Planning application
117 SEVENOAKS WAY, ORPINGTON, BR5 3AQ
Relates to 25/05318/FPA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details submitted to comply with the requirements of the following conditions relating to planning permission 25/05318/FPA: Condition 3 - Construction & Environmental Management Plan Condition 4 - Sustainable Drainage System (SuDS) Condition 5 - Surface Water Drainage Details Condition 6 - Refuse & Recyclable Materials Storage Condition 7 - Bicycle Parking Details
As published by the council, reference 25/05318/CON
Application record
- Reference
- 25/05318/CON
- Type
- Approval of details reserved by a condition
- Status
- Valid
- Received
- 25 Aug 2026
- Validated
- 25 Aug 2026
- Ward
- St Paul's Cray
- Decision by
- Delegated Decision
- Postcode
- BR5 3AQ
Site history
Applications at this address on the Bromley register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
25/05318/FPA Granted
117 SEVENOAKS WAY, ORPINGTON, BR5 3AQ
Sub division of site to create two separate dwellings, to include part one/ two storey side extension with rear dormer to create new dwelling and roof alterations to existing dwelling, erection of outbuilding to rear, and associated landscaping, parking and refuse and cycle storage. (Revision to application ref: 25/01592/FULL1 to allow for alterations to the roof to include a hip to gable design with addition of rear dormer to provide additional bedroom with en-suite at second floor level).
Timeline
Dates from the published record
-
25 Aug 2026
Received by Bromley
-
29 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Bromley took a median of 58 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/05318/FPA Granted
117 SEVENOAKS WAY, ORPINGTON, BR5 3AQ
Sub division of site to create two separate dwellings, to include part one/ two storey side extension with rear dormer to create new dwelling and roof alterations to existing dwelling, erection of outbuilding to rear, and associated landscaping, parking and refuse and cycle storage. (Revision to application ref: 25/01592/FULL1 to allow for alterations to the roof to include a hip to gable design with addition of rear dormer to provide additional bedroom with en-suite at second floor level).
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Bromley for determination, against a statutory target of eight weeks. Over the last year Bromley decided condition discharge and variation applications in a median of 61 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
101 Sevenoaks Way, Orpington, BR5 3AQ
Retention of a single storey outbuilding including changes to the door and windows with installation of double doors at front and rear and a reduction of width. (Amendment to planning permission approved under reference 20/03549/FULL1 for a single storey outbuilding for use as storage with a maximum height of 2.5m)
Granted Full applications Windows or glazing 6 docsSmall domestic -
139 Sevenoaks Way, Orpington, BR5 3AQ
Outbuilding to the rear garden LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
Granted Lawful development 9 docs -
139 Sevenoaks Way, Orpington, BR5 3AQ
Demolition of existing side extension, construction of part one/two storey rear extension, crown roof loft conversion with roof lights to both flank roof slopes and elevational alterations.
Granted Householder Extension Loft or dormer +1 20 docsDomestic -
117 SEVENOAKS WAY, ORPINGTON, BR5 3AQ
Sub division of site to create two separate dwellings, to include part one/ two storey side extension with rear dormer to create new dwelling and roof alterations to existing dwelling, erection of outbuilding to rear, and associated landscaping, parking and refuse and cycle storage. (Revision to application ref: 25/01592/FULL1 to allow for alterations to the roof to include a hip to gable design with addition of rear dormer to provide additional bedroom with en-suite at second floor level).
Granted Full applications New dwelling Extension +2 24 docsSmall domestic -
River Cray Service Station , 147 Sevenoaks Way, Orpington, BR5 3AQ
Amendment to planning ref: 19/01413/FULL1 - Relocation of Fuel/AdBlue Fill points, relocation of vent stack, alteration to underground fuel tanks, and alterations to kerb lines and parking.
Granted Amendments 11 docs -
1 Broomwood Road, Orpington, BR5 2JH
Single storey rear extension, extending beyond the rear wall of the original house by 8m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)
Refused Prior approval Extension 20 docsSmall domestic
Other condition discharge and variation applications
In Bromley
-
24/01841/CON4 Decided
CYPHERS INDOOR BOWLING CLUB, KINGS HALL ROAD, BECKENHAM, BR3 1LP
Details submitted to comply with the requirements of the following conditions relating to planning permission 24/01841/FULL1: Condition 3 - Bicycle Storage Details Condition 15 - Service & Delivery Plan
-
26/01076/CON Granted
38 FOREST RIDGE, KESTON, BR2 6EQ
Details submitted to comply with the requirements of the following conditions relating to planning permission 26/01076/HPA: Condition 5 - Surface Water Drainage
-
24/03516/CON Decided
7 STATION APPROACH, CHELSFIELD, ORPINGTON, BR6 6EU
Details submitted to comply with the requirements of the following conditions relating to planning permission 24/03516/FULL1: Condition 3 - storage of refuse and recyclable materials Condition 4 - bicycle parking Condition 5 - parking spaces and/or garages and turning space
-
26/01629/CON Decided
ST CHRISTOPHERS SCHOOL, 49 BROMLEY ROAD, BECKENHAM, BR3 5PA
Details submitted to comply with the requirements of the following conditions relating to planning permission 26/01629/LBC: Condition 3 - Construction and Environmental Management Plan
-
24/04344/CON2 Awaiting decision
173 REPTON ROAD, ORPINGTON, BR6 9HZ
Details submitted to comply with the requirements of the following conditions relating to planning permission 24/04344/FULL1: Condition 5 - details of the drainage system for surface water drainage