Planning application
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Relates to 22/P/1768/R3EIA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Request to re discharge condition numbers 7(b), 7(f) and 29 (Phase 2b Riverside Bridge and Phase 2d Landscape Planting) on application 22/P/1768/R3EIA
As published by the council, reference 25/P/2521/AOC
Application record
- Reference
- 25/P/2521/AOC
- Type
- Approval of Condition
- Status
- Decided
- Decision
- Granted As published: Approve (discharge condition)(RDC)
- Received
- 4 Dec 2025
- Validated
- 4 Dec 2025
- Decided
- 21 Jan 2026
- Ward
- Banwell And Winscombe
- Parish
- Winscombe And Sandford
- Decision by
- Delegated Decision
Site history
Applications at this address on the Bristol, City of register
This site has had 4 applications since 2022: 3 approved, 0 refused.
-
25/P/2300/AOC Awaiting decision
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Request to discharge condition numbers 4 (Construction Management Plan), 5 (CEMP), 6 (LEMP), 7A (Hard Landscaping), 7C (Street Furniture and Equipment), 7D (Bicycle Storage and hubs), 7G (Street Lighting), 7H (Bus Stop Infrastructure), 7J (Boundary Fences and Treatments),7K (Surface Water drainage), 7L (Measures to prevent unauthorised access along Shared use paths), 7M (Signage Strategy), 8 (Speed monitoring plan (NSC scope) 9 (Surface Water drainage) 19 (Road Safety Audit) 27E (Speed reduction measures at Sidcot road, Hillier's Land and Dinghurst Road) 27F (Pedestrian Facilities at Nye Road junction) 27G (Bus Bays on A368/Greenhill Road by Sandford Primary School) 27H (PRoW AX14/21 and A368/Greenhill Road Cyclist crossing point), 27I (Crossing point PRoW AX14/36 junction with Church Lane), 27J (Crossing point/ narrowing for upgraded PRoW AX14/36 junction with Ladymead Lane), 27K (Bus stop improvements at Hilliers Lane/Dinghurst Road (A368), 27L (Bus stop buildouts east of the Railway Inn), 28A (Vehicle tracking), 28C (Vehicle tracking) and 30 (Road lighting design) on application 22/P/1768/R3EIA
-
25/P/1574/AOC Granted
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Request for the partial discharge of details reserved by conditions 27(a) (Means of restraint for cyclists and horse riders adjacent to embankments) and 27(c) (Control feature at the terminus of Eastermead Lane) from the Banwell Bypass and Highway Improvement Scheme application 22/P/1768/R3EIA.
-
22/P/1768/R3EIA Granted
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Construction of a 3.3km single carriageway road from the A371 Summer Lane to A368 Towerhead Road, including a 3m shared use path to Sandford, one bridge, ten culverts, associated infrastructure, and landscaping. Construction of a 0.63km (including junction link to Banwell Bypass) single carriageway Southern Link Road, including associated infrastructure and landscaping. Mitigation and enhancement measures, which consist of environmental mitigation and enhancement measures in connection with the Banwell Bypass and the Southern Link including flood compensation areas, planting and habitat creation, attenuation basins, replacement playing fields at Banwell Football Club, associated infrastructure and landscaping. Placemaking improvements within Banwell, comprising mitigation and enhancement measures to the public realm. Demolition of a wall at 25 Castle Hill. Active travel routes including works to footpaths, cycleways, and bridleways. Improvements to the wider local road network in Sandford, Churchill, Winscombe and Locking and creation of shared use paths between Sandford and Churchill and Langford and Churchill
Timeline
Dates from the published record
-
4 Dec 2025
Received by Bristol, City of
-
21 Jan 2026
Decision issued: Approve (discharge condition)(RDC)
-
21 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
22/P/1768/R3EIA Granted
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Construction of a 3.3km single carriageway road from the A371 Summer Lane to A368 Towerhead Road, including a 3m shared use path to Sandford, one bridge, ten culverts, associated infrastructure, and landscaping. Construction of a 0.63km (including junction link to Banwell Bypass) single carriageway Southern Link Road, including associated infrastructure and landscaping. Mitigation and enhancement measures, which consist of environmental mitigation and enhancement measures in connection with the Banwell Bypass and the Southern Link including flood compensation areas, planting and habitat creation, attenuation basins, replacement playing fields at Banwell Football Club, associated infrastructure and landscaping. Placemaking improvements within Banwell, comprising mitigation and enhancement measures to the public realm. Demolition of a wall at 25 Castle Hill. Active travel routes including works to footpaths, cycleways, and bridleways. Improvements to the wider local road network in Sandford, Churchill, Winscombe and Locking and creation of shared use paths between Sandford and Churchill and Langford and Churchill
Who's behind it
Company information only, from the register and Companies House
Arup Agent, registered in London
Active · incorporated 1990 · London
254 applications on PlanIndex · across 56 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordNorth Somerset Council Applicant
33 applications on PlanIndex · across 2 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
- DECISION LETTER AOC
- TREE OFFICER COMMENT 08/01/26
- FLOOD RISK MANAGEMENT COMMENTS
- HIGHWAYS OFFICER COMMENT 15/12/25
- APPLICATIONFORMREDACTED
- RE DISCHARGE OF CONDITIONS 7 B F AND 29 COVERING LETTER
- LANDSCAPING AND SEEDING PHASE 2 SHEET 2 OF 11
- LANDSCAPING AND SEEDING PHASE 2 SHEET 4 OF 11
- LANDSCAPING AND SEEDING PHASE 2 SHEET 3 OF 11
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Bristol, City of granted permission on 21 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Bristol, City of
-
26/P/1583/AOC Granted
Garden Cottage Long Lane Wrington BS40 5SA
Request to discharge condition 4 ( Off-site biodiversity units) and Biodiversity Gain plan on planning application 25/P/2616/FUL
-
26/P/1215/AOC Granted
24 Grenville Avenue Locking Weston-super-Mare BS24 8AR
Request to discharge the BNG (Biodiversity Net Gain) condition on application 25/P/1917/FUL.
-
26/P/1239/AOC Granted
Police Maintenance Depot Stuart Road Weston-super-Mare BS23 3XN
Request to discharge condition 4 (Stage 1 Road Safety Audit) on application 26/P/0860/S73.
-
26/P/1521/AOC Granted
17 - 21 High Street Weston-super-Mare BS23 1HA
Request to discharge conditions 4 (Biodiversity), 5 (Hard and soft landscaping), 6 (Energy report), 11 (Access ramp), 12 (Proposed shopfront), 14 (Materials) and 17 (Lighting) on application 23/P/0985/FUL.
-
26/P/1632/AOC Granted
93 Station Road Nailsea BS48 1TD
Request to discharge condition 8 (spiral staircase) from application 24/P/2187/LBC