Proposal
Conversion and extension of an existing detached garage to form a residential annexe, plus a new external enclosed central heating boiler at the main dwelling.
As published by the council, reference 2021/1044
Timeline
Dates from the published record
-
6 May 2021
Received by Broadland
-
14 Jul 2021
Decision issued: Approval with Conditions
-
30 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2021/1045 Granted
122 Norwich Road Tacolneston NR16 1AL
Conversion and extension of an existing detached garage to form a residential annexe, plus a new external enclosed central heating boiler at the main dwelling.
-
2021/1044 Granted
122 Norwich Road Tacolneston NR16 1AL
Conversion and extension of an existing detached garage to form a residential annexe, plus a new external enclosed central heating boiler at the main dwelling.
-
2021/1045 Granted
122 Norwich Road Tacolneston NR16 1AL
Conversion and extension of an existing detached garage to form a residential annexe, plus a new external enclosed central heating boiler at the main dwelling.
-
2022/0131 Granted
Tacolnestion Voluntary Aided Primary School 112 Norwich Road Tacolneston Norfolk NR16 1AL
Prune trees to give 1.5 to 2m clearance of the low voltage lines
-
2022/0131 Granted
Tacolnestion Voluntary Aided Primary School 112 Norwich Road Tacolneston Norfolk NR16 1AL
Prune trees to give 1.5 to 2m clearance of the low voltage lines
-
2026/0383 Granted
116 Norwich Road Tacolneston Norfolk NR16 1AL
G1 - mixed native trees (marked in red), predominantly field maple/hedgerow to reduce north facing branches overhanging 116 Norwich Road - Crown Lifting clearance to 1.5-2.5m
Other full applications applications
In Broadland
-
2026/0754 Granted
Land Adj The Grove Booton Norfolk
Installation of post construction field drainage to support the operation of the Hornsea Project Three onshore export cable route (EIA Development).
-
2025/2830 Granted
Land South Of Dairy Farm Burgh Road Wheatacre Norfolk
Erection of new self build 3-bedroom detached single storey dwelling/farmhouse
-
2026/0612 Granted
Land South East Of Easton Road Marlingford Norfolk
Retention of vehicular crossover Access Point 32 created by Orsted Power (UK) Ltd for the 'Hornsea Project Three Offshore Wind Farm' Project
-
2026/0861 Granted
The School House The Street Framingham Earl Norfolk NR14 7QY
Change of use from a fostering agency (sui generis) to children's day nursery (class E(f)) and associated external alterations
-
2026/2106 Awaiting decision
The Old Vineyard Overwood Lane Forncett St Peter Norfolk
Construction of 1no. rural worker and self build dwelling.