Proposal
26 Solar PV panel ground mount Array Installation.
As published by the council, reference 2021/1221
Timeline
Dates from the published record
-
26 May 2021
Received by Broadland
-
6 Aug 2021
Decision issued: Approval with Conditions
-
24 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2021/1221 Granted
Red House 1 Mill Road Burston IP22 5TW
26 Solar PV panel ground mount Array Installation.
-
2026/1766 Awaiting decision
5 Mill Road Burston Norfolk IP22 5TW
Part demolition of the existing outbuilding. Erection of single storey rear extension.
-
2026/1766 Awaiting decision
5 Mill Road Burston Norfolk IP22 5TW
Part demolition of the existing outbuilding. Erection of single storey rear extension.
-
2022/0162 Granted
Red House 1 Mill Road Burston Norfolk IP22 5TW
Installation of a window to eastern end of south facing wall, with an internal stud and plaster wall to facilitate the addition of upstairs shower room with access via existing doorway from bedroom
-
2022/0162 Granted
Red House 1 Mill Road Burston Norfolk IP22 5TW
Installation of a window to eastern end of south facing wall, with an internal stud and plaster wall to facilitate the addition of upstairs shower room with access via existing doorway from bedroom
-
2021/2617 Granted
Fenlands Diss Road Burston IP22 5TP
P1 Plum - fell C1 Cherry - fell B1 Birch - fell L1 Laburnum - reduce height from 7m to 4m F1 & F2 Yew - reduce crown height from 5m to 4m and spread from 5m to 3m F4 Yew - reduce crown height from 7m to 4-5m H1 Hazel & Hazel group along SW boundary by Frenze Beck, coppicing 50% of stems now and 50% in a year or two coppice other 50%
Other full applications applications
In Broadland
-
2026/0754 Granted
Land Adj The Grove Booton Norfolk
Installation of post construction field drainage to support the operation of the Hornsea Project Three onshore export cable route (EIA Development).
-
2025/2830 Granted
Land South Of Dairy Farm Burgh Road Wheatacre Norfolk
Erection of new self build 3-bedroom detached single storey dwelling/farmhouse
-
2026/0612 Granted
Land South East Of Easton Road Marlingford Norfolk
Retention of vehicular crossover Access Point 32 created by Orsted Power (UK) Ltd for the 'Hornsea Project Three Offshore Wind Farm' Project
-
2026/0861 Granted
The School House The Street Framingham Earl Norfolk NR14 7QY
Change of use from a fostering agency (sui generis) to children's day nursery (class E(f)) and associated external alterations
-
2026/2106 Awaiting decision
The Old Vineyard Overwood Lane Forncett St Peter Norfolk
Construction of 1no. rural worker and self build dwelling.