Skip to content
PlanIndex Get alerts
Menu

Planning application

BH2025/03064

70A Old Shoreham Road Hove BN3 6HJ

Awaiting decision Brighton and Hove Lawful Development Certificate Proposed

Proposal

Certificate of lawfulness for proposed part use for occasional English language support sessions, ancillary to primary Class E use.

As published by the council, reference BH2025/03064

Timeline

Dates from the published record

  1. 18 Dec 2025

    Received by Brighton and Hove

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Brighton and Hove for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • BH2025/02121 Awaiting decision

    70B Old Shoreham Road Hove BN3 6HJ

    Erection of a two storey detached dwellinghouse with attic accommodation (C3).

    28 Aug 2025 18m away Full applications
  • BH2025/02676 Withdrawn

    The Cottage 28 Wilbury Gardens Hove BN3 6HY

    Erection of single storey side extension.

    3 Nov 2025 60m away Full applications
  • BH2025/02110 Granted

    Flat 6 99 The Drive Hove BN3 6GE

    Installation of rooflights to front and side elevations. Revised fenestration accessing rear roof terrace incorporating installation of glass balustrading.

    27 Aug 2025 208m away Full applications
  • BH2025/02286 Withdrawn

    33 Old Shoreham Road Hove BN3 6NR

    Certificate of lawfulness for proposed conversion of 2no. flats (C3) into a single dwellinghouse (C3) including replacement of side window with external door.

    15 Sep 2025 210m away Lawful development
  • BH2025/02052 Granted

    73 Fonthill Road Hove BN3 6HB

    Certifciate of lawfulness is sought for a single storey rear side extension

    18 Aug 2025 217m away Lawful development
  • BH2025/01955 Granted

    69 Fonthill Road Hove BN3 6HB

    Erection of a single storey rear and side wraparound extension.

    8 Aug 2025 219m away Householder

In Brighton and Hove

  • BH2026/00373 Awaiting decision

    245 Hangleton Road Hove BN3 7LR

    Certificate of lawfulness for proposed roof alterations/extensions including hip to gable extension with dormer to rear roofslope and rooflights to front roof slope.

    18 Feb 2026 Lawful development
  • BH2026/00349 Awaiting decision

    42 Tongdean Road Hove BN3 6QE

    Certificate of lawfulness for proposed erection of single storey side extension.

    16 Feb 2026 Lawful development
  • BH2026/00336 Awaiting decision

    13 Hythe Road Brighton BN1 6JR

    Certificate of lawfulness for proposed loft conversion incorporating rear dormer and 2no. front rooflights.

    13 Feb 2026 Lawful development
  • BH2025/03071 Granted

    18 Pinfold Close Brighton BN2 6WG

    Certificate of lawfulness for the proposed single storey rear extension.

    19 Dec 2025 Lawful development
  • BH2026/00328 Awaiting decision

    6 Goodwood Way Brighton BN2 4PW

    Certificate of Lawfulness for the proposed loft conversion, including hip-to-gable alteration and rear dormer extension, together with fenestration alterations to the side and rear elevations, installation of a rooflight to the front elevation, and solar panels to the rear elevation.

    12 Feb 2026 Lawful development