S73A5 Awaiting decision

    54, London Road, Bromley, Bromley, BR1 3RA

    Minor Material Amendment under S73 of the Town and Country Planning Act to planning permission reference 21/01240/FULL1 (granted for Mixed-use development comprising of a three storey plus basement (and lift overrun) building to comprise ground floor and basement retail space (385 sqm) (Use Class E) with 8 residential units on upper levels (Use Class C3) to include private amenity space, car parking, loading bay, new bin store, cycle store, landscaping and other associated works. ) (as amended by DC/21/01240/AMD; DC/21/01240/RECON1 and 21/01240/RECON4), in order to vary condition 2 to allow for changes to the approved plans and removal of condition 15 in order to remove living green wall.

    25 Jun 2026 125m away Amendments
  • 24/03269/FULL1 Granted

    54 London Road, Bromley, BR1 3QZ

    Installation of external plant equipment.

    28 Aug 2024 156m away Full applications
  • 26/01748/TPO Granted

    24 BRACKEN HILL CLOSE, BROMLEY, BR1 4AL

    T1 Oak (back window of Flat 24) - Reduce back limb by 2m. T2 Oak – Remove deadwood. G1 Sycamore & Elderberry - Reduce by 1m from wall and remove epicormic growth. T3 Sycamore & Elderberry - Crown lift to 3m. T4 Yew - Reduce back to wall. T5 Red Ivy - Remove from wall. T6 Rhus - Cut back from property. T7 Ivy - Remove from wall. T8 Dead Stick - Remove dead sticks on floor. T9 Dead Elderberry - Remove to ground level. T10 Dead Stem – Remove. G3 Laurel & mixed Shrubs - Reduce height to top of the wall to the end of trellis on wall and cut small Saplings down by half. G4 Mixed Shrubs & Holly - Cut back by 0.5m along wall line. SUBJECT TO TPO BB9 1960

    1 May 2026 162m away Trees
  • 26/01761/FPA Refused

    ALLIANCE HOUSE, 29 LONDON ROAD, BROMLEY, BR1 1DG

    Part demolition of existing building, construction of a two storey rear extension for replacement offices, single storey upward extension to create 5th storey for office space within Use Class E(g)(i), and erection of residential block to the rear containing 9 flats

    4 May 2026 166m away Full applications

In Bromley

  • 26/01794/FPA Refused

    44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN

    Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps

    6 May 2026 Full applications
  • 25/05372/FPA Withdrawn

    LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF

    Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old

    19 Nov 2025 Full applications
  • 26/03046/FPA Awaiting decision

    SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD

    Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping

    29 Jul 2026 Full applications
  • 26/03045/FPA Awaiting decision

    80 HIGH STREET, BECKENHAM, BR3 1ED

    Retention of uPVC double glazed windows in east and south elevations at second and third floor level

    28 Jul 2026 Full applications
  • 26/01592/FPA Granted

    LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE

    Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.

    22 Apr 2026 Full applications