Planning application
BH2025/03078
Flat 2 4 - 5 Palmeira Square Hove BN3 2JA
Proposal
To install fibre broadband.
As published by the council, reference BH2025/03078
Timeline
Dates from the published record
-
16 Dec 2025
Received by Brighton and Hove
-
11 Feb 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Brighton and Hove for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
BH2025/02130 Awaiting decision
Flat 4 4 - 5 Palmeira Square Hove BN3 2JA
To install fibre broadband by Brighton Fibre. To bring 48F-ULW cable (7mm) cable from the telecoms chamber recessed within the pavement in front of the property using an existing route for services from below road level through the basement communal areas to the rear of the property.? At the rear there will be a small junction box (or distribution point, DP) (see photographs) 193 mm H x 155 mm W x 77 mm D (grey) at low level on a side return elevation with a 3mm wire thereafter again following an existing route for lighting at the rear as much as possible (see plan and photographs).
-
BH2025/03070 Awaiting decision
Flat 2 4 - 5 Palmeira Square Hove BN3 2JA
To install telecommunications apparatus.
-
BH2025/02516 Awaiting decision
Flat 3 8 Palmeira Square Hove BN3 2JB
Replace front door.
-
BH2025/02249 Granted
Brookhollow 8 Holland Road Hove BN3 1JJ
Erection of pitched roof dormer to side elevation, hip to barn roof extension, insertion of two sets of Velux windows in rear roof slopes and three Velux windows in front roof slope.
-
BH2025/01939 Granted
29 Palmeira Square Hove BN3 2JP
Large bay tree located at the rear boundary is overgrown and obstructing light from the properties located to behind, and potentially causing damage going forward due to it being overgrown. We are looking to reduce the height a width of the tree by 1.5m. The tree is a bay tree.
-
BH2025/01904 Granted
6 Adelaide Crescent Hove BN3 2JE
Installation of Commemorative Brighton and Hove Blue Plaque (Historic Buildings and Places) on ground floor front elevation.
Other lawful development applications
In Brighton and Hove
-
BH2026/00373 Awaiting decision
245 Hangleton Road Hove BN3 7LR
Certificate of lawfulness for proposed roof alterations/extensions including hip to gable extension with dormer to rear roofslope and rooflights to front roof slope.
-
BH2026/00349 Awaiting decision
42 Tongdean Road Hove BN3 6QE
Certificate of lawfulness for proposed erection of single storey side extension.
-
BH2026/00336 Awaiting decision
13 Hythe Road Brighton BN1 6JR
Certificate of lawfulness for proposed loft conversion incorporating rear dormer and 2no. front rooflights.
-
BH2025/03071 Granted
18 Pinfold Close Brighton BN2 6WG
Certificate of lawfulness for the proposed single storey rear extension.
-
BH2026/00328 Awaiting decision
6 Goodwood Way Brighton BN2 4PW
Certificate of Lawfulness for the proposed loft conversion, including hip-to-gable alteration and rear dormer extension, together with fenestration alterations to the side and rear elevations, installation of a rooflight to the front elevation, and solar panels to the rear elevation.