Planning application
26/02236/FPA
78 CROYDON ROAD, PENGE, LONDON, SE20 7AB
Proposal
The erection of a part one/two storey rear extension, rear dormer, basement under proposed extensions, together with a ramp to the side/rear of the property in order to increase the existing 7 bed care home to a 12-bed care home, as well as a proposed crossover and off-street parking to the front, demolition of exiting outbuilding and elevational alterations.
As published by the council, reference 26/02236/FPA
Timeline
Dates from the published record
-
3 Jun 2026
Received by Bromley
-
24 Jul 2026
Validated
Checked as complete and ready for consideration.
-
3 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Bromley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/02313/HPA Awaiting decision
21 STODART ROAD, PENGE, LONDON, SE20 8ET
Single storey rear/side infill extension
-
22/00304/FULL3 Refused
6 The Parade , Croydon Road, Penge, London, SE20 7AA
Replacement shopfront and change of use from shop (Class E) to sui generis use (as a hot food takeaway), with installation of ventilation ducting/flue.
-
25/01642/FULL1 Awaiting decision
Apartment 2, Keswick House, 207A Anerley Road, Penge, London, SE20 8ER
Retention of temporary shed in the rear garden for a period of two years (revised site location plan).
-
26/02334/LDC Awaiting decision
MAPLE TREE, 52-54 MAPLE ROAD, PENGE, LONDON, SE20 8HE
Continued use of House in Multiple Occupation (HMO) LAWFUL DEVELOPMENT CERTIFICATE (EXISTING)
-
26/01446/FPA Granted
34A ELMERS END ROAD, PENGE, LONDON, SE20 7SN
Demolition of existing conservatory and construction of single storey rear extension.
-
26/01411/FPA Granted
91A MAPLE ROAD, PENGE, LONDON, SE20 8LN
Erection of a rear extension (following demolition of rear extension) to provide additional commercial floorspace at No 91a Maple Road, together with associated works.
Other full applications applications
In Bromley
-
26/01794/FPA Refused
44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN
Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps
-
25/05372/FPA Withdrawn
LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF
Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old
-
26/03046/FPA Awaiting decision
SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD
Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping
-
26/03045/FPA Awaiting decision
80 HIGH STREET, BECKENHAM, BR3 1ED
Retention of uPVC double glazed windows in east and south elevations at second and third floor level
-
26/01592/FPA Granted
LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE
Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.