Planning application
Site Of Amex House Edward Street Brighton BN88 1AH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of Block F Ground Floor - to include Use Class E(d) further to Use Class E(g)(i), formerly Use Class B1, and change in hours of operation.
As published by the council, reference BH2025/03092
Application record
- Reference
- BH2025/03092
- Type
- Full Planning
- Status
- Registered
- Received
- 22 Dec 2025
- Validated
- 5 Feb 2026
- Ward
- Queen's Park
- Postcode
- BN88 1AH
Site history
Applications at this address on the Brighton and Hove register
This site has had 4 applications since 2025: 1 approved, 0 refused.
-
BH2026/00020 Awaiting decision
Site Of Amex House Edward Street Brighton BN88 1AH
Change of use of Block F Lower Ground Floor - to include Use Class E(d) further to Use Class E(g)(i), formerly Use Class B1, and change in hours of operation
-
BH2025/03081 Awaiting decision
Site Of Amex House Edward Street Brighton BN88 1AH
Change of use of Block E - to include Use Class E(d) further to Use Class E(g)(i), formerly Use Class B1.
-
BH2025/02307 Granted
Site Of Amex House Edward Street Brighton BN88 1AH
Change of use of Block C - to include Use Class E (d) further to an existing mixed use of Use Classes A1, A3, B1a, C3 and D1 at part of the Ground Floor; and Use Class B1 to Class E(d), and E(g(i)) at Lower Ground Floor.
Timeline
Dates from the published record
-
22 Dec 2025
Received by Brighton and Hove
-
5 Feb 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Brighton and Hove took a median of 63 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Brighton and Hove for determination, against a statutory target of eight weeks. Over the last year Brighton and Hove decided full applications in a median of 85 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Site Of Amex House Edward Street Brighton BN88 1AH
81% historically approved · decision due ~2 Apr
Change of use of Block E - to include Use Class E(d) further to Use Class E(g)(i), formerly Use Class B1.
Awaiting decision Full applications 20 docs -
Site Of Amex House Edward Street Brighton BN88 1AH
81% historically approved · decision due ~2 Apr
Change of use of Block F Lower Ground Floor - to include Use Class E(d) further to Use Class E(g)(i), formerly Use Class B1, and change in hours of operation
Awaiting decision Full applications 22 docs -
Site Of Amex House Edward Street Brighton BN88 1AH
Change of use of Block C - to include Use Class E (d) further to an existing mixed use of Use Classes A1, A3, B1a, C3 and D1 at part of the Ground Floor; and Use Class B1 to Class E(d), and E(g(i)) at Lower Ground Floor.
Granted Full applications 43 docs -
Kemptown House 72 Carlton Hill Brighton BN2 0GW
100% historically approved · decision due ~29 Jan
Application for approval of details reserved by condition 5 (Construction Environmental Management Plan (CEMP)) of application BH2022/00717 (allowed on appeal).
Awaiting decision Conditions 2 docs -
70 Carlton Hill Brighton BN2 0GW
81% historically approved · decision due ~4 Dec
Refurbishment of existing office building, reconstruction of roof including replacement dormers and rooflights to roof, replacement zinc roof finish, alterations and replacements of windows (including bay roofs) and doors, new side pedestrian gate, alterations to rear garden landscaping and access, and other associated external alterations.
Awaiting decision Full applications Loft or dormer Roofing +1 35 docs -
Brighton Police Station John Street Brighton BN2 0LA
To install electronic communications apparatus/development ancillary to radio equipment housing.
Granted Prior approval 3 docs
Other full applications
In Brighton and Hove
-
BH2026/00371 Awaiting decision
27 Ladies Mile Road Brighton BN1 8QE
Demolition of the existing front outdoor seating area and installation of a new front outdoor seating area with a powder coated aluminium frame and retractable roof.
-
BH2026/00352 Awaiting decision
34 Robertson Road Brighton BN1 5NL
Conversion of a three-storey maisonette and lower ground-floor flat into a single dwelling house (C3). Erection of a single-storey side and rear extension.
-
BH2025/03046 Granted
35 Montpelier Crescent Brighton BN1 3JL
Replacement of external fire escape stairs to rear and replacement rear window to match existing.
-
BH2026/00339 Awaiting decision
First Floor Flat 55 Carlisle Road Hove BN3 4FQ
Roof alterations to include the installation of front rooflights and rear dormer.
-
BH2026/00319 Awaiting decision
98 Blatchington Road Hove BN3 3YF
Replacement of existing shopfront and entrance door with new aluminium shopfront and entrance door.