Planning application
2025/2744
Norfolk Boreas Offshore Wind Farm
Proposal
National Infrastructure Development Consent Order for The Norfolk Boreas Offshore Wind Farm (Planning Inspectorate Reference: EN10087) -Discharge of Requirement 20 Code of Construction Practice for the Cable Pull and Jointing Works, Stage 8B.
As published by the council, reference 2025/2744
Timeline
Dates from the published record
-
3 Sep 2025
Received by Broadland
-
14 Nov 2025
Decision issued: Approval of details - Approved
-
20 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
2025/2745 Granted
Norfolk Vanguard Offshore Wind Farm
National Infrastructure Development Consent Order for The Norfolk Vanguard Offshore Wind Farm (Planning Inspectorate Reference: EN10079) - Discharge of Requirement (condition) 20: Code of Construction Practice for the Cable Pull and Jointing Works, Stage 12B and 13B.
-
2025/2742 Granted
Norfolk Boreas Offshore Wind Farm.
National Infrastructure Development Consent Order for The Norfolk Boreas Offshore Wind Farm (Planning Inspectorate Reference: EN010087) - Discharge of Requirement (condition) 21: Traffic Management Plan, Travel Plan and Access Management Plan for Cable Pull and Jointing Works, Stage 8B.
-
2025/2743 Granted
Norfolk Vanguard Offshore Wind Farm
National Infrastructure Development Consent Order for The Norfolk Vanguard Offshore Wind Farm (Planning Inspectorate Reference: EN10079) - Discharge of Requirement (condition) 21: Traffic Management Plan, Travel Plan and Access Management Plan for Cable Pull and Jointing Works, Stage 12B and 13B.
-
2025/2220 Granted
Land East Of Heydon Road Heydon Norfolk
Erection of a Solar Photovoltaic Installation of 30 MW output and all associated supporting infrastructure including, cable routing, inverters and transformers, fencing, CCTV, and landscaping for temporary period of 42 years
Other conditions applications
In Broadland
-
2026/1498 Granted
106 The Street Costessey Norfolk NR8 5DF
Details for conditions 3 - Colours & Materials, 4 - Brickwork, 5 - Windows & Doors, 6 - Rooflights of permission 2026/0128
-
2026/1153 Granted
Dwelling South East Of Waterside Walcot Green Diss Norfolk
Discharge conditions 5 (External materials), 16 (Boundary treatments), 17 (Tree Protection Plan) and the Statutory Biodiversity Gain Plan Condition of planning application 2025/2492
-
2026/1250 Granted
Winston House Felthorpe Road Swannington Norfolk NR9 5TF
Details of condition 9 - Air source heat pump of permission 2024/2077
-
2026/1633 Granted
Land East Of Brundall Memorial Hall Links Avenue Brundall Norfolk NR13 5LL
Details for conditions 7 - Emergency Access Surfacing and 8 - Sewer bulkheads/manhole covers of permission 2023/2989
-
2026/2156 Awaiting decision
Broadland Business Park Old Chapel Way Postwick Norfolk
Details for condition 24 of 2024/3141 - (24) Site Layout Fire Hydrant Locations