Skip to content
PlanIndex Get alerts
Menu

Planning application

BH2026/00301

Patcham Service Station London Road Patcham Brighton BN1 8YB

Awaiting decision Brighton and Hove Full Planning

Proposal

Replacement of two existing jet washes with three new jet washes, addition of side extension to sales building to accommodate an accessible toilet plus canopy and associated works.

As published by the council, reference BH2026/00301

Timeline

Dates from the published record

  1. 10 Feb 2026

    Received by Brighton and Hove

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Brighton and Hove for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • BH2025/02147 Granted

    41 Old London Road Brighton BN1 8XR

    Non-material amendment to application BH2022/00183 to change the development description to: Replacement of existing main workshop building with new workshop building.

    29 Aug 2025 54m away Amendments
  • BH2014/03168 Granted

    24, PARK COURT Old London Road, Brighton, BN1 8XS

    Replacement of timber windows and door with UPVC windows and door.

    19 Sep 2014 156m away Full applications
  • BH2007/04477 Granted

    PARK COURT, Old London Road, Brighton, BN1 8XS

    12 additional parking bays, 4 disabled bays, bicycle storage and associated works.

    3 Dec 2007 156m away Full applications
  • BH2025/01852 Refused

    27 Highview Way Brighton BN1 8WS

    Regulation 5 Notice of Intention to install 1 new 10m light wooden pole.

    25 Jul 2025 190m away Prior approval
  • BH2025/02290 Granted

    29 Church Hill Brighton BN1 8YE

    Erection of a single storey garden room

    15 Sep 2025 198m away Householder
  • BH2025/02035 Granted

    18 Brangwyn Crescent Brighton BN1 8XJ

    Erection of ground and first floor front bay windows.

    15 Aug 2025 204m away Householder

In Brighton and Hove

  • BH2026/00371 Awaiting decision

    27 Ladies Mile Road Brighton BN1 8QE

    Demolition of the existing front outdoor seating area and installation of a new front outdoor seating area with a powder coated aluminium frame and retractable roof.

    18 Feb 2026 Full applications
  • BH2026/00352 Awaiting decision

    34 Robertson Road Brighton BN1 5NL

    Conversion of a three-storey maisonette and lower ground-floor flat into a single dwelling house (C3). Erection of a single-storey side and rear extension.

    17 Feb 2026 Full applications
  • BH2025/03046 Granted

    35 Montpelier Crescent Brighton BN1 3JL

    Replacement of external fire escape stairs to rear and replacement rear window to match existing.

    16 Dec 2025 Full applications
  • BH2026/00339 Awaiting decision

    First Floor Flat 55 Carlisle Road Hove BN3 4FQ

    Roof alterations to include the installation of front rooflights and rear dormer.

    13 Feb 2026 Full applications
  • BH2026/00319 Awaiting decision

    98 Blatchington Road Hove BN3 3YF

    Replacement of existing shopfront and entrance door with new aluminium shopfront and entrance door.

    11 Feb 2026 Full applications