Planning application
26/01062/FPA
BANK COTTAGE, COPERS COPE ROAD, BECKENHAM, BR3 1NZ
Proposal
Demolition of existing dwellinghouse and associated structures and construction of replacement detached three bedroom self-build/custom build dwelling
As published by the council, reference 26/01062/FPA
Timeline
Dates from the published record
-
18 Mar 2026
Received by Bromley
-
13 Apr 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Bromley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
19/04644/CONDT8 Awaiting decision
National Westminster Bank Sports Ground, Copers Cope Road, Beckenham, BR3 1NZ
Details submitted to comply with the requirements of the following conditions relating to planning permission 19/04644/FULL1:Condition 28 - Academy Event Operations Plan
-
26/02669/TPO Awaiting decision
CRYSTAL PALACE FOOTBALL CLUB ACADEMY, COPERS COPE ROAD, BECKENHAM, BR3 1NZ
x2 large Poplar trees overhanging grounds - Cut back to the fence line. SUBJECT TO TPO 2694 (13.7.2020)
-
21/01021/FULL1 Refused
National Westminster Bank Sports Ground , Copers Cope Road, Beckenham, BR3 1NZ
New service vehicular access from Worsley Bridge Road
-
24/03968/AMD2 Granted
86 COPERS COPE ROAD, BECKENHAM, BR3 1RJ
Non-Material Amendment to previous planning permission ref 24/03968/FULL6: Repositioned windows, doors and rooflights Reduced width of rear sliding door.
-
24/02229/AMD Granted
8 Century Way, Beckenham, BR3 1BY
Amendment to previous planning permission ref 24/02229/FULL6: Addition of second rooflight to extension roof.
-
20/00781/COND16 Awaiting decision
Footzie Social Club, Station Approach, Lower Sydenham, London, SE26 5BQ
Details submitted to comply with the requirements of the following conditions relating to planning permission 20/00781/RECON:Condition 11 - Glazing and Ventilation Details
Other full applications applications
In Bromley
-
26/01794/FPA Refused
44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN
Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps
-
25/05372/FPA Withdrawn
LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF
Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old
-
26/03046/FPA Awaiting decision
SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD
Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping
-
26/03045/FPA Awaiting decision
80 HIGH STREET, BECKENHAM, BR3 1ED
Retention of uPVC double glazed windows in east and south elevations at second and third floor level
-
26/01592/FPA Granted
LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE
Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.