Planning application
Land North Of Stoke Lane Dunston Norfolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The installation and operation of a Battery Energy Storage System to provide standby emergency electricity for National Grid in times of high electricity demand or when renewable energy projects are unable to fulfil demand. This would be for the installation of 130MW of modular battery units with ancillary equipment, including power conversion units, 132kV transformer compound, metering cabinet, switchroom, DNO control room and welfare container.
As published by the council, reference 2021/2645
Application record
- Reference
- 2021/2645
- Type
- Full
- Status
- Decided
- Decision
- Approval with Conditions
- Received
- 2 Dec 2021
- Validated
- 2 Dec 2021
- Decided
- 8 Sep 2022
- Ward
- Mulbarton And Stoke Holy Cross
- Parish
- Stoke Holy Cross
- Decision by
- Development Management Committee
Site history
Applications at this address on the Broadland register
This site has had 2 applications since 2021: 2 approved, 0 refused.
-
2025/3352 Granted
Land North Of Stoke Lane Dunston Norfolk
Details reserved by condition 3 (secondary access details) and condition 4 (tree protection scheme) of 2024/0243
Timeline
Dates from the published record
-
2 Dec 2021
Received by Broadland
-
8 Sep 2022
Decision issued: Approval with Conditions
-
24 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Clive Fagg Planning Agent, a planning consultancy
21 applications on PlanIndex · across 17 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
83 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Broadland granted permission on 8 September 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land North Of Stoke Lane Dunston Norfolk
The installation and operation of a Battery Energy Storage System to provide standby emergency electricity for National Grid in times of high electricity demand or when renewable energy projects are unable to fulfil demand. This would be for the installation of 130MW of modular battery units with ancillary equipment, including power conversion units, 132kV transformer compound, metering cabinet, switchroom, DNO control room and welfare container.
Granted Full applications 83 docs -
Land North Of Stoke Lane Dunston Norfolk
Details reserved by condition 3 (secondary access details) and condition 4 (tree protection scheme) of 2024/0243
Granted Conditions Trees 17 docs -
Land North Of Stoke Lane Dunston Norfolk
Details reserved by condition 3 (secondary access details) and condition 4 (tree protection scheme) of 2024/0243
Granted Conditions Trees 17 docs -
Land To The West Of Norwich Road Swainsthorpe Norfolk
Details for conditions 3 - Ecological Design Strategy and 4 - Surface Water Drainage of permission 2025/2445
Granted Conditions 4 docs -
Land To The West Of Norwich Road Swainsthorpe Norfolk
Details for conditions 3 - Ecological Design Strategy and 4 - Surface Water Drainage of permission 2025/2445
Granted Conditions 4 docs -
Land To The West Of Norwich Road Swainsthorpe Norfolk
Proposed retention of hard standing for temporary standing of sugar beet and other farm products
Granted Full applications 11 docs
Other full applications
In Broadland
-
2026/1695 Granted
86 Bromedale Avenue Mulbarton Norfolk NR14 8GG
Part change of use of garage to hair studio
-
2026/0802 Granted
Land North Of 132 High Road Needham Norfolk
Erection of detached double garage to the front
-
2026/1219 Granted
37 Broomefield Road Stoke Holy Cross Norfolk NR14 8FF
Change of use of land from agricultural use to residential curtilage.
-
2026/1490 Granted
The Harte Of Costessey Townhouse Road Costessey Norfolk NR8 5BS
Proposed New Single Storey Restaurant Extension to the Harte Public House
-
2026/1854 Granted
35 Market Place Aylsham Norfolk NR11 6EN
Change of use from office (Class E) to Tattoo studio (sui generis)