Skip to content
PlanIndex Get alerts
Menu

Planning application

2025/2220

Land East Of Heydon Road Heydon Norfolk

Granted Broadland Full

Proposal

Erection of a Solar Photovoltaic Installation of 30 MW output and all associated supporting infrastructure including, cable routing, inverters and transformers, fencing, CCTV, and landscaping for temporary period of 42 years

As published by the council, reference 2025/2220

Timeline

Dates from the published record

  1. 22 Jul 2025

    Received by Broadland

  2. 5 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 1 Apr 2026

    Decision issued: Approval with Conditions

  4. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/2744 Granted

    Norfolk Boreas Offshore Wind Farm

    National Infrastructure Development Consent Order for The Norfolk Boreas Offshore Wind Farm (Planning Inspectorate Reference: EN10087) -Discharge of Requirement 20 Code of Construction Practice for the Cable Pull and Jointing Works, Stage 8B.

    3 Sep 2025 211m away Conditions
  • 2025/2745 Granted

    Norfolk Vanguard Offshore Wind Farm

    National Infrastructure Development Consent Order for The Norfolk Vanguard Offshore Wind Farm (Planning Inspectorate Reference: EN10079) - Discharge of Requirement (condition) 20: Code of Construction Practice for the Cable Pull and Jointing Works, Stage 12B and 13B.

    3 Sep 2025 211m away Conditions
  • 2025/2742 Granted

    Norfolk Boreas Offshore Wind Farm.

    National Infrastructure Development Consent Order for The Norfolk Boreas Offshore Wind Farm (Planning Inspectorate Reference: EN010087) - Discharge of Requirement (condition) 21: Traffic Management Plan, Travel Plan and Access Management Plan for Cable Pull and Jointing Works, Stage 8B.

    3 Sep 2025 211m away Conditions
  • 2025/2743 Granted

    Norfolk Vanguard Offshore Wind Farm

    National Infrastructure Development Consent Order for The Norfolk Vanguard Offshore Wind Farm (Planning Inspectorate Reference: EN10079) - Discharge of Requirement (condition) 21: Traffic Management Plan, Travel Plan and Access Management Plan for Cable Pull and Jointing Works, Stage 12B and 13B.

    3 Sep 2025 211m away Conditions

In Broadland

  • 2026/0754 Granted

    Land Adj The Grove Booton Norfolk

    Installation of post construction field drainage to support the operation of the Hornsea Project Three onshore export cable route (EIA Development).

    19 Mar 2026 Full applications
  • 2025/2830 Granted

    Land South Of Dairy Farm Burgh Road Wheatacre Norfolk

    Erection of new self build 3-bedroom detached single storey dwelling/farmhouse

    9 Sep 2025 Full applications
  • 2026/0612 Granted

    Land South East Of Easton Road Marlingford Norfolk

    Retention of vehicular crossover Access Point 32 created by Orsted Power (UK) Ltd for the 'Hornsea Project Three Offshore Wind Farm' Project

    27 Feb 2026 Full applications
  • 2026/0861 Granted

    The School House The Street Framingham Earl Norfolk NR14 7QY

    Change of use from a fostering agency (sui generis) to children's day nursery (class E(f)) and associated external alterations

    26 Mar 2026 Full applications
  • 2026/2106 Awaiting decision

    The Old Vineyard Overwood Lane Forncett St Peter Norfolk

    Construction of 1no. rural worker and self build dwelling.

    21 Jul 2026 Full applications