Proposal
Installation of ground mounted solar photovoltaic array
As published by the council, reference 2026/1309
Timeline
Dates from the published record
-
6 May 2026
Received by Broadland
-
9 Jun 2026
Validated
Checked as complete and ready for consideration.
-
14 Jul 2026
Decision issued: Approval with Conditions
-
20 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2026/1309 Granted
The Grange Low Road Tasburgh Norfolk NR15 1AR
Installation of ground mounted solar photovoltaic array
-
2021/1302 Granted
The Grange Low Road Tasburgh NR15 1AR
Conversion of outbuilding to new dwelling
-
2021/1302 Granted
The Grange Low Road Tasburgh NR15 1AR
Conversion of outbuilding to new dwelling
-
2025/3183 Granted
The Beeches Church Hill Tasburgh Norfolk NR15 1NB
Replacement door and frame
-
2021/2286 Granted
The Old Chapel Church Hill Tasburgh NR15 1NB
Variation of condition 2 of 2018/1954 - reconstruct the front wall at the site and raise the ridge height of the existing roof
-
2021/2286 Granted
The Old Chapel Church Hill Tasburgh NR15 1NB
Variation of condition 2 of 2018/1954 - reconstruct the front wall at the site and raise the ridge height of the existing roof
Other full applications applications
In Broadland
-
2026/0754 Granted
Land Adj The Grove Booton Norfolk
Installation of post construction field drainage to support the operation of the Hornsea Project Three onshore export cable route (EIA Development).
-
2025/2830 Granted
Land South Of Dairy Farm Burgh Road Wheatacre Norfolk
Erection of new self build 3-bedroom detached single storey dwelling/farmhouse
-
2026/0612 Granted
Land South East Of Easton Road Marlingford Norfolk
Retention of vehicular crossover Access Point 32 created by Orsted Power (UK) Ltd for the 'Hornsea Project Three Offshore Wind Farm' Project
-
2026/0861 Granted
The School House The Street Framingham Earl Norfolk NR14 7QY
Change of use from a fostering agency (sui generis) to children's day nursery (class E(f)) and associated external alterations
-
2026/2106 Awaiting decision
The Old Vineyard Overwood Lane Forncett St Peter Norfolk
Construction of 1no. rural worker and self build dwelling.